Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules
|
|
- Bjørn Hjelle
- 8 år siden
- Visninger:
Transkript
1 Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules Installation instructions Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS BJGU/GUSO Checked NODIS MARE Approved NODIS OLGR Title SAFERING/SAFEPLUS RETROFIT OF RONIS KEY INTERLOCK TYPE EL11AP C AND Sl MODULES Language EN/NO 1/6
2 General Safety Instructions! - Check that the installation, putting into service and maintenance of this apparatus is carried out by qualified personnel with knowledge of the apparatus to be installed. All the procedures as laid out in this installation and service instruction manual must be known. - To perform the following installation requires a vocational training (electrician, electrical engineer) and some years of experience. - Make sure the standard and legal prescriptions are adhered to during the installation, putting into service and maintenance. All procedures must be carried out in strict compliance to the rules of good working practice and safety at the work site. - Please read this instruction manual and plan the work before starting the installation. - Strictly follow the information given in this instruction manual. - Pay special attention to the danger notes as indicated in this manual by the following symbol: - Check and ensure that the personnel operating the apparatus have the instruction manual at hand, as well as the necessary information for correct installation. - Before starting the retrofit upgrade the switchgear must be deenergized. The switchgear is de-energized by operating the switches to disconnected position. - Check that all mechanism springs are discharged. If in doubt, close and open the switch. 2/6
3 Sikkerhetsinstruks! - Sørg for at installasjon, idriftsettelse og vedlikehold er utført av kvalifisert personell som har kjennskap til utstyret som blir installert. Vedkommende må også kjenne til prosedyrer som er beskrevet i dette installasjonsheftet. - For å utføre følgende installasjon kreves yrkesfaglig erfaring som elektriker, elektroingeniør eller liknende. - Sørg for at sikkerheten rundt installasjonsarbeidet er ivaretatt i henhold til nasjonale normer og forskrifter. Arbeidet utføres av en fagperson. - Les manualen nøye før arbeidet påbegynnes. - Utfør installasjonen nøyaktig som beskrevet i denne manualen. - Vær spesielt nøye med å lese og følge anvisninger når det er indikert med fare symbolet: - Sørg for at betjeningspersonell har dette installasjonsheftet og har fått nødvendig informasjon når de betjener det installerte utstyret. - Før installasjonen påbegynnes, sørg for at avgangen det skal jobbes på er strømløs og at bryterne er utkoblet. - Alle fjærer på mekanismene må være avspent. For å forsikre seg om dette kan bryteren lukkes og åpnes. 3/6
4 Installation procedure The pictures and drawings are of a C-module, but this document is also valid for a Sl module plus all types of position indicators Bilder og tegninger er av C-felt, men dette dokumentet er også gyldig for Sl-felt samt alle typer stillingsindikeringer Used until May 2007 Brukt inntil mai 2007 Existing front covers Dagens frontdeksler 1. Operate the load break switch to open position Betjen lastbryteren til utkoblet posisjon 2. Unscrew the fixing screw and remove the upper front cover Løsne festeskruen og fjern det øvre frontdekslet 3 3. Unscrew and remove the padlock bracket Skru av hengelåsbraketten 4/6
5 6 5 4 Locked in open position Låst i åpen stilling Locked in closed position Låst i lukket stilling 4. Place the locking disc on the operating shaft The position of the locking disc depends on whether the customer s requirement is to lock the load switch in open or closed position Re-place and fix the padlock bracket which was removed during step 3 Plasser låseskiven på betjeningsakselen Stillingen på låseskiven avhenger av om kunden ønsker bryteren låst i åpen eller lukket stilling Fest hengelåsbraketten som ble fjernet under punkt 3 5. Secure the locking disc with a circlip Sikre låseskiven med en seegering 6. Fix the Ronis interlock with the circular locking lever pointing towards the operating shaft with 4 pieces of M5x30 screws Fest Ronislåsen med det runde låsestaget mot betjeningsakselen med 4 stk M5x30 skruer 5/6
6 7. Re-place and fix the upper front cover Sett tilbake og fest det øvre frontdekslet 6/6
Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules
Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared
Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules
Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name
SafeRing / SafePlus Retrofit of under voltage coil V Module
SafeRing / SafePlus Retrofit of under voltage coil V Module Installation Instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO Checked
SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock type EL11AP C, De, F and Sl modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock
SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module
SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date
SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules
SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules Installation instructions www.abb.com Document status Responsible
SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism
SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location
SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module
SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO
SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module
SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO Checked
SafeRing / SafePlus Retrofit capacitive voltage indication type VDS C, F, De and V Modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties without SafeRing / SafePlus Retrofit capacitive voltage indication type
SafeRing / SafePlus Retrofit of capacitive voltage indication type VPIS C, De, F and V Modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties without SafeRing / SafePlus Retrofit of capacitive voltage indication type
REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION
2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm
MONTASJEBESKRIVELSE INSTALLATION GUIDE
MONTASJEBESKRIVELSE INSTALLATION GUIDE ADVARSEL WARNINGS Dette armaturet er et Klasse II produkt som IKKE SKAL TILKOBLES JORD. This device is a class II product: DO NOT CONNECT THE LAMP and the pole to
Mounting the electrically elevating legrest
ASSEMBLY INSTRUCTION Mounting the electrically elevating legrest EN NO 9000A ..8 9000 Mounting the electrically elevating legrest Preparation Note! Switch off the wheelchair via remote control. Instructions
Replacing the tube and/or tyre of a drive wheel, indoor/outdoor
ASSEMBLY INSTRUCTION Replacing the tube and/or tyre of a drive wheel, indoor/outdoor EN NO 9010182A 5.2.7 9010182 Replacing the tube and/or tyre of a drive wheel, indoor/outdoor Preparation Be sure that
Windlass Control Panel
SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e
Replacing the carbon brushes
ASSEMBLY INSTRUCTION Replacing the carbon brushes EN NO 9010180A 5.2.4 9010180 Replacing the carbon brushes (Puma 20/40) Preparation Switch off the wheelchair via the remote control. Be sure that the
Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite
Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite Art.nr. 05-900-573-00. Page 1 of 9 Norsk Monteringsanvisning taksokkel Denne monteringsmanualen
KAMPANJE APK : APK-5: Skifte pakninger mellom turbo og CCDPF
KAMPANJE APK-5 20150722: APK-5: Skifte pakninger mellom turbo og CCDPF Berørte modeller for APK-5: Vitara APK416D, totalt 66 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke
The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.
1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers
IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM!
GB IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! NOR VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM! Produktmål, materiale: 135x77x72 cm Furu Proper use This
KAMPANJE APK : APK-8: Bytte bakaksel bolter
KAMPANJE APK-8 20160222: APK-8: Bytte bakaksel bolter Berørte modeller for APK-8: Vitara APK, S-cross AKK, og Swift AZG. Totalt 454 biler på det norske markedet. Liste med chassisnummer legges ikke ved,
Start Here USB *CC * *CC * USB USB
1 USB Start Here USB 11 USB WARNING: To ensure that the software is installed correctly, do not connect the USB cable until step 11. 11 USB 2 a. b. Lower both the paper tray and the print cartridge door.
Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3
Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL
Handicare Emineo Ledsagerbrems Basic / Drum brake Basic
Monteringsanvisning Assembly instructions Handicare Emineo Ledsagerbrems Basic / Drum brake Basic Beskrivelse/Description Art. nr / Item no. 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 22 Flexel/Compact
Replacing the batteries
ASSEMBLY INSTRUCTION Replacing the batteries EN NO 9010189A 5.2.14 9010189 Replacing the batteries Preparation Switch off the wheelchair via the remote control. Remove the fuses from the battery compartment
Montering av Lian Skyvedør Installation of Lian Sliding Door
Montering av Lian Skyvedør Installation of Lian Sliding Door Les dette før du starter monteringen! Read these instructions carefully before installation. Sjekk nøye at produktet stemmer med bestilling
Independent Inspection
Independent Inspection Odd Ivar Johnsen Vidar Nystad Independent Inspection Mål: Felles forståelse og utøvelse av "Independent Inspection" i forbindelse med "Critical Maintenance Task". Independent Inspection
Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions
Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Vigdis Bjørlo 2016-02-05 Suppliers' obligations in relation to the Construction Client Regulations
Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter 01.01.2015.
