PSA letter on capping and other new regulation proposals from PSA Øystein Joranger - Licensing Policy Committee, meeting No.

Størrelse: px
Begynne med side:

Download "PSA letter on capping and other new regulation proposals from PSA Øystein Joranger - Licensing Policy Committee, meeting No."

Transkript

1

2 PSA letter on capping and other new regulation proposals from PSA Øystein Joranger - Licensing Policy Committee, meeting No. 2/2013 2

3 PSA letter on capping 20 March 2013 Norwegian Oil and Gas letter to PSA The letter of 20 March 2013 from the Petroleum Safety Authority Norway (PSA) specifies that: As a consequence of experience from the Macondo incident and others, and of the fact that equipment has now been developed as mentioned above, the PSA envisages that a need exists in its area of jurisdiction to introduce a specific requirement that an agreement is entered into, before drilling starts, on the availability of equipment for capping the well in the event of a loss of well control. 3

4 PSA letter on capping 20 March 2013 Norwegian Oil and Gas letter to PSA The letter of 22 March 2013 from Norwegian Oil and Gas No requirement exists in the regulations today on the availability of such equipment, which is also specified in the letter where it states that such a requirement will be proposed in the next revision of the regulations. Norwegian Oil and Gas takes a very negative view of the fact that the PSA is implementing new requirements through a letter to the industry before new regulations have been adopted and before these regulations have been through the regular consultation process. Norwegian Oil and Gas requests that this identical letter be withdrawn and that the proposal for new requirements conforms with the normal regulatory process. 4

5 PSA letter on capping 20 March 2013 Norwegian Oil and Gas letter to PSA Prosess in the Oil Industry Meeting in Norwegian Oil and Gas 30 May (between Oil companies and Oil Spills Response Limited (OSRL) - Subsea Well Response Project (SWRP))for discussion of: operation of the capping and dispersant equipment Guarantee requirements 5

6 New regulation proposals from PSA 27 May 2013 Capping The Activities Regulation 86 «Før borestart skal det sikres tilgjengelighet av innretning(er) for avlastningsboring og utstyr for kapsling av brønnen og pumping av borevæske ved tap av brønnkontroll.» The following is required prior to start of the drilling activity: It is require to ensure availability og facilities fro relief Well drilling and equipment for capping and pumping of drilling fluid in case of loss of well control. 6

7 New regulation proposals from PSA 27 May 2013 Capping The Activities Regulation 86 Justification Lessons learned from Macondo and Montara has shown that previous equipment for capping and pumping were not adequate for this type of event. Equipment is therefore developed, and the industry established bases in Stavanger in 2012, and Peterhead in Scotland for this type of equipment. Financial and administrative implications Det foreslåtte kravet om å sikre tilgjengelighet av erstatningsboreinnretning(er) og utstyr til kapsling og pumping av borevæske vil medføre kostnader om en ikke allerede har sikret seg denne tilgjengeligheten. Kostnadene vurderes likevel som små i forhold til kostnadene som en større og ukontrollert utstrømning vil kunne påføre de ansvarlige. 7

8 New regulation proposals from PSA 27 May 2013 Relief well - The Activities Regulation 86 and Facilities Regulation section 5 Activities Regulation section 86: For brønner påbegynt etter xx.xx.2013 (endringsforskriftens ikrafttredelse), skal brønnkontrollen kunne gjenvinnes ved å intervenere direkte eller ved å bore én (1) avlastningsbrønn. For wells spudded after xx.xx.2013 (amending Regulation enters into force), the well control could be recovered by intervening directly or by drilling one (1) relief well. Facilities Regulation section 5 Brønner skal utformes slik at det er tilstrekkelig med én (1) avlastningsbrønn for å kunne motstå utstrømning. Wells shall be designed in a way which means that it is sufficient to drill one relief wells. 8

9 New regulation proposals from PSA Relief well - The Activities Regulation 86 and Facilities Regulation section 5 Justification Forslag er en følge av økt oppmerksomhet rundt utblåsing og drepeberegninger for letebrønner på norsk sokkel. Nye erfaringer har vist at utblåsing fra åpent hull også er et realistisk scenario for utblåsingsberegningene, og den senere tids storulykker har aktualisert problemstillingen ytterligere, jf. macondo- og montarahendelsene. Industrien har ikke demonstrert at avlastningsboring med to brønner er praktisk gjennomførbart til havs. Boring av to til tre avlastningsbrønner i et begrenset område vil være en formidabel utfordring med tanke på utstyret og boreinnretningene som kreves i en slik situasjon. Financial and administrative implications Ettersom brønnkontrollen i de fleste tilfeller kan gjenvinnes ved å drepe brønnen med én (1) avlastningsbrønn allerede i dag, antas ikke dette endringsforslaget å medføre særlige kostnader. Imidlertid kan det medføre økte kostnader i enkelttilfeller, der utforming av brønner medfører behov for flere foringsrørstørrelser eller lengre fôringsrør. I antatt svært sjeldne tilfeller kan forslaget medføre at brønner ikke kan bores, og at potensielle feltutbygginger derfor må settes på vent, jf. kravene til forsvarlig virksomhet. 9

10 New regulation proposals from PSA Securing wells The Activities Regulation 88 «Letebrønner som påbegynnes etter xx.xx.2013 (dvs. endringsforskriftens ikrafttredelse), skal ikke midlertidig forlates utover to år. Ved midlertidig forlating av utvinningsbrønner utover tre år etter xx.xx.2013 (dvs. endringsforskriftens ikrafttredelse), skal hydrokarbonførende soner plugges og forlates permanent innen påfølgende to år.» "Exploratory wells that commenced after xx.xx.2013 (ie change regulations enter into force) shall not temporarily vacated more than two years. The temporary abandonment of production wells than three years after xx.xx.2013 (ie change regulations enter into force), the hydrocarbon bearing zones permanently plugged and abandoned in the subsequent two years. " 10

