1
10/10/2017
Nøkkeltall for HSN 18.000 8
Ny organisering:
Teknologi, naturvitenskap og maritime fag O C O H N H R
PhD Programmes at HSN // Applied Micro and Nano systems // Cultural studies // Ecology // Marketing Management // Person-centred Health Care // Process, Energy and Automation Engineering // Research training in pedagogical resources and learning processes // Nautiske operasjoner
New faculty: Faculty of technology, natural sciences and maritime sciences
Bachelorstudier: Kongsberg: Dataingeniør Elektroingeniør Produktutvikling - Maskiningeniør Porsgrunn: Byggdesign Elkraftteknikk Ren energi og prosessteknologi Informatikk og automatisering Maskinteknisk design Plan og infrastruktur Vestfold: Bø Datateknikk Maritim elektro-automasjon Mikro- og nanosystemteknologi Produktdesign Marinteknisk drift maskinist Nautikk Skipsfart og logistikk Natur, miljø og friluftsliv Natur og miljø Årsstudier Natur og miljø, Naturfag mm
Masterstudier: Kongsberg: Systems Engineering Systems Engineering med Industriell Økonomi Systems Engineering with Embedded Systems Lektorutdanning i realfag (ikke startet) Porsgrunn: Electrical Power Engineering Energy and Environmental Technology Industrial IT and Automation Process Technology Vestfold: Mikro- og nanosystemteknologi Smart Systems Integration (joint) Maritime management Bø Akvatisk økologi (under avvikling) Alpine Ecology (ikke-opptak) Environmental science Natur-, helse- og miljøvern
Trippel Hellix: Næringsliv, HSN og Offentlige myndigheter Telemark offshore, Water valley, SFI, FME, Status Illustrasjon, NTNU VRI-satsing Nett- og industrimaster FOUI-eksperter 10.10.2017 Gaveprofessorater
Eksempler
10/10/2017 EET3210 Energy Technology - Week 34 12
Norwegian Centre for Sustainable Bio-based Fuels and Energy bio4fuels@nmbu.no
PhD Thesis Process, Energy and Automation Engineering 2014 2018 Improved functionality of power systems using Model Predictive Control By: Thomas Øyvang Your picture Supervisor: Bernt Lie Co-supervisor: Gunne Hegglid Background and Objectives The Norwegian Network Code FIKS from the Norwegian Transmission System Operator (TSO) Statnett, states that synchronous generators 1 MVA must connect to the grid with a cosφ 0.85 capacitive and 0.95 inductive. Reactive power can be used to compensate for voltage drops in a power system, but must be provided closer to the demands than real power needs due to transportation limitations of reactive power through the grid. Flexible power factor control on large synchronous generators located close to points of high demand could enhance the voltage stability of a power system. Model Predictive Control for voltage control through field excitation of hydroelectric generating units is investigated. Typical objective criterion: Structure of plant and controller. Here, MPC is a Single Input, Multiple Output (SIMO) controller. Capabillity diagram of a synchronous generator An attractive feature of MPC is its capability to handle Multiple Input, Multiple Output (MIMO) systems and nonlinear systems taking constraints into account. With increased provision of reactive power, the generating unit will be more mechanically stressed. Due to these stresses an investigation of thermal performance of the generating unit by varying the ratio of active/reactive power provision will be done An optimal utilization of thermal capacity and cooling mechanisms of hydroelectric synchronous generators should be found and compared with design and standards. Thanks to Statkraft for funding the study.
SFI - CIUS Center for innovative ultrasound solutions for health care, maritime, and oil & gas industries. CIUS er et av 17 SFI (SFI-III) som ble utpekt av hovedstyret i forskningsrådet for etablering fra 2015. Partnerne i SFI CIUS Vertsinstitusjon og forskningspartnere NTNU(vert), UiO, HSN og SINTEF Bedriftspartnere GE Vingmed Ultrasound AS, Statoil Petroleum AS, Kongsberg Maritime Division Subsea, Bergen Technology Center AS, Medistim ASA, Aurotech ultrasound AS, Phoenix Solutions AS, X-FAB semiconductor foundries AG, Sensorlink AS, Halfwave AS, InPhase Solutions AS. Brukerpartnere Helse Midt-Norge, St.Olavs Universitetssykehus, Levanger sykehus, Levanger og Verdal kommune. Totalbudsjettet for senteret er på 447 millioner hvorav 96 millioner er bevilgningen fra forskningsrådet. Forskningsaktivitetene på HSN er kostnadsberegnet til ca 31,5 millioner. Hvor midlene hovedsakelig skal benyttes til 8 rekrutteringsstillinger (stipendiater) og andre forskere ved HSN. Alle de 8 ph.d.-kandidatene vil bli ta opp på HSNs ph.d.-program. HSN har en egenandel på 13,2 millioner i prosjektet hvor forpliktelsen er i form av at HSN stiller 4 KD stipendiater til rådighet for forskningsarbeid i SFIen.
Samarbeide med Skagerak og Statkraft Prosjektets mål: Å etablere modell for kraftverk med vannvei samt å benytte denne til produksjonsoptimalisering Å utveksle kompetanse mellom Høgskolen i Sørøst- Norge og Skagerak Kraft / Statkraft. Å utdanne 10 personer årlig med fordypning innenfor kraftsystemer på Bachelor nivå. Å utdanne 5 personer årlig med fordypning innen regulering av vannvei/kraftverk på Masternivå. Å sette igang 2-3 PhD-studenter ved HSN med fordypning innen optimal vannkraftproduksjon i løpet av prosjektperioden. Det er et felles ansvar for Skagerak/Statkraft og HSN å søke om midler til disse studier.
www.usn.no