S e r v i c e o r d r e M a t e r i e l l Materiellsjef F/NLF kommuniserer pålegg omkring forhold som ansees som vesentlige for å oppnå de målsettinger som er satt for materiellarbeidet via denne Service
MAINTENANCE INSTRUCTION FOR RELEASE HOOK
Supplier: Document title: MAINTENANCE INSTRUCTION FOR RELEASE HOOK Supplier Doc. No.: M01-003 Number of page: 1 of 6 Rev. No.: 02 File name: J:\STANDARD\M01-003 P.O.No.: Client: Client Doc.no.: Tag no./type:
LUFTDYKTIGHETSP ABUD
MERK! For at angjeldende flymateriell skal være luftdyktig må påbudet være utført til rett tid og notat om utførelsen ført inn i vedkommende iournal med henvisniniz til denne LDPs nummer. Luftartstilsynet
JBV DSB godkjenninger
JBV DSB godkjenninger Leverandørmøte 2015-02-03 Willy Karlsen Sakkyndig driftsleder Electrical operation manager Eier av JBVs elektriske anlegg Alle jernbaneverkets elektriske anlegg er delt opp på de
HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment)
HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment) Revision: A3 Page: 2 of 5 ADVARSEL! Operatøren må lese og forstå HMS kapittelet
Certificates of Release to Service(CRS)
Certificates of Release to Service(CRS) Ørjan Bjørnstrøm CAA-N 28.Januar 2019 Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no Postadresse: Postboks 243 8001 BODØ Besøksadresse:
Safety a t t h e f A c t o r y
Safety a t t h e f A c t o r y Sikkerhet på fabrikken Safety at the factory NÅ har du god tid til å lese denne brosjyren! I en krisesituasjon har du ikke like god tid You have plenty of time to read this
KAMPANJE AKK : Skifte setetrekk forseter
KAMPANJE AKK-5 20160411: Skifte setetrekk forseter Berørte modeller: SX4 S-Cross AKK416 / AKK416D, totalt 220 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke om bilen er
Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014
Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014 Valter Kristiansen Flyteknisk Inspektør, Teknisk vedlikehold Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no
Justeringsanvisninger finnes på de to siste sidene.
d Montering av popup spredere Justeringsanvisninger finnes på de to siste sidene. Link til monteringsfilm på youtube: http://youtu.be/bjamctz_kx4 Hver spreder har montert på en "svinkobling", det vil si
Bestille trykk av doktoravhandling Ordering printing of PhD Thesis
Bestille trykk av doktoravhandling Ordering printing of PhD Thesis Brukermanual / User manual Skipnes Kommunikasjon ntnu.skipnes.no PhD Thesis NTNU LOG IN NOR: Gå inn på siden ntnu.skipnes-wtp.no, eller
Institutt for biovitenskap
Institutt for biovitenskap Oppslag for alle avtrekksskap: Alle avtrekksskap skal ha forklaring på alarmsystem på det enkelte skap. Dette varier fra skap til skap. e.g. på IBV finnes det minst 3 ulike typer.
Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42
Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Existing Relay-based Interlocking System Upgrades (NSI-63) Jostein Heimark Project Manager Signalling Innhold Introduksjon
TB-615 / TB-617 Wireless slim keyboard. EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning
TB-615 / TB-617 Wireless slim keyboard EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning EN User guide You have bought a wireless keyboard to use with Windows XP,
60-162-300. Monteringsanvisning Assembly Instructions Monteringsanvisning. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf: +47 35 94 65 65 www.sove.
UK Monteringsanvisning Assembly Instructions Monteringsanvisning Produkt nr. / Product no. / Produkt nr. 60-162-300 Ordr. nr. Dato. Sign. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf: +7 35 9 65 65 www.sove.no
SERVICE BULLETINE 2008-4
S e r v i c e b u l l e t i n e M a t e r i e l l Materiellsjef F/NLF kommuniserer påminnelse omkring forhold som ansees som vesentlige for å orientere om viktige materiellforhold. Målgruppen for Servicbulletinen
INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
Exercise 1: Phase Splitter DC Operation
Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your
Monitoring water sources.
Monitoring water sources. Generell Informasjon Versjon 2 Url http://com.mercell.com/permalink/38336681.aspx Ekstern anbuds ID 223314-2013 Konkurranse type: Tildeling Dokument type Kontraktstildeling Prosedyre
Elektronisk innlevering/electronic solution for submission:
VIKINGTIDSMUSEET Plan- og designkonkurranse/design competition Elektronisk innlevering/electronic solution for submission: Det benyttes en egen elektronisk løsning for innlevering (Byggeweb Anbud). Dette
Utøver går med feil lårnummer (og riktig startnummmer/brikke).