11 New regulation proposals from PSA Securing wells The Activities Regulation 88 Justification Det er i dag et større antall brønner som ikke er permanent plugget og forlatt, med de sikkerhets-messige utfordringer dette innebærer. Operasjonell risiko og tekniske utfordringer ved gjennomføring av pluggeoperasjonen øker med tiden brønnene står midlertidig forlatt. I vårt brønnintegritetsprosjekt for midlertidig forlatte brønner kom det frem at 10 prosent av totalt 193 brønner har alvorlige sikkerhetsmessige utfordringer, og 32 prosent som har mindre sikkerhetsmessige ufordringer. Dette viser et behov for å innskjerpe dagens krav til sikring av brønner som foreslått. Financial and administrative implications Den foreslåtte endringen vil ha økonomiske og administrative konsekvenser ved at kostnadene med å sikre brønnene ikke kan skyves ut på ubestemt tid. Samtidig vil forslaget kunne føre til noe økt press i markedet for mobile innretninger, med de praktiske og økonomiske konsekvensene dette kan få. 11

Høringsutkast AKTIVITETSFORSKRIFTEN 2013

Høringsutkast AKTIVITETSFORSKRIFTEN 2013 Forskrift om endring i forskrift om utføring av aktiviteter i petroleumsvirksomheten (aktivitetsforskriften). Fastsatt av Petroleumstilsynet. i medhold av lov 29. november 1996 nr. 72 om petroleumsvirksomhet

Detaljer

Nåværende EU-rett Dir 96/3/EC

Nåværende EU-rett Dir 96/3/EC Article 1 Derogation By way of derogation to point 4 of Chapter IV of Annex II to Regulation EC (No) 852/2004, liquid oils or fats which are intended for or likely to be used for human consumption ('oils

Detaljer

ADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ.

ADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ. ADDENDUM SHAREHOLDERS AGREEMENT by between Aker ASA ( Aker ) Investor Investments Holding AB ( Investor ) SAAB AB (publ.) ( SAAB ) The Kingdom of Norway acting by the Ministry of Trade Industry ( Ministry

Detaljer

Independent Inspection

Independent Inspection Independent Inspection Odd Ivar Johnsen Vidar Nystad Independent Inspection Mål: Felles forståelse og utøvelse av "Independent Inspection" i forbindelse med "Critical Maintenance Task". Independent Inspection

Detaljer

- Status - Brønndesign og brønnintegritet på norsk sokkel ----- ESRA seminar 3.9.2014 -----

- Status - Brønndesign og brønnintegritet på norsk sokkel ----- ESRA seminar 3.9.2014 ----- - Status - Brønndesign og brønnintegritet på norsk sokkel ----- ESRA seminar 3.9.2014 ----- Arne M. Enoksen Sjefingeniør Bore- og brønnteknologi Petroleumstilsynet Innhold i presentasjonen Risikovurdering

Detaljer

STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD

STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD 1 Bakgrunnen for dette initiativet fra SEF, er ønsket om å gjøre arbeid i høyden tryggere / sikrere. Både for stillasmontører og brukere av stillaser. 2 Reviderte

Detaljer

HMS og IKT-sikkerhet i integrerte operasjoner

HMS og IKT-sikkerhet i integrerte operasjoner HMS og IKT-sikkerhet i integrerte operasjoner Uønskede hendelser, oppfølging mot indikatorer og planer videre Randi Røisli CISO (Statoil) Leder arbeidsgruppe informasjonssikkerhet (OLF IO) 2 Eller historien

Detaljer

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Vigdis Bjørlo 2016-02-05 Suppliers' obligations in relation to the Construction Client Regulations

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER

Detaljer

Deepwater Horizon Erfaringer og oppfølging

Deepwater Horizon Erfaringer og oppfølging Deepwater Horizon Erfaringer og oppfølging Ptil s brev av 23.4.2012 Sikkerhetsforum 6. juni 2012 Deepwater Horizon Erfaringer og oppfølging Agenda: Prosjekt oversikt og sammendrag Forebygging av storulykker

Detaljer

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa UNDERWRITING LIMITS The following tables show our financial and medical underwriting limits effective from 11 April 2016. FINANCIAL LIMITS Protection Financial evidence requirements Additional financial

Detaljer

Gol Statlige Mottak. Modul 7. Ekteskapsloven

Gol Statlige Mottak. Modul 7. Ekteskapsloven Gol Statlige Mottak Modul 7 Ekteskapsloven Paragraphs in Norwegian marriage law 1.Kjønn To personer av motsatt eller samme kjønn kan inngå ekteskap. Two persons of opposite or same sex can marry 1 a. Ekteskapsalder.

Detaljer

FLAGGING NOT FOR DISTRIBUTION OR RELEASE, DIRECTLY OR FLAGGING. eller "Selskapet"). 3,20 pr aksje:

FLAGGING NOT FOR DISTRIBUTION OR RELEASE, DIRECTLY OR FLAGGING. eller Selskapet). 3,20 pr aksje: MeldingsID: 327238 Innsendt dato: 06.05.2013 08:34 UtstederID: Utsteder: Instrument: Marked: Kategori: Informasjonspliktig: Lagringspliktig: Vedlegg: Tittel: Meldingstekst: REACH Reach Subsea ASA REACH

Detaljer

Godkjenning av hydrogen som drivstoff på skip

Godkjenning av hydrogen som drivstoff på skip Godkjenning av hydrogen som drivstoff på skip Kolbjørn Berge Sjøfartsdirektoratet Innhold Nasjonalt regelverk Internasjonalt regelverk IGF Alternativt design MSC.1/Circ.1455 - Guidelines for the approval

Detaljer

Tripartite. The regulations also create a general duty for employees to help shape, implement and follow up systematic HSE efforts in the industry.

