SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules
|
|
- Sivert Sletten
- 8 år siden
- Visninger:
Transkript
1 SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules Installation instructions Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS BJGU/GUSO Checked NODIS MARE Approved NODIS OLGR Title SAFERING / SAFEPLUS RETROFIT OF AUXILIARY SWITCH S7 & S10 C, F AND SI MODULES Language EN/NO 1/12
2 General Safety Instructions! - Check that the installation, putting into service and maintenance of this apparatus is carried out by qualified personnel with knowledge of the apparatus to be installed. All the procedures as laid out in this installation and service instruction manual must be known. - To perform the following installation requires a vocational training (electrician, electrical engineer) and some years of experience. - Make sure the standard and legal prescriptions are adhered to during the installation, putting into service and maintenance. All procedures must be carried out in strict compliance to the rules of good working practice and safety at the work site. - Please read this instruction manual and plan the work before starting the installation. - Strictly follow the information given in this instruction manual. - Pay special attention to the danger notes as indicated in this manual by the following symbol: - Check and ensure that the personnel operating the apparatus have the instruction manual at hand, as well as the necessary information for correct installation. - Before starting the retrofit upgrade the switchgear must be deenergized. Please de-energize the switchgear by operating the switches to disconnected position. - Check that all mechanism springs are discharged. If in doubt, close and open the switch. 2/12
3 Sikkerhetsinstruks! - Sørg for at installasjon, idriftsettelse og vedlikehold er utført av kvalifisert personell som har kjennskap til utstyret som blir installert. Vedkommende må også kjenne til prosedyrer som er beskrevet i dette installasjonsheftet. - For å utføre følgende installasjon kreves yrkesfaglig erfaring som elektriker, elektroingeniør eller liknende. - Sørg for at sikkerheten rundt installasjonsarbeidet er ivaretatt i henhold til nasjonale normer og forskrifter. Arbeidet utføres av en fagperson. - Les manualen nøye før arbeidet påbegynnes. - Utfør installasjonen nøyaktig som beskrevet i denne manualen. - Vær spesielt nøye med å lese og følge anvisninger når det er indikert med fare symbolet: - Sørg for at betjeningspersonell har dette installasjonsheftet og har fått nødvendig informasjon når de betjener det installerte utstyret. - Før installasjonen påbegynnes, sørg for at avgangen det skal jobbes på er strømløs og at bryterne er utkoblet. - Alle fjærer på mekanismene må være avspent. For å forsikre seg om dette kan bryteren lukkes og åpnes. 3/12
4 Installation procedure The pictures and drawings are for a C module, but this document is also valid for F and Sl modules Bilder og tegninger er av C-felt, men dette dokumentet er også gyldig for F- og Sl-felt 1 Used until May 2007 Brukt inntil mai 2007 Eksisting front covers Dagens frontdeksler 1. Unscrew the fixing screw and remove the upper and lower front covers Løsne festeskruen og fjern øvre og nedre frontdeksel 4/12
5 2 * 2. Unscrew the bracket for capacitive voltage indication Skru av braketten for kapasitiv spenningsindikering *Depending on SafeRing / SafePlus production year, the position indicator may be different compared to the drawing above. Please refer to Appendix A, if your position indicator is different. *Avhengig av når SafeRing / SafePlus anlegget er produsert, kan stillingsindikeringen være forskjellig fra tegningen over. Hvis dette er tilfelle, vennligst se Appendix A for eldre stillingsindikatorer. 5/12
6 3 3. Snap on protection on the edges of the mechanism to avoid damage of wires Monter kantbeskyttelse på mekanismen for å unngå skade på ledninger 4. Fix the bracket for the terminals marked X1 to the mechanism with 2 pieces of M6x10 screws Fest braketten med rekkeklemmene merket X1 til mekanismen med 2 stk M6x10 skruer 6/12
7 X1 M 4 x 10 S10 5 S7 5. Pull the position indicator maximum 2 mm out and fit the auxiliary switch marked S7 and S10 behind the camshaft Fix the auxiliary switch with 2 pieces of M4x10 screws Dra ut stillingsindikatoren maksimalt 2 mm og vipp signalvenderen merket S7 og S10 bak kamakselen Monter signalvenderen med 2 stk M4x10 skruer IMPORTANT! Fix the wires to avoid any damages from moving parts VIKTIG! Fest alle ledninger slik at skader fra bevegelige deler unngås 7/12
8 6. Fix the bracket for capacitive voltage indicator, which was removed during step 2 Fest braketten for kapasitiv spenningsindikator som ble fjernet under punkt 2 7. Re-place and fix the front covers Sett tilbake og fest frontdekslene 8/12