CASER Utøver går med feil lårnummer (og riktig startnummmer/brikke). - Arrangørfeil ingen konsekvens Utøver har ikke meldt seg på i rett tid og har reist med fly for å delta på Norges Cup. Hva skal TD
Monteringsanvisning. Assembly instructions. Ledsagerbrems / Drum brake. Artikkelnummer/ Item no.
Monteringsanvisning Assembly instructions Exigo 30 Emineo Ledsagerbrems / Drum brake Beskrivelse/Description 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 20 Pur 84419 22 Flexel/Compact 84437 22 Luft/Pneumatic
AC10. Brukermanual Brugsanvisning Bruksanvisning User Manual. Spenningsdetektor Voltage Detector. English Norsk
Spenningsdetektor Voltage Detector Brukermanual Brugsanvisning Bruksanvisning User Manual English Norsk ELIT AS - 2010 Innhold: 1. Generelle applikasjoner. 2. Beskrivelse av instrumentet. 3. Sikkerhetsinformasjon
Windows Server 2008 Hyper-V, Windows Server 2008 Server Core Installation Notes
Windows Server 2008 Hyper-V, Hyper-V Server 2008, and Windows Server 2008 Server Core Installation Notes Installing Dell UPS Management Software on a Hypervisor-Based Server Environment w w w. d e l l.
2. Sett pa ny laseplate og skru inn skruene. Merk at skruen under lasebolten er lenger enn de andre. Bruk Locktite 243 pa hver skrue.
ENDRE FUNKSJONER FOR ABLOY EL56, EL561 SKIFTE LASPLATE Fig. G 1. Skru ut lasskruene g fjern lasplaten. 2. Sett pa ny laseplate g skru inn skruene. Merk at skruen under laseblten er lenger enn de andre.
Instruksjons manual Instruction manual
knm Copyright c - 2011 knm Side. 1 BRUK AV UTSTYRET Utstyret er designet for løft, trekk, folding/bøying, kutting, støtteoperasjoner etc, og krever, med sitt høye operasjonstrykk og tunge arbeids last,
MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE
MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE Småvarereol R 3000 Shelving unit R 3000 ZERTIFIZIER T 1. Gavl / Upright frame 2. Hylle / Dividing shelf 3. Krysstag / Back braces 4. Gitter bakvegg /
17. desember 2015 kl.15.00 17 December 2015 at 15.00 (CET) 4. FORSLAG OM ENDRING AV VEDTEKTENE 5 4 PROPOSAL FOR CHANGE OF ARTICLES OF ASSOCIATIONS 5
OFFICE TRANSLATION INNKALLING TIL EKSTRAORDINÆR GENERALFORSAMLING Ekstraordinær generalforsamling i LINK Mobility Group ASA, org nr 984 066 910 holdes i: NOTICE OF EXTRAORDINARY GENERAL MEETING Extraordinary
Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis)
Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis) 1. Gå til print i dokumentet deres (Det anbefales å bruke InDesign til forberedning for print) 2. Velg deretter print
Quality audit of aircraft i Part-M og Part-145
Quality audit of aircraft i Part-M og Part-145 Sikorsky S-97 Raider, 2014 Vought-Sikorsky VS-300, 1939 Gunnar Kristiansen Flyteknisk Inspektør, Teknisk vedlikehold Luftfartstilsynet T: +47 75 58 50 00
Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland
Statens vegvesen Linetech GmbH & Co. KG Von-Hünefeld-Straße 99 50829 Köln Tyskland Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
Jan Krokeide Fagsjef boring - OLF. Kvalitetssikring av Brønn kontroll kompetanse
NFLB Høstkonferanse 22.oktober 2010 Samhandling på tvers av selskap og interesser kunder, leverandører, operatører hvordan kan vi gjøre hverandre bedre? Jan Krokeide Fagsjef boring - OLF Innhold: Bakgrunn
Trafikksikkerhet Traffic Safety Guidelines
Trafikksikkerhet Traffic Safety Guidelines Trafikksikkerhet og trafikkregulering Kongsberg Teknologipark Trafikksituasjonen i og rundt Kongsberg Teknologipark er vanskelig og vil forbli dette inntil ny
TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:
TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør
Quality Policy. HSE Policy
1 2 Quality Policy HSE Policy Astra North shall provide its customers highly motivated personnel with correct competence and good personal qualities to each specific assignment. Astra North believes a
Luftfartstilsynets funn under virksomhetstilsyn.