Tripartite. The regulations also create a general duty for employees to help shape, implement and follow up systematic HSE efforts in the industry. Tripartite Collaboration between employers, unions and government is not only enshrined in Norwegian petroleum policy, but also essential for progress on HSE. That puts Norway in a unique position. Trepartssamarbeid

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon EXPLORATION. Faktakart i nytt vindu. lenke

ODs Faktasider. Brønnbane / Leting. Generell informasjon EXPLORATION. Faktakart i nytt vindu. lenke Generell informasjon Brønnbane navn Type Formål Status Faktakart i nytt vindu Hovedområde 6508/1-1 A EXPLORATION WILDCAT P&A lenke NORWEGIAN SEA Brønn navn 6508/1-1 Seismisk lokalisering ST9203- INNLIN

Detaljer

Haakon VII s gt. 1, Oslo mandag 23. januar 2006 kl 10:00.

Haakon VII s gt. 1, Oslo mandag 23. januar 2006 kl 10:00. Til aksjeeierne i Songa ASA INNKALLING TIL EKSTRAORDINÆR GENERALFORSAMLING Ekstraordinær generalforsamling i Songa ASA holdes på selskapets kontor i Haakon VII s gt. 1, Oslo mandag 23. januar 2006 kl 10:00.

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Side 1 av 5. Utskriftstidspunkt: :09

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Side 1 av 5. Utskriftstidspunkt: :09 Generell informasjon Side 1 av 5 Side 2 av 5 Brønnbane navn 6507/7-9 Type Formål Status Faktakart i nytt vindu Hovedområde Felt Funn EXPLORATION APPRAISAL P&A lenke NORWEGIAN SEA HEIDRUN Brønn navn 6507/7-9

Detaljer

Filipstad Brygge 1, 8. etg, Oslo. 14. oktober 2005 kl 12:00

Filipstad Brygge 1, 8. etg, Oslo. 14. oktober 2005 kl 12:00 Til aksjeeiere i Norgani Hotels ASA INNKALLING TIL EKSTRAORDINÆR GENERALFORSAMLING Ekstraordinær generalforsamling i Norgani Hotels ASA holdes på: Filipstad Brygge 1, 8. etg, Oslo 14. oktober 2005 kl 12:00

Detaljer

PIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER

PIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER SLUTTRAPPORT Innhold 1. Innledning 1.1 Deltakere 1.2 Bakgrunn 1.3 Mål 1.4 Organisasjon 2. Oppsummering 3. Summary in English 4. Referanser/References 1. INNLEDNING 1.1 Deltakere Alcan á Ísland Alcoa Fjarðaál

Detaljer

2 Valg av møteleder 2 Election of a Chairman of the Meeting

2 Valg av møteleder 2 Election of a Chairman of the Meeting (OFFICE TRANSLATION) INNKALLING TIL ORDINÆR GENERALFORSAMLING I ISLAND DRILLING COMPANY ASA ORG NR 989 734 229 NOTICE OF ANNUAL GENERAL MEETING OF ISLAND DRILLING COMPANY ASA REG NO 989 734 229 Den 9 juni

Detaljer

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Existing Relay-based Interlocking System Upgrades (NSI-63) Jostein Heimark Project Manager Signalling Innhold Introduksjon

Detaljer

Tilleggsinformasjon og korrigeringer Complementary information and corrections

Tilleggsinformasjon og korrigeringer Complementary information and corrections Rev. 11. januar/january 2008 A-115310 Tilleggsinformasjon og korrigeringer Complementary information and corrections Begrenset Plan- og designkonkurranse / Limited Design contest Nesodden municipal centre

Detaljer

Workshop 22. september 2015

Workshop 22. september 2015 Workshop 22. september 2015 Rapporteringsforordning (EU) nr. 376/2014 Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no Postadresse: Postboks 243 8001 BODØ Besøksadresse: Sjøgata

Detaljer

Forslag til blokker til utlysning i 21. konsesjonsrunde - innspill fra kystverket

Forslag til blokker til utlysning i 21. konsesjonsrunde - innspill fra kystverket HOVEDKONTORET Fiskeri- og kystdepartementet Postboks 8118 Dep. 0032 OSLO Deres ref 200900909- /LF Vår ref 10/00921-6 Arkiv nr 008 Saksbehandler Trond Langmyr m.fl Dato 30.4.2010 Forslag til blokker til

Detaljer

Nytt EU-direktiv om forebygging av stikkskader, betydning for oss? Dorthea Hagen Oma Smittevernlege Helse Bergen

Nytt EU-direktiv om forebygging av stikkskader, betydning for oss? Dorthea Hagen Oma Smittevernlege Helse Bergen Nytt EU-direktiv om forebygging av stikkskader, betydning for oss? Dorthea Hagen Oma Smittevernlege Helse Bergen The EU Sharps Directive blei vedtatt i mai 2010 direktivet er juridisk bindande også i

Detaljer

Forslag til nytt anskaffelsesdirektiv

Forslag til nytt anskaffelsesdirektiv Forslag til nytt anskaffelsesdirektiv -kommisjonen har vedtatt ett forslag til nytt anskaffelsesdirektiv for blandt annet klassisk sektor, COM(2011) 896/2 Skal behandles I -rådet og deretter i parlamentet

Detaljer

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward C13 Kokstad Svar på spørsmål til kvalifikasjonsfasen Answers to question in the pre-qualification phase For English: See page 4 and forward Norsk Innhold 1. Innledning... 2 2. Spørsmål mottatt per 28.11.12...