9 APPENDIX A 3 Used until December 2002 Brukt inntil desember 2002 Used until May 2007 Brukt inntil mai Unscrew and remove the position indicator Skru av stillingsindikatoren 4 4. Snap on protection on the edges of the mechanism to avoid damage of wires Monter kantbeskyttelse på mekanismen for å unngå skade på ledninger 9/12
10 5 X1 M6 x Fix the bracket for terminals marked X1 to the mechanism with 2 pieces of M6x10 screws Fest braketten med rekkeklemmene merket X1 til mekanismen med 2 stk M6x10 skruer 10/12
11 X1 6 M4 x 10 S10 S7 6. Fix the auxiliary switch marked S7 and S10 with 2 pieces of M4x10 screws Fest signalvenderen merket S7 og S10 med 2 stk M4x10 skruer IMPORTANT! Fix the wires to avoid any damages from moving parts VIKTIG! Fest alle ledninger slik at skader fra bevegelige deler unngås 11/12
12 X1 X1 S10 S7 8 S10 S Cog wheel arrow shall point to the straight line Pilen i tannhjulet skal peke mot den rette linjen 7. Fix the bracket for capacitive voltage indicator, which was removed during step 2 Fest braketten for kapasitiv spenningsindikator som ble fjernet under punkt 2 8. Fix the position indicator, which was removed during step 3 Fest stillingsindikeringen som ble fjernet under punkt 3 9. Re-place and fix the front covers Sett tilbake og fest frontdekslene 12/12
SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module
SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules
Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared
SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism
SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location
SafeRing / SafePlus Retrofit of under voltage coil V Module
SafeRing / SafePlus Retrofit of under voltage coil V Module Installation Instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO Checked
Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules
Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name
SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock type EL11AP C, De, F and Sl modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock
SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module
SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO
Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules
Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name
SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module
SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO Checked
SafeRing / SafePlus Retrofit capacitive voltage indication type VDS C, F, De and V Modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties without SafeRing / SafePlus Retrofit capacitive voltage indication type
SafeRing / SafePlus Retrofit of capacitive voltage indication type VPIS C, De, F and V Modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties without SafeRing / SafePlus Retrofit of capacitive voltage indication type
REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION
2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm
Start Here USB *CC * *CC * USB USB
1 USB Start Here USB 11 USB WARNING: To ensure that the software is installed correctly, do not connect the USB cable until step 11. 11 USB 2 a. b. Lower both the paper tray and the print cartridge door.
KAMPANJE APK : APK-5: Skifte pakninger mellom turbo og CCDPF
KAMPANJE APK-5 20150722: APK-5: Skifte pakninger mellom turbo og CCDPF Berørte modeller for APK-5: Vitara APK416D, totalt 66 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke
Replacing the batteries
ASSEMBLY INSTRUCTION Replacing the batteries EN NO 9010189A 5.2.14 9010189 Replacing the batteries Preparation Switch off the wheelchair via the remote control. Remove the fuses from the battery compartment
MONTASJEBESKRIVELSE INSTALLATION GUIDE
MONTASJEBESKRIVELSE INSTALLATION GUIDE ADVARSEL WARNINGS Dette armaturet er et Klasse II produkt som IKKE SKAL TILKOBLES JORD. This device is a class II product: DO NOT CONNECT THE LAMP and the pole to
Windlass Control Panel
SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e
KAMPANJE APK : APK-8: Bytte bakaksel bolter
KAMPANJE APK-8 20160222: APK-8: Bytte bakaksel bolter Berørte modeller for APK-8: Vitara APK, S-cross AKK, og Swift AZG. Totalt 454 biler på det norske markedet. Liste med chassisnummer legges ikke ved,
Mounting the electrically elevating legrest
ASSEMBLY INSTRUCTION Mounting the electrically elevating legrest EN NO 9000A ..8 9000 Mounting the electrically elevating legrest Preparation Note! Switch off the wheelchair via remote control. Instructions
Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite
Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite Art.nr. 05-900-573-00. Page 1 of 9 Norsk Monteringsanvisning taksokkel Denne monteringsmanualen
Replacing the tube and/or tyre of a drive wheel, indoor/outdoor
ASSEMBLY INSTRUCTION Replacing the tube and/or tyre of a drive wheel, indoor/outdoor EN NO 9010182A 5.2.7 9010182 Replacing the tube and/or tyre of a drive wheel, indoor/outdoor Preparation Be sure that
IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM!