Luftfartstilsynets funn under virksomhetstilsyn. Inkludert funn ifm EASA standardiseringspeksjon av Luftfartstilsynet. Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no Postadresse:
KAMPANJE APK : APK-4: Kontroll montering EGT-2
KAMPANJE APK-4 20150722: APK-4: Kontroll montering EGT-2 Berørte modeller for APK-4: Vitara APK416D, totalt 58 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke om bilen er
Trigonometric Substitution
Trigonometric Substitution Alvin Lin Calculus II: August 06 - December 06 Trigonometric Substitution sin 4 (x) cos (x) dx When you have a product of sin and cos of different powers, you have three different
Company name: Åkrehamn Trålbøteri AS
S-025 03-02-025 Karmsund Maritime Offshore Supply AS Vendor Quality Assurance Questionnaire Company name: Åkrehamn Trålbøteri AS Tel: 52844560 Address: Øyavn 60 4296 Åkrehamn Fax:52844561 E-mail: terje@tral.no
bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly
bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly 1/ cone sleeve removal demontering av konhylse 2/ pin removal demontering av bolt 3/ additional Ø140mm - Ø195mm tillegg for
Elektronisk termostat med spareprogram. Lysende LCD display øverst på ovnen for enkel betjening.
Elektronisk termostat med spareprogram. Lysende LCD display øverst på ovnen for enkel betjening. 27.5 LCD Electronic thermostat with program setting. Bright LCD display placed at the top of the heater
Velkommen om bord i F/F Gunnerus. Welcome on board R/V Gunnerus. Introduksjon F/F Gunnerus
1 Velkommen om bord i F/F Gunnerus Welcome on board R/V Gunnerus 2 Forberedelse til tokt. Preparation for cruise. Helse miljø og sikkerhet ved NTNU. http://www.ntnu.no/adm/hms Health, safety and environmental
TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING
TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene
Endelig ikke-røyker for Kvinner! (Norwegian Edition)
Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Click here if your download doesn"t start automatically Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Endelig ikke-røyker
Vedlegg 2 Dokumentasjon fra TVM leverandør
(Step 7) Payment selection or date modification state This screen is displayed after validation of a date in the calendar screen. The customer can: - Modify again the date by pressing the Validity begin:
INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011)
INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) 1 Oppgaver Valgkomiteens oppgaver er å avgi innstilling til - generalforsamlingen
Bruksanvisning Modell I-440 Spesialutgave. for brukere med vekt opp til 200 kg
Bruksanvisning Modell I-440 Spesialutgave for brukere med vekt opp til 200 kg 1 2 Fjern beskyttelstrekk, og løft Evac+Chair fra veggen Plasser en fot på rammen nederst og løft opp håndtak 3 4 Håndtak har
EcoNordic. Flexit GO ART.NR , MONTERINGSVEILEDNING Spjeld. MONTERINGANVISNING Spjäll
117020-01 2018-11 EcoNordic Flexit GO ART.NR. 116992, 116993 MONTERINGSVEILEDNING Spjeld MONTERINGANVISNING Spjäll INSTALLATION INSTRUCTIONS Damper ECONORDIC Viktige sikkerhetsinstruksjoner:! FARE! Alle
25 Monate Garantiebedingungen 25 mois conditions de garantie 25 months warranty conditions
Wireless Transmitter de Bedienungsanleitung en Instructions for use fr Mode d emploi it Istruzioni per l uso nl Gebruiksaanwijzing es Modo de empleo pt Manual de instruções sv Bruksanvisning no Instruksjonsbok
STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD
FORSLAG FRA SEF TIL NY STILLAS - STANDARD 1 Bakgrunnen for dette initiativet fra SEF, er ønsket om å gjøre arbeid i høyden tryggere / sikrere. Både for stillasmontører og brukere av stillaser. 2 Reviderte
LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014
1 LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014 REGLEMENT FOR BRUK AV KALKULATOR OG ORDBOK SE SISTE SIDE 1. STUDIEÅR (ØKAD/REV): Finansregnskap m/ikt (ØABED1000) Markedsføring og
KAMPANJE AZG : Skifte bolter reimhjul