Detaljer

lassification: Internal Undervannssystemer Krav til Barrierer under Produksjon og Vedlikehold

lassification: Internal Undervannssystemer Krav til Barrierer under Produksjon og Vedlikehold lassification: Internal Undervannssystemer Krav til Barrierer under Produksjon og Vedlikehold 2 Krav til Barrierer under Produksjon og Vedlikehold Forskrifter Standarder StatoilHydros styrende dokumenter

Detaljer

Status Aker Verdal Mai 2010

Status Aker Verdal Mai 2010 part of Aker Status Aker Verdal Mai 2010 Verdal Formannskap 6. mai 2010 Nina Udnes Tronstad President, Aker Solutions, Verdal 2010 Aker Solutions Financials AKSO total - Q1/2010 ED&S Subsea P&T P&C Revenue

Detaljer

Eiendomsverdi. The housing market Update September 2013

Eiendomsverdi. The housing market Update September 2013 Eiendomsverdi The housing market Update September 2013 Executive summary September is usually a weak month but this was the weakest since 2008. Prices fell by 1.4 percent Volumes were slightly lower than

Detaljer

Jan Krokeide Fagsjef boring - OLF. Kvalitetssikring av Brønn kontroll kompetanse

Jan Krokeide Fagsjef boring - OLF. Kvalitetssikring av Brønn kontroll kompetanse NFLB Høstkonferanse 22.oktober 2010 Samhandling på tvers av selskap og interesser kunder, leverandører, operatører hvordan kan vi gjøre hverandre bedre? Jan Krokeide Fagsjef boring - OLF Innhold: Bakgrunn

Detaljer

En praktisk anvendelse av ITIL rammeverket

En praktisk anvendelse av ITIL rammeverket NIRF 17. april 2012 En praktisk anvendelse av ITIL rammeverket Haakon Faanes, CIA,CISA, CISM Internrevisjonen NAV NAVs ITIL-tilnærming - SMILI NAV, 18.04.2012 Side 2 Styring av tjenestenivå Prosessen omfatter

Detaljer

Brønnkontrollhendelser Unik kunnskapsdeling gir forbedring

Brønnkontrollhendelser Unik kunnskapsdeling gir forbedring Sikkerhetsforums årskonferanse 2016 15. juni 2016 Brønnkontrollhendelser Unik kunnskapsdeling gir forbedring Harald Blikra, Team Lead Exploration Drilling, Repsol, medlem i WITF Innhold 1. Forbedret læring

Detaljer

ENDRINGSFORSKRIFT AKTIVITETSFORSKRIFTEN 2013 FASE 1

ENDRINGSFORSKRIFT AKTIVITETSFORSKRIFTEN 2013 FASE 1 Forskrift om endring i forskrift om utføring av aktiviteter i petroleumsvirksomheten (aktivitetsforskriften). Fastsatt av Petroleumstilsynet 23.desember 2013 i medhold av lov 29. november 1996 nr. 72 om

Detaljer

ATO program for Renewal of IR, Class or Type-rating

ATO program for Renewal of IR, Class or Type-rating May be used by the ATO in order to establish an individual training program for renewal of IR, Class or Type-rating in accordance with FCL.625 IR(c)(d) / AMC1 FCL.625(c) and FCL.740(b)(1)(2) / AMC1 FCL.740(b)(1)

Detaljer

FORSLAG OM KAPITALNEDSETTELSE I PROPOSED REDUCTION OF SHARE CAPITAL IN. ALADDIN OIL & GAS COMPANY ASA (Business Registration No.

FORSLAG OM KAPITALNEDSETTELSE I PROPOSED REDUCTION OF SHARE CAPITAL IN. ALADDIN OIL & GAS COMPANY ASA (Business Registration No. FORSLAG OM KAPITALNEDSETTELSE I ALADDIN OIL & GAS COMPANY ASA (Organisasjonsnummer 989 307 606) Vedtatt av Selskapets styre den 15. mai 2012. PROPOSED REDUCTION OF SHARE CAPITAL IN ALADDIN OIL & GAS COMPANY

Detaljer

Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer

Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer Morten Sørum, Senior Advisor Safety, Statoil Classification: Internal 2014-11-16 ALARP prinsippet ALARP (As Low

Detaljer

// Translation // KLART SVAR «Free-Range Employees»

// Translation // KLART SVAR «Free-Range Employees» // Translation // KLART SVAR «Free-Range Employees» Klart Svar is a nationwide multiple telecom store, known as a supplier of mobile phones and wireless office solutions. The challenge was to make use

Detaljer

2 Valg av møteleder 2 Election of a Chairman of the Meeting

2 Valg av møteleder 2 Election of a Chairman of the Meeting (OFFICE TRANSLATION) INNKALLING TIL ORDINÆR GENERALFORSAMLING I MARACC- MARINE ACCURATE WELL ASA ORG NR 989 734 229 NOTICE OF ANNUAL GENERAL MEETING OF MARACC- MARINE ACCURATE WELL ASA REG NO 989 734 229

Detaljer

INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011)

INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) 1 Oppgaver Valgkomiteens oppgaver er å avgi innstilling til - generalforsamlingen