GB IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! NOR VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM! Produktmål, materiale: 135x77x72 cm Furu Proper use This
Safety a t t h e f A c t o r y
Safety a t t h e f A c t o r y Sikkerhet på fabrikken Safety at the factory NÅ har du god tid til å lese denne brosjyren! I en krisesituasjon har du ikke like god tid You have plenty of time to read this
Replacing the carbon brushes
ASSEMBLY INSTRUCTION Replacing the carbon brushes EN NO 9010180A 5.2.4 9010180 Replacing the carbon brushes (Puma 20/40) Preparation Switch off the wheelchair via the remote control. Be sure that the
Montering av Lian Skyvedør Installation of Lian Sliding Door
Montering av Lian Skyvedør Installation of Lian Sliding Door Les dette før du starter monteringen! Read these instructions carefully before installation. Sjekk nøye at produktet stemmer med bestilling
Monteringsanvisning. Assembly instructions. Ledsagerbrems / Drum brake. Artikkelnummer/ Item no.
Monteringsanvisning Assembly instructions Exigo 30 Emineo Ledsagerbrems / Drum brake Beskrivelse/Description 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 20 Pur 84419 22 Flexel/Compact 84437 22 Luft/Pneumatic
The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.
1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers
Tema Fusion Monteringsanvisning
Monteringsanvisning Assembly instruction N-6230 SYKKYLVEN - NORWAY TLF. 70 25 59 00 - TELEFAX. 70 25 59 01 E-POST: post@tema.no Målsetting Dimensions Monter fast skrogene på veggen før du monterer skuffer,
Handicare Emineo Ledsagerbrems Basic / Drum brake Basic
Monteringsanvisning Assembly instructions Handicare Emineo Ledsagerbrems Basic / Drum brake Basic Beskrivelse/Description Art. nr / Item no. 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 22 Flexel/Compact
MAINTENANCE INSTRUCTION FOR RELEASE HOOK
Supplier: Document title: MAINTENANCE INSTRUCTION FOR RELEASE HOOK Supplier Doc. No.: M01-003 Number of page: 1 of 6 Rev. No.: 02 File name: J:\STANDARD\M01-003 P.O.No.: Client: Client Doc.no.: Tag no./type:
Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter 01.01.2015.
S e r v i c e o r d r e M a t e r i e l l Materiellsjef F/NLF kommuniserer pålegg omkring forhold som ansees som vesentlige for å oppnå de målsettinger som er satt for materiellarbeidet via denne Service
Justeringsanvisninger finnes på de to siste sidene.
d Montering av popup spredere Justeringsanvisninger finnes på de to siste sidene. Link til monteringsfilm på youtube: http://youtu.be/bjamctz_kx4 Hver spreder har montert på en "svinkobling", det vil si
Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions
Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Vigdis Bjørlo 2016-02-05 Suppliers' obligations in relation to the Construction Client Regulations
Certificates of Release to Service(CRS)
Certificates of Release to Service(CRS) Ørjan Bjørnstrøm CAA-N 28.Januar 2019 Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no Postadresse: Postboks 243 8001 BODØ Besøksadresse:
Independent Inspection
Independent Inspection Odd Ivar Johnsen Vidar Nystad Independent Inspection Mål: Felles forståelse og utøvelse av "Independent Inspection" i forbindelse med "Critical Maintenance Task". Independent Inspection
KROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal.