KAMPANJE AZG-4 20141009: Skifte bolter reimhjul Berørte modeller: Swift AZG type 3 (produsert i Ungarn) fra 2013 og nyere. (Type 3: Biler med automatisk kjørelys og navigasjon). Kampanjen omfatter totalt
#89853 Command Center
1 #89853 Command Center Portable AV Center Assembly Instructions #89853 Command Center Portable AV Center Part rawing escription Qty Part rawing escription Qty Hardware List A Socket Screw M6X9mm 16 A
NÅR FAGKUNNSKAP & KOMPETANSE TELLER BRUKERMANUAL ELIT AC10 SPENNINGSDETEKTOR USER MANUAL ELIT AC10 VOLTAGE DETECTOR. English Norsk
NÅR FAGKUNNSKAP & KOMPETANSE TELLER BRUKERMANUAL ELIT AC10 SPENNINGSDETEKTOR USER MANUAL ELIT AC10 VOLTAGE DETECTOR English Norsk WWW.ELIT.NO Innhold: NORSK 1. Generelle applikasjoner. 2. Beskrivelse av
Tema Fusion Monteringsanvisning
Monteringsanvisning Assembly instruction N-6230 SYKKYLVEN - NORWAY TLF. 70 25 59 00 - TELEFAX. 70 25 59 01 E-POST: post@tema.no Målsetting Dimensions Monter fast skrogene på veggen før du monterer skuffer,
Roma Garden Art.no: FP-ROMGR-100 Last updated: 12.07.13
NOMonteringsanvisning 2 GB Assembly instructions 3 Roma Garden Art.no: FP-ROMGR-100 Last updated: 12.07.13 Roma Garden Vekt Krav til gulvplate 352 kg 670 mm Ta kontakt med en faghandler om du trenger tips
INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS)
INFO TAXI REMOTE Taxi Management CONTROL SYSTEM (TMCS) November 2015 taxi remote taxi remote I Taxi Management Control System registreres taxier med en transponderbrikke festet til frontruten. Brikken
Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler
UNIVERSITETET I OSLO INF1300 Introduksjon til databaser Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler Institutt for informatikk Dumitru Roman 1 Eksempel (1) 1. The system shall give an overview
Innholdsfortegnelse... 1 Endringslogg UD BETALINGSTERMINAL NETS NEW DRIVERS FULL SUPPORT WINDOWS
ENDRINGSLOGG INNHOLDSFORTEGNELSE Innholdsfortegnelse... 1 Endringslogg 2017.151.1... 3 UD-17.136 BETALINGSTERMINAL NETS NEW DRIVERS FULL SUPPORT WINDOWS 10... 3 UD-17.137 UTESTÅENDE NOT SHOWIN CROSSED
Rolls-Royce Deck Machinery
Rolls-Royce Deck Machinery - 40 years as Market Leader in Anchor Handling Gisle Anderssen 2005 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied
Purus Line Vinyl Plus
Norsk Sikre at bransjereglene blir fulgt Vi anbefaler å få installasjonen utført av en autorisert rørlegger. Du finner mer informasjon i bransjereglene. Våtromsnormen, www.byggforsk.no/vaatromsnormen Montering
PIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER
SLUTTRAPPORT Innhold 1. Innledning 1.1 Deltakere 1.2 Bakgrunn 1.3 Mål 1.4 Organisasjon 2. Oppsummering 3. Summary in English 4. Referanser/References 1. INNLEDNING 1.1 Deltakere Alcan á Ísland Alcoa Fjarðaál
Monteringsprosedyre for Soundstop - lydmatte
NORSOK STANDARD PIPING AND EQUIPMENT INSULATION R-004 5.7 Guidelines for acoustic insulation The acoustic pipe insulation classes can be met by various combinations of insulation materials and jacketing
CE-merking av veibyggingsmaterialer og veitrafikkutstyr. MATHIEU VEULEMANS 23.09.2015 Teknologidagene 2015 (Statens Vegvesen), Trondheim
1 CE-merking av veibyggingsmaterialer og veitrafikkutstyr MATHIEU VEULEMANS 23.09.2015 Teknologidagene 2015 (Statens Vegvesen), Trondheim Innledning Veibyggingsmaterialer og veitrafikkutstyr er byggevarer
TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING
E-postmaler til bruk ved utsendelse av fremdriftsrapportering ph.d.- kandidater og veiledere TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: Kjære
Software applications developed for the maritime service at the Danish Meteorological Institute
Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological
HONSEL process monitoring
6 DMSD has stood for process monitoring in fastening technology for more than 25 years. HONSEL re- rivet processing back in 990. DMSD 2G has been continuously improved and optimised since this time. All