Detaljer

Gaute Langeland September 2016

Gaute Langeland September 2016 Gaute Langeland September 2016 Svak krone 10,4 10 9,6 9,2 8,8 8,4 EURNOK 8 7,6 7,2 6,8 3jan00 3jan02 3jan04 3jan06 3jan08 3jan10 3jan12 3jan14 3jan16 2 12.10.2016 Ikke helt tilfeldig 3 12.10.2016 Hvordan

Detaljer

Lekkasjar frå gassløft-brønnar i risikoanalyse. datakjelder og frekvensar

Lekkasjar frå gassløft-brønnar i risikoanalyse. datakjelder og frekvensar Lekkasjar frå gassløft-brønnar i risikoanalyse datakjelder og frekvensar Agenda I programmet: Hvordan blir risiko fra gassløftbrønner inkludert i risikoanalyser (QRA/TRA), og blir risikoen reflektert på

Detaljer

Licence interests on the Norwegian continental shelf

Licence interests on the Norwegian continental shelf Licence interests on the Norwegian continental shelf Relinquishment of full production licences in 2001: Production licences 114, 114B and 114C. Transfers in 2001 Licence From: To: Share: 006 Amerada Hess

Detaljer

INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS)

INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS) INFO TAXI REMOTE Taxi Management CONTROL SYSTEM (TMCS) November 2015 taxi remote taxi remote I Taxi Management Control System registreres taxier med en transponderbrikke festet til frontruten. Brikken

Detaljer

Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014

Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014 Independent audit av kvalitetssystemet, teknisk seminar 25-26 november 2014 Valter Kristiansen Flyteknisk Inspektør, Teknisk vedlikehold Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no

Detaljer

Tilsyn med IKT-sikkerhet i boreprosesskontroll, støttesystemer innen petroleumsnæringen

Tilsyn med IKT-sikkerhet i boreprosesskontroll, støttesystemer innen petroleumsnæringen Tilsyn med IKT-sikkerhet i boreprosesskontroll, sikkerhets- og støttesystemer innen petroleumsnæringen Presentasjon av resultater fra tilsynet Asbjørn Ueland, sjefsingeniør Bakgrunn for tilsynet Arbeid

Detaljer

PETROLEUM PRICE BOARD

PETROLEUM PRICE BOARD 1 PETROLEUM PRICE BOARD Our reference Date OED 15/712 21/09/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com

Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com Mål Målet i Green Drive Region er at 10 % av alle personbiler i Indre Skandinavia

Detaljer

Perpetuum (im)mobile

Perpetuum (im)mobile Perpetuum (im)mobile Sett hjulet i bevegelse og se hva som skjer! Hva tror du er hensikten med armene som slår ut når hjulet snurrer mot høyre? Hva tror du ordet Perpetuum mobile betyr? Modell 170, Rev.

Detaljer

LUFTDYKTIGHETSP ABUD

LUFTDYKTIGHETSP ABUD MERK! For at angjeldende flymateriell skal være luftdyktig må påbudet være utført til rett tid og notat om utførelsen ført inn i vedkommende iournal med henvisniniz til denne LDPs nummer. Luftartstilsynet

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON1220 Velferd og økonomisk politikk Exam: ECON1220 Welfare and politics Eksamensdag: 29.11.2010 Sensur kunngjøres: 21.12.2010 Date of exam: 29.11.2010

Detaljer

Rapport etter tilsyn med selskapets planer for permanent plugging og forlating av brønner på Statfjord A. Begrenset Fortrolig. T-1 Johnny Gundersen

Rapport etter tilsyn med selskapets planer for permanent plugging og forlating av brønner på Statfjord A. Begrenset Fortrolig. T-1 Johnny Gundersen Revisjonsrapport Rapport Rapporttittel Rapport etter tilsyn med selskapets planer for permanent plugging og forlating av brønner på Statfjord A Aktivitetsnummer 001037030 Gradering Offentlig Unntatt offentlighet

Detaljer

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers

Detaljer

Feiltre, hendelsestre og RIF-modell

Feiltre, hendelsestre og RIF-modell Initiating Event BB4 Initiating Event Type 3 End Control Type Type 2 End Control 2 B5/C2 Feiltre, hendelsestre og RIFmodell Rolf Bye, Studio Apertura Initiating Event structure C & C3 Omission structure

Detaljer

ILO- 98 Rett til kollektive forhandlinger.

ILO- 98 Rett til kollektive forhandlinger. ILO 98 Artikkel 1.1. Når det gjelder sysselsetting, skal arbeidstakerne nyte tilstrekkelig vern mot all diskriminering som innebærer et angrep på foreningsfriheten.2. Dette vern skal særlig være rettet

Detaljer

LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014

LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014 1 LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014 REGLEMENT FOR BRUK AV KALKULATOR OG ORDBOK SE SISTE SIDE 1. STUDIEÅR (ØKAD/REV): Finansregnskap m/ikt (ØABED1000) Markedsføring og

Detaljer

Biproduktforordningen arbeidet med nytt regelverk. Marie Opsal Tangen, seniorrådgiver Regelverksavdelingen, Hovedkontoret

Biproduktforordningen arbeidet med nytt regelverk. Marie Opsal Tangen, seniorrådgiver Regelverksavdelingen, Hovedkontoret Biproduktforordningen arbeidet med nytt regelverk Marie Opsal Tangen, seniorrådgiver Regelverksavdelingen, Hovedkontoret Lynkjapt tilbakeblikk på hvorfor vi har en biproduktforordning: Kugalskap, munn

Detaljer

Juridiske aspekter ved publisering i åpne institusjonelle arkiv

Juridiske aspekter ved publisering i åpne institusjonelle arkiv Juridiske aspekter ved publisering i åpne institusjonelle arkiv Professor dr juris Olav Torvund Publisering i åpne institusjonelle arkiv Førstegangspublisering Masteroppgaver Doktoravhandlinger (?) Grålitteratur