KROPPEN LEDER STRØM Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal. Hva forteller dette signalet? Gå flere sammen. Ta hverandre i hendene, og la de to ytterste personene
Du vil trenge: Umbraco Nøkkel (Inkludert); Skiftnøkkel/Fastnøkkel sett (For styrestem bolten og de 4 styreboltene),pumpe
Pawtrekker DOG SCOOTERS / SPARKSYKKEL Monteringsanvisning Du vil trenge: Umbraco Nøkkel (Inkludert); Skiftnøkkel/Fastnøkkel sett (For styrestem bolten og de 4 styreboltene),pumpe Vi anbefaler å montere
JBV DSB godkjenninger
JBV DSB godkjenninger Leverandørmøte 2015-02-03 Willy Karlsen Sakkyndig driftsleder Electrical operation manager Eier av JBVs elektriske anlegg Alle jernbaneverkets elektriske anlegg er delt opp på de
bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly
bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly 1/ cone sleeve removal demontering av konhylse 2/ pin removal demontering av bolt 3/ additional Ø140mm - Ø195mm tillegg for
HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment)
HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment) Revision: A3 Page: 2 of 5 ADVARSEL! Operatøren må lese og forstå HMS kapittelet
Bruksanvisning Modell I-440 Spesialutgave. for brukere med vekt opp til 200 kg
Bruksanvisning Modell I-440 Spesialutgave for brukere med vekt opp til 200 kg 1 2 Fjern beskyttelstrekk, og løft Evac+Chair fra veggen Plasser en fot på rammen nederst og løft opp håndtak 3 4 Håndtak har
2. Sett pa ny laseplate og skru inn skruene. Merk at skruen under lasebolten er lenger enn de andre. Bruk Locktite 243 pa hver skrue.
ENDRE FUNKSJONER FOR ABLOY EL56, EL561 SKIFTE LASPLATE Fig. G 1. Skru ut lasskruene g fjern lasplaten. 2. Sett pa ny laseplate g skru inn skruene. Merk at skruen under laseblten er lenger enn de andre.
Monitoring water sources.
Monitoring water sources. Generell Informasjon Versjon 2 Url http://com.mercell.com/permalink/38336681.aspx Ekstern anbuds ID 223314-2013 Konkurranse type: Tildeling Dokument type Kontraktstildeling Prosedyre
Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3
Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL
SERVICE BULLETINE 2008-4
S e r v i c e b u l l e t i n e M a t e r i e l l Materiellsjef F/NLF kommuniserer påminnelse omkring forhold som ansees som vesentlige for å orientere om viktige materiellforhold. Målgruppen for Servicbulletinen
PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016
1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER
Trigonometric Substitution
Trigonometric Substitution Alvin Lin Calculus II: August 06 - December 06 Trigonometric Substitution sin 4 (x) cos (x) dx When you have a product of sin and cos of different powers, you have three different
AC10. Brukermanual Brugsanvisning Bruksanvisning User Manual. Spenningsdetektor Voltage Detector. English Norsk
Spenningsdetektor Voltage Detector Brukermanual Brugsanvisning Bruksanvisning User Manual English Norsk ELIT AS - 2010 Innhold: 1. Generelle applikasjoner. 2. Beskrivelse av instrumentet. 3. Sikkerhetsinformasjon
bondura dual 36 Ø50mm - Ø200mm assembly & inspection manual art rev A
bondura dual 36 Ø50mm - Ø200mm assembly & inspection manual art. 103803 rev. 27.04.2016 A TABLE OF CONTENT / INNHOLD 1/ assembly montering 2/ technical specifications/torque tekniske data/tiltrekkingsmoment
Monteringsprosedyre for Soundstop - lydmatte
NORSOK STANDARD PIPING AND EQUIPMENT INSULATION R-004 5.7 Guidelines for acoustic insulation The acoustic pipe insulation classes can be met by various combinations of insulation materials and jacketing
MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE
MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE Småvarereol R 3000 Shelving unit R 3000 ZERTIFIZIER T 1. Gavl / Upright frame 2. Hylle / Dividing shelf 3. Krysstag / Back braces 4. Gitter bakvegg /
- Vennlig hilsen gründerne bak retyre
Etter to år med utvikling og testing er retyre endelig klar for å møte den norske vinteren. Det begynte med en idé om en enkel sykkelkjetting, og endte opp med verdens første modulære sykkeldekk. Vi håper
60-162-300. Monteringsanvisning Assembly Instructions Monteringsanvisning. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf: +47 35 94 65 65 www.sove.