Detaljer

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no Public roadmap for information management, governance and exchange 2015-09-15 SINTEF david.norheim@brreg.no Skate Skate (governance and coordination of services in egovernment) is a strategic cooperation

Detaljer

VEDTEKTER FOR ELECTROMAGNETIC GEOSERVICES ASA. (Sist endret den 16 september 2013) 1 Navn

VEDTEKTER FOR ELECTROMAGNETIC GEOSERVICES ASA. (Sist endret den 16 september 2013) 1 Navn VEDTEKTER FOR ELECTROMAGNETIC GEOSERVICES ASA (Sist endret den 16 september 2013) 1 Navn Selskapets foretaksnavn er Electromagnetic Geoservices ASA. Selskapet er et allmennaksjeselskap. 2 Forretningskontor

Detaljer

Morten Walløe Tvedt, Senior Research Fellow, Lawyer. Seminar 6.juni 2008

Morten Walløe Tvedt, Senior Research Fellow, Lawyer. Seminar 6.juni 2008 Morten Walløe Tvedt, Senior Research Fellow, Lawyer Seminar 6.juni 2008 My Background: Marine and Fish Genetic Resource: Access to and Property Rights of Aquaculture Genetic Resources Norwegian Perspectives

Detaljer

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

Hvordan føre reiseregninger i Unit4 Business World Forfatter: Hvordan føre reiseregninger i Unit4 Business World Forfatter: dag.syversen@unit4.com Denne e-guiden beskriver hvordan du registrerer en reiseregning med ulike typer utlegg. 1. Introduksjon 2. Åpne vinduet

Detaljer

KAPITTEL S - SIKKERHET

KAPITTEL S - SIKKERHET KAPITTEL S - SIKKERHET JAR-OPS 1.1235 Sikkerhetskrav Et luftfartsforetak skal sikre at alt berørt personell har kunnskap om og tilfredsstiller de relevante kravene i de nasjonale sikkerhetsprogrammene

Detaljer

PETROLEUMSPRISRÅDET CORRECTIONS OF NORM PRICES Q AND REVISED NORM PRICES FOR HEIDRUN NOVEMBER 2015

PETROLEUMSPRISRÅDET CORRECTIONS OF NORM PRICES Q AND REVISED NORM PRICES FOR HEIDRUN NOVEMBER 2015 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 20. mai 2016 To the licensees on the NCS (Unofficial translation) CORRECTIONS OF NORM PRICES Q4 2015 AND REVISED NORM PRICES FOR HEIDRUN NOVEMBER 2015

Detaljer

Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler

Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler UNIVERSITETET I OSLO INF1300 Introduksjon til databaser Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler Institutt for informatikk Dumitru Roman 1 Eksempel (1) 1. The system shall give an overview

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 2/4-9 EXPLORATION. Faktakart i nytt vindu. lenke 1/6-1 ALBUSKJELL

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 2/4-9 EXPLORATION. Faktakart i nytt vindu. lenke 1/6-1 ALBUSKJELL Generell informasjon Brønnbane navn 2/4-9 Type Formål Status Faktakart i nytt vindu Hovedområde Felt Funn EXPLORATION APPRAISAL P&A lenke Brønn navn 2/4-9 Seismisk lokalisering Boret i utvinningstillatelse

Detaljer

SeaWalk No 1 i Skjolden

SeaWalk No 1 i Skjolden SeaWalk No 1 i Skjolden August 2011 Luster Kommune Marked I løpet av de neste 10 år er verdens cruisemarked ventet å doble seg. Veksten forventes større i Europa enn i Kariben og USA. Markedet vil lete

Detaljer

Har vi et effektivt riggsamarbeid?

Har vi et effektivt riggsamarbeid? Har vi et effektivt riggsamarbeid? 16.11.2016 Bjarne Syrstad, Head of Drilling and Well Operations Disclaimer This presentation contains certain forward-looking statements that are subject to the usual

Detaljer

SFI-Norman presents Lean Product Development (LPD) adapted to Norwegian companies in a model consisting of six main components.

SFI-Norman presents Lean Product Development (LPD) adapted to Norwegian companies in a model consisting of six main components. Hovedoppgave Masteroppgave ved ved IMM Høsten 2013 Lean Product Development Stability Drivers. Identifying Environmental Factors that Affect Performance. SFI-Norman presents Lean Product Development (LPD)

Detaljer

Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives

Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives Norsk mal: Startside Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives Johan Vetlesen. Senior Energy Committe of the Nordic Council of Ministers 22-23. april 2015 Nordic Council of Ministers.

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 31/5-6 EXPLORATION. Pressemelding Faktakart i nytt vindu.

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 31/5-6 EXPLORATION. Pressemelding Faktakart i nytt vindu. Generell informasjon Brønnbane navn 31/5-6 Type Formål Status Pressemelding Faktakart i nytt vindu Hovedområde EXPLORATION WILDCAT P&A lenke lenke NORTH SEA Brønn navn 31/5-6 Seismisk lokalisering Boret

Detaljer

Ansvar for grenseoverskridende forurensning Norge/Russland

Ansvar for grenseoverskridende forurensning Norge/Russland Ansvar for grenseoverskridende forurensning Norge/Russland oprofessor Erik Røsæg onordisk institutt for sjørett, Universitetet i Oslo oerik. rosag@jus. uio. no ofolk. uio. no/erikro Montara 2 NORSKE ANSVARSREGLER

Detaljer

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016,

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, OIL & GAS A NEW REALITY DNV GL Industry Outlook for 2016 Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, 1 2013 SAFER, SMARTER, GREENER 3 februar 2016

Detaljer

JBV DSB godkjenninger

JBV DSB godkjenninger JBV DSB godkjenninger Leverandørmøte 2015-02-03 Willy Karlsen Sakkyndig driftsleder Electrical operation manager Eier av JBVs elektriske anlegg Alle jernbaneverkets elektriske anlegg er delt opp på de

Detaljer

Morten Lunde, Sr. Occupational Hygienist ConocoPhillips 2. April 2014

Morten Lunde, Sr. Occupational Hygienist ConocoPhillips 2. April 2014 Kan kontraktene påvirke risiko for støyskader? - Er utvikling av støyvennlige rammebetingelser er mulig? Morten Lunde, Sr. Occupational Hygienist ConocoPhillips 2. April 2014 Cautionary Statement The following

Detaljer

Tillit i hierarkiske og gjensidige relasjoner. Lars Huemer, Professor, BI Partnerforum 29 mai 2017

Tillit i hierarkiske og gjensidige relasjoner. Lars Huemer, Professor, BI Partnerforum 29 mai 2017 Tillit i hierarkiske og gjensidige relasjoner Lars Huemer, Professor, BI Partnerforum 29 mai 2017 Temaer Hva er en relasjon? Hva er en hierarkisk relasjon? Hva er en gjensidig relasjon? Hva er tillit i

Detaljer

Stipend fra Jubileumsfondet skoleåret 2002-2003

Stipend fra Jubileumsfondet skoleåret 2002-2003 Til skolen Rundskriv S 09-2002 Oslo, 15. februar 2002 Stipend fra Jubileumsfondet skoleåret 2002-2003 For nærmere omtale av H.M. Kong Olav V s Jubileumsfond viser vi til NKF-handboka kap. 12.3.4. Fondet

Detaljer

Petroleumstilsynet Bore- og brønn teknologi

Petroleumstilsynet Bore- og brønn teknologi Petroleumstilsynet Bore- og brønn teknologi Oppdatering av regelverk etter Macondo hendelsen Årlig oppdatering av regelverk og standarder Arne M. Enoksen Sjefingeniør Fagområde B&B Regelverk og standardisering

Detaljer

NOTICE OF INNKALLING TIL EKSTRAORDINARY GENERAL MEETING EKSTRAORDINÆR GENERALFORSAMLING. Office translation:

NOTICE OF INNKALLING TIL EKSTRAORDINARY GENERAL MEETING EKSTRAORDINÆR GENERALFORSAMLING. Office translation: Til aksjonærene i AGR Group ASA To the shareholders of AGR Group ASA Office translation: INNKALLING TIL NOTICE OF EKSTRAORDINÆR GENERALFORSAMLING EKSTRAORDINARY GENERAL MEETING Ekstraordinær generalforsamling

Detaljer

Shells energiscenarier frem til 2050

Shells energiscenarier frem til 2050 Shells energiscenarier frem til 2050 EnergiRike konferansen, Haugesund 11.-12. August 2009 Nina Holm Viste, A/S Norske Shell Copyright: Shell International BV Disclaimer statement This presentation contains

Detaljer

17. desember 2015 kl.15.00 17 December 2015 at 15.00 (CET) 4. FORSLAG OM ENDRING AV VEDTEKTENE 5 4 PROPOSAL FOR CHANGE OF ARTICLES OF ASSOCIATIONS 5

17. desember 2015 kl.15.00 17 December 2015 at 15.00 (CET) 4. FORSLAG OM ENDRING AV VEDTEKTENE 5 4 PROPOSAL FOR CHANGE OF ARTICLES OF ASSOCIATIONS 5 OFFICE TRANSLATION INNKALLING TIL EKSTRAORDINÆR GENERALFORSAMLING Ekstraordinær generalforsamling i LINK Mobility Group ASA, org nr 984 066 910 holdes i: NOTICE OF EXTRAORDINARY GENERAL MEETING Extraordinary

Detaljer

Kartleggingsskjema / Survey

Kartleggingsskjema / Survey Kartleggingsskjema / Survey 1. Informasjon om opphold i Norge / Information on resident permit in Norway Hvilken oppholdstillatelse har du i Norge? / What residence permit do you have in Norway? YES No

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Side 1 av 6. Utskriftstidspunkt: :56

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Side 1 av 6. Utskriftstidspunkt: :56 Generell informasjon Side 1 av 6 Side 2 av 6 Brønnbane navn 7/11-4 Type Formål Status Faktakart i nytt vindu Hovedområde Felt Funn EXPLORATION WILDCAT P&A lenke NORTH SEA MIME 7/11-5 MIME Brønn navn 7/11-4

Detaljer

Windlass Control Panel

Windlass Control Panel SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e

Detaljer

Minutes from extraordinary general meeting of Q-Free ASA on 4 November 2011

Minutes from extraordinary general meeting of Q-Free ASA on 4 November 2011 Protokoll fra ekstraordinær generalforsamling Q-Free ASA den 4. november 2011 Minutes from extraordinary general meeting of Q-Free ASA on 4 November 2011 Ekstraordinær generalforsamling ble avholdt fredag

Detaljer

Utviklingen i finansmarkedene

Utviklingen i finansmarkedene Utviklingen i finansmarkedene Danske Markets Norge Kjell Johansen Island 01.05.2015 +47 85 41 99 53 kjjo@danskebank.com 2 Simulering av renterisiko Utfallsrom aktuelle renter 3m Nibor 5-års swap 10-års