UK Monteringsanvisning Assembly Instructions Monteringsanvisning Produkt nr. / Product no. / Produkt nr. 60-162-300 Ordr. nr. Dato. Sign. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf: +7 35 9 65 65 www.sove.no
Exercise 1: Phase Splitter DC Operation
Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your
Velkommen om bord i F/F Gunnerus. Welcome on board R/V Gunnerus. Introduksjon F/F Gunnerus
1 Velkommen om bord i F/F Gunnerus Welcome on board R/V Gunnerus 2 Forberedelse til tokt. Preparation for cruise. Helse miljø og sikkerhet ved NTNU. http://www.ntnu.no/adm/hms Health, safety and environmental
Purus Line Vinyl Plus
Norsk Sikre at bransjereglene blir fulgt Vi anbefaler å få installasjonen utført av en autorisert rørlegger. Du finner mer informasjon i bransjereglene. Våtromsnormen, www.byggforsk.no/vaatromsnormen Montering
NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015
1 PETROLEUM PRICE BO ARD Our reference Date OED 15/712 15/06/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL
KAMPANJE AKK : Skifte setetrekk forseter
KAMPANJE AKK-5 20160411: Skifte setetrekk forseter Berørte modeller: SX4 S-Cross AKK416 / AKK416D, totalt 220 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke om bilen er
Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42
Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Existing Relay-based Interlocking System Upgrades (NSI-63) Jostein Heimark Project Manager Signalling Innhold Introduksjon
Bestille trykk av doktoravhandling Ordering printing of PhD Thesis
Bestille trykk av doktoravhandling Ordering printing of PhD Thesis Brukermanual / User manual Skipnes Kommunikasjon ntnu.skipnes.no PhD Thesis NTNU LOG IN NOR: Gå inn på siden ntnu.skipnes-wtp.no, eller
INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland
Statens vegvesen Linetech GmbH & Co. KG Von-Hünefeld-Straße 99 50829 Köln Tyskland Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
Elektronisk innlevering/electronic solution for submission:
VIKINGTIDSMUSEET Plan- og designkonkurranse/design competition Elektronisk innlevering/electronic solution for submission: Det benyttes en egen elektronisk løsning for innlevering (Byggeweb Anbud). Dette
Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014
Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014 Valter Kristiansen Flyteknisk Inspektør, Teknisk vedlikehold Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no
229 SONATA Manual NO_ENG 1.04
-SONATA 2 SONATA SONATA Informasjon og sikkerhet ADVARSEL -Bruk bare strømforsyning som er godkjent av COMMidt, for bruk sammen med denne enheten. Bruk av andre typer kan oppheve all godkjenning og garanti,
NÅR FAGKUNNSKAP & KOMPETANSE TELLER BRUKERMANUAL ELIT AC10 SPENNINGSDETEKTOR USER MANUAL ELIT AC10 VOLTAGE DETECTOR. English Norsk
NÅR FAGKUNNSKAP & KOMPETANSE TELLER BRUKERMANUAL ELIT AC10 SPENNINGSDETEKTOR USER MANUAL ELIT AC10 VOLTAGE DETECTOR English Norsk WWW.ELIT.NO Innhold: NORSK 1. Generelle applikasjoner. 2. Beskrivelse av
INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
Skjema for spørsmål og svar angående: Skuddbeskyttende skjold Saksnr TED: 2014/S
Skjema for spørsmål og svar angående: Skuddbeskyttende skjold Saksnr. 201300129 TED: 2014/S 017-026835 Nr Dokument Referanse Svar 1 Kvalifikasjonsgrunnlag Er det mulig å få tilsendt Nei 27.01.2014 27.01.2014
Institutt for biovitenskap
Institutt for biovitenskap Oppslag for alle avtrekksskap: Alle avtrekksskap skal ha forklaring på alarmsystem på det enkelte skap. Dette varier fra skap til skap. e.g. på IBV finnes det minst 3 ulike typer.