Detaljer

NFLB Høstkonferanse 16. september 2011 Brønnkontroll veien videre. Jan Krokeide Fagsjef boring - OLF

NFLB Høstkonferanse 16. september 2011 Brønnkontroll veien videre. Jan Krokeide Fagsjef boring - OLF NFLB Høstkonferanse 16. september 2011 Jan Krokeide Fagsjef boring - OLF Innhold: - Bakgrunn - Litt om OLFs aktiviteter knyttet til brønnkontroll - Deepwater Horizon Macondo oppfølging - Internasjonalt

Detaljer

Innovasjonsvennlig anskaffelse

Innovasjonsvennlig anskaffelse UNIVERSITETET I BERGEN Universitetet i Bergen Innovasjonsvennlig anskaffelse Fredrikstad, 20 april 2016 Kjetil Skog 1 Universitetet i Bergen 2 Universitetet i Bergen Driftsinntekter på 4 milliarder kr

Detaljer

Du må håndtere disse hendelsene ved å implementere funksjonene init(), changeh(), changev() og escape(), som beskrevet nedenfor.

Du må håndtere disse hendelsene ved å implementere funksjonene init(), changeh(), changev() og escape(), som beskrevet nedenfor. 6-13 July 2013 Brisbane, Australia Norwegian 1.0 Brisbane har blitt tatt over av store, muterte wombater, og du må lede folket i sikkerhet. Veiene i Brisbane danner et stort rutenett. Det finnes R horisontale

Detaljer

Innstilling fra valgkomiteen til ekstraordinær generalforsamling 12. februar 2008

Innstilling fra valgkomiteen til ekstraordinær generalforsamling 12. februar 2008 Innstilling fra valgkomiteen til ekstraordinær generalforsamling 12. februar 2008 Vedlegg 1 / Annex 1 DOF ASA er blitt en betydelig aksjonær i DeepOcean ASA, og har uttrykt ønske om å få valgt inn Oddvar

Detaljer

Referansearkitektur use cases. Kjell Sand SINTEF Energi AS NTNU Institutt for elkraftteknikk

Referansearkitektur use cases. Kjell Sand SINTEF Energi AS NTNU Institutt for elkraftteknikk Referansearkitektur use cases Kjell Sand SINTEF Energi AS NTNU Institutt for elkraftteknikk 1 Begrunnelse for arkitektur use cases Med det brede perspektivet Smart grids har, er det nødvendig å dele det

Detaljer

Rocksource ASA «Full gass» i en bransje med bremsene på. Manifestasjon, Grieghallen 14. april 2015 Adm. direktør Terje Arnesen

Rocksource ASA «Full gass» i en bransje med bremsene på. Manifestasjon, Grieghallen 14. april 2015 Adm. direktør Terje Arnesen Rocksource ASA «Full gass» i en bransje med bremsene på Manifestasjon, Grieghallen 14. april 2015 Adm. direktør Terje Arnesen Disclaimer This presentation contains information provided by the management

Detaljer

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 34/10-10 EXPLORATION. Faktakart i nytt vindu. lenke

ODs Faktasider. Brønnbane / Leting. Generell informasjon. Brønnbane navn 34/10-10 EXPLORATION. Faktakart i nytt vindu. lenke Generell informasjon Brønnbane navn 34/10-10 Type Formål Status Faktakart i nytt vindu Hovedområde EXPLORATION WILDCAT SUSPENDED lenke NORTH SEA Brønn navn 34/10-10 Seismisk lokalisering 3D-224 SP 265

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Utsatt eksamen i: ECON1410 - Internasjonal økonomi Exam: ECON1410 - International economics Eksamensdag: 18.06.2013 Date of exam: 18.06.2013 Tid for eksamen: kl.

Detaljer

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6.

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. Administrasjon av postnummersystemet i Norge Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 Postnumrene i Norge ble opprettet 18.3.1968 The postal codes in Norway was established in

Detaljer

ERKLÆRING OM LØNN OG ANNEN GODTGJØRELSE TIL SELSKAPETS LEDENDE ANSATTE

ERKLÆRING OM LØNN OG ANNEN GODTGJØRELSE TIL SELSKAPETS LEDENDE ANSATTE ERKLÆRING OM LØNN OG ANNEN GODTGJØRELSE TIL SELSKAPETS LEDENDE ANSATTE Styret i Reservoir Exploration Technology ASA ( Selskapet ) fremlegger erklæring ( Erklæringen ) vedrørende fastsettelse av lønn og

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT BOKMÅL Eksamen i: ECON1210 - Forbruker, bedrift og marked Eksamensdag: 26.11.2013 Sensur kunngjøres: 18.12.2013 Tid for eksamen: kl. 14:30-17:30 Oppgavesettet er

Detaljer

Leder i StOr, Anine Klepp. Organisasjonskonsulent, Anette Faane Aasbø

Leder i StOr, Anine Klepp. Organisasjonskonsulent, Anette Faane Aasbø Dato 27. 08. 2015 Tid 12:00 14:00 Sted StOr sitt møterom, Studentenes Hus Innkalt Ikke tilstede av stemmeberettigede Ordstyrer Protokollfører Arbeidsutvalget i StOr Leder i StOr, Anine Klepp Organisasjonskonsulent,

Detaljer

UNIVERSITETET I OSLO

UNIVERSITETET I OSLO UNIVERSITETET I OSLO Det matematisk-naturvitenskapelige fakultet Eksamen i MAT2400 Analyse 1. Eksamensdag: Onsdag 15. juni 2011. Tid for eksamen: 09.00 13.00 Oppgavesettet er på 6 sider. Vedlegg: Tillatte

Detaljer