Innholdsfortegnelse... 1 Endringslogg UD BETALINGSTERMINAL NETS NEW DRIVERS FULL SUPPORT WINDOWS
ENDRINGSLOGG INNHOLDSFORTEGNELSE Innholdsfortegnelse... 1 Endringslogg 2017.151.1... 3 UD-17.136 BETALINGSTERMINAL NETS NEW DRIVERS FULL SUPPORT WINDOWS 10... 3 UD-17.137 UTESTÅENDE NOT SHOWIN CROSSED
Nedfellbar koketopp Brukermanual. Importør: Sunwind Gylling AS postboks 64, 1309 RUD
NO Nedfellbar koketopp Brukermanual Importør: Sunwind Gylling AS postboks 4, 1309 RUD Kjære kunde Takk for ditt kjøp av denne koketoppen som er testet grundig i ulike kvalitetskontroller og er produsert
PETROLEUM PRICE BOARD
1 PETROLEUM PRICE BOARD Our reference Date OED 15/712 21/09/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL
OTC USE IN NORWAY FOR PARACETAMOL, ATC-CODE: N02BE01
OTC USE IN NORWAY FOR PARACETAMOL, ATC-CODE: N02BE01 To gain OTC prescription status for a medicinal product an application in accordance with A guideline on changing the classification for the supply
6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012
6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012 100 200 3000 0 0 0 13 38 63 88 113 138 163 4000 188 213 238 263 288 313 338 363 378 386 5000 394 402 410 417
LUFTDYKTIGHETSP ABUD
MERK! For at angjeldende flymateriell skal være luftdyktig må påbudet være utført til rett tid og notat om utførelsen ført inn i vedkommende iournal med henvisniniz til denne LDPs nummer. Luftartstilsynet
TB-615 / TB-617 Wireless slim keyboard. EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning
TB-615 / TB-617 Wireless slim keyboard EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning EN User guide You have bought a wireless keyboard to use with Windows XP,
RF Power Capacitors Class kV Discs with Moisture Protection
RF Power Capacitors Class 0-20kV Discs with Moisture Protection T H E C E R A M I C E X P E R T S RF Power Capacitors Class 0-20kV Discs with Moisture Protection The CeramTec Group is a world leader in
Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis)
Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis) 1. Gå til print i dokumentet deres (Det anbefales å bruke InDesign til forberedning for print) 2. Velg deretter print
Utøver går med feil lårnummer (og riktig startnummmer/brikke).
CASER Utøver går med feil lårnummer (og riktig startnummmer/brikke). - Arrangørfeil ingen konsekvens Utøver har ikke meldt seg på i rett tid og har reist med fly for å delta på Norges Cup. Hva skal TD
EMS 1. Music Streamer. Owner's Manual
EMS 1 Music Streamer Owner's Manual EN N 2 ENG About the EMS 1 Electrocompaniet Music Streamer This unit is designed to work with the Electrocompaniet PD 1 DAC only. A radio link is established between
Endringer i neste revisjon av EHF / Changes in the next revision of EHF 1. October 2015
Endringer i neste revisjon av / Changes in the next revision of 1. October 2015 INFORMASJON PÅ NORSK 2 INTRODUKSJON 2 ENDRINGER FOR KATALOG 1.0.3 OG PAKKSEDDEL 1.0.2 3 ENDRINGER FOR ORDRE 1.0.3 4 ENDRINGER
Quality audit of aircraft i Part-M og Part-145
Quality audit of aircraft i Part-M og Part-145 Sikorsky S-97 Raider, 2014 Vought-Sikorsky VS-300, 1939 Gunnar Kristiansen Flyteknisk Inspektør, Teknisk vedlikehold Luftfartstilsynet T: +47 75 58 50 00
Endelig ikke-røyker for Kvinner! (Norwegian Edition)
Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Click here if your download doesn"t start automatically Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Endelig ikke-røyker
Windows Server 2008 Hyper-V, Windows Server 2008 Server Core Installation Notes
Windows Server 2008 Hyper-V, Hyper-V Server 2008, and Windows Server 2008 Server Core Installation Notes Installing Dell UPS Management Software on a Hypervisor-Based Server Environment w w w. d e l l.
STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD
FORSLAG FRA SEF TIL NY STILLAS - STANDARD 1 Bakgrunnen for dette initiativet fra SEF, er ønsket om å gjøre arbeid i høyden tryggere / sikrere. Både for stillasmontører og brukere av stillaser. 2 Reviderte
Kartleggingsskjema / Survey
Kartleggingsskjema / Survey 1. Informasjon om opphold i Norge / Information on resident permit in Norway Hvilken oppholdstillatelse har du i Norge? / What residence permit do you have in Norway? YES No
Roma Garden Art.no: FP-ROMGR-100 Last updated: 12.07.13
NOMonteringsanvisning 2 GB Assembly instructions 3 Roma Garden Art.no: FP-ROMGR-100 Last updated: 12.07.13 Roma Garden Vekt Krav til gulvplate 352 kg 670 mm Ta kontakt med en faghandler om du trenger tips
Slope-Intercept Formula
LESSON 7 Slope Intercept Formula LESSON 7 Slope-Intercept Formula Here are two new words that describe lines slope and intercept. The slope is given by m (a mountain has slope and starts with m), and intercept
1 BANESTRØMFORSYNING TOGVARMEANLEGG KONTAKTLEDNINGSANLEGG... 5
Infrastruktur Elkraft / Energy Side / Page: 1 av/of 5 1 BANESTRØMFORSYNING... 3 2 TOGVARMEANLEGG...4 3 KONTAKTLEDNINGSANLEGG... 5 Infrastruktur Elkraft / Energy Side / Page: 2 av/of 5 1... 3 TRACTION POWER
Instruksjons manual Instruction manual
knm Copyright c - 2011 knm Side. 1 BRUK AV UTSTYRET Utstyret er designet for løft, trekk, folding/bøying, kutting, støtteoperasjoner etc, og krever, med sitt høye operasjonstrykk og tunge arbeids last,
RF Power Capacitors Class , 20 & 30 mm Barrel Transmitting Types
RF Power Capacitors Class 2.7, 20 & 30 mm Barrel Transmitting Types T H E C E R A M I C E X P E R T S RF Power Capacitors Class 2.7, 20 & 30 mm Barrel Transmitting Types The CeramTec Group is a world leader
Vedlegg 2 Dokumentasjon fra TVM leverandør
(Step 7) Payment selection or date modification state This screen is displayed after validation of a date in the calendar screen. The customer can: - Modify again the date by pressing the Validity begin:
Data Sheet for Joysticks
Available with Potentiometers or Hall sensors Several handle options Small size at low installation depth The 812 series is available with several different handle options. These small joysticks are recommended
OtisMed Imaging Technique: Graphix for Knee MRI PHILIPS, SIEMENS, & TOSHIBA GRAPHIX MRI SCANNERS
OtisMed Imaging Technique: PHILIPS, SIEMENS, & TOSHIBA GRAPHIX MRI SCANNERS Positioning for Posterior Alignment Use your box shaped graphix. Follow the steps below for proper placement of slices. See Figures
SEMA 203. Rescue Sling Rednings slynge EN 1498 PERSONAL PROTECTION EQUIPMENT (PPE) AGAINST FALLS FROM A HEIGHT 3 INSTRUCTIONS FOR USE AND MAINTENANCE
SEMA 203 Rescue Sling Rednings slynge EN 1498 EN PERSONAL PROTECTION EQUIPMENT (PPE) AGAINST FALLS FROM A HEIGHT 3 INSTRUCTIONS FOR USE AND MAINTENANCE NO PERSONLIG VERNEUTSTYR (PVU) MOT HØYE FALL 10 BRUKS-
Eksamen KVT2002 Elenergi og automatiseringssystem/systemer. Programområde: Kulde- og varmepumpeteknikk. Nynorsk/Bokmål
Eksamen 01.06.2016 KVT2002 Elenergi og automatiseringssystem/systemer Programområde: Kulde- og varmepumpeteknikk Nynorsk/Bokmål Nynorsk Eksamensinformasjon Eksamenstid Hjelpemiddel Eksamen varer i 4 timar.
Data Sheet for Joysticks
Available with Potentiometers or Hall sensors Several handle options Small size at low installation depth The 812 series is available with several different handle options. These small joysticks are recommended