SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module

Like dokumenter
SafeRing / SafePlus Retrofit of under voltage coil V Module

SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module

SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module

SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module

SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules

Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules

SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism

SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock type EL11AP C, De, F and Sl modules

SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module

Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules

SafeRing / SafePlus Retrofit capacitive voltage indication type VDS C, F, De and V Modules

SafeRing / SafePlus Retrofit of capacitive voltage indication type VPIS C, De, F and V Modules

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

KAMPANJE APK : APK-5: Skifte pakninger mellom turbo og CCDPF

Start Here USB *CC * *CC * USB USB

Mounting the electrically elevating legrest

Replacing the tube and/or tyre of a drive wheel, indoor/outdoor

MONTASJEBESKRIVELSE INSTALLATION GUIDE

Windlass Control Panel

Replacing the batteries

IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM!

Handicare Emineo Ledsagerbrems Basic / Drum brake Basic

HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment)

Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite

Institutt for biovitenskap

Montering av Lian Skyvedør Installation of Lian Sliding Door

MAINTENANCE INSTRUCTION FOR RELEASE HOOK

Replacing the carbon brushes

KAMPANJE APK : APK-8: Bytte bakaksel bolter

Exercise 1: Phase Splitter DC Operation

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

AC10. Brukermanual Brugsanvisning Bruksanvisning User Manual. Spenningsdetektor Voltage Detector. English Norsk

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

Monteringsanvisning. Assembly instructions. Ledsagerbrems / Drum brake. Artikkelnummer/ Item no.

Safety a t t h e f A c t o r y

Independent Inspection

Independent audit av kvalitetssystemet, teknisk seminar november 2014

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Justeringsanvisninger finnes på de to siste sidene.

SERVICE BULLETINE

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

TB-615 / TB-617 Wireless slim keyboard. EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning

Quality audit of aircraft i Part-M og Part-145

JBV DSB godkjenninger

MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE

NÅR FAGKUNNSKAP & KOMPETANSE TELLER BRUKERMANUAL ELIT AC10 SPENNINGSDETEKTOR USER MANUAL ELIT AC10 VOLTAGE DETECTOR. English Norsk

Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter

bondura dual 36 Ø50mm - Ø200mm assembly & inspection manual art rev A

Certificates of Release to Service(CRS)

Utøver går med feil lårnummer (og riktig startnummmer/brikke).

Velkommen om bord i F/F Gunnerus. Welcome on board R/V Gunnerus. Introduksjon F/F Gunnerus

KAMPANJE AZG : Skifte bolter reimhjul

Bruksanvisning Modell I-440 Spesialutgave. for brukere med vekt opp til 200 kg

Monitoring water sources.

EcoNordic. Flexit GO ART.NR , MONTERINGSVEILEDNING Spjeld. MONTERINGANVISNING Spjäll

KROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal.

Roma Garden Art.no: FP-ROMGR-100 Last updated:

Nedfellbar koketopp Brukermanual. Importør: Sunwind Gylling AS postboks 64, 1309 RUD

Du vil trenge: Umbraco Nøkkel (Inkludert); Skiftnøkkel/Fastnøkkel sett (For styrestem bolten og de 4 styreboltene),pumpe

Elektronisk innlevering/electronic solution for submission:

Midnight BBQ Light USER MANUAL

Monteringsanvisning Assembly Instructions Monteringsanvisning. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf:

Endelig ikke-røyker for Kvinner! (Norwegian Edition)

Instruksjons manual Instruction manual

Company name: Åkrehamn Trålbøteri AS

Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis)

NEOREST Hybrid (Toilet bowl) NEOREST Hybrid. Installation manual. Safety Cautions Precaution before installation. Included parts.

Bestille trykk av doktoravhandling Ordering printing of PhD Thesis

Windows Server 2008 Hyper-V, Windows Server 2008 Server Core Installation Notes

bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly

229 SONATA Manual NO_ENG 1.04

Purus Line Vinyl Plus

LUFTDYKTIGHETSP ABUD

Wonderland 904. Regulerbar seng Electrical adjustable bed. my bed - my wonderland

Product Facts. Product code example

Eksamen KVT2002 Elenergi og automatiseringssystem/systemer. Programområde: Kulde- og varmepumpeteknikk. Nynorsk/Bokmål

Elektronisk termostat med spareprogram. Lysende LCD display øverst på ovnen for enkel betjening.

KAMPANJE APK : APK-4: Kontroll montering EGT-2

Instruksjon til politiet for gjennomføring av DNA-test

Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland

Vedlegg 2 Dokumentasjon fra TVM leverandør

EMS 1. Music Streamer. Owner's Manual

Network Multimeter AM-1016 User s Manual

Innholdsfortegnelse... 1 Endringslogg UD BETALINGSTERMINAL NETS NEW DRIVERS FULL SUPPORT WINDOWS

LISTE OVER TILLATTE HJELPEMIDLER EKSAMEN I NOVEMBER OG DESEMBER 2014

OtisMed Imaging Technique: Graphix for Knee MRI PHILIPS, SIEMENS, & TOSHIBA GRAPHIX MRI SCANNERS

RC-P. Fjernkontroll BRUKSANVISNING

Brukerveiledning SafeUse. English version: slide 15

Managing Risk in Critical Railway Applications

kpmg AS Senior revisor

SEMA 203. Rescue Sling Rednings slynge EN 1498 PERSONAL PROTECTION EQUIPMENT (PPE) AGAINST FALLS FROM A HEIGHT 3 INSTRUCTIONS FOR USE AND MAINTENANCE

KAMPANJE AKK : Skifte setetrekk forseter

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

2. Sett pa ny laseplate og skru inn skruene. Merk at skruen under lasebolten er lenger enn de andre. Bruk Locktite 243 pa hver skrue.

GIMOTA AG. Assembly Instructions Dataconnectors D-SUB. Datenstecker Katalog Gimota AG 04/14 3

Trigonometric Substitution

Transkript:

SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-10 BJGU/GUSO Checked NODIS 2008-12-16 MARE Approved NODIS 2008-12-16 OLGR Title SAFERING/SAFEPLUS RETROFIT OF AUXILIARY SWITCH S9 V MODULE Language EN/NO 1/7

General Safety Instructions! - Check that the installation, putting into service and maintenance of this apparatus is carried out by qualified personnel with knowledge of the apparatus to be installed. All the procedures as laid out in this installation and service instruction manual must be known. - To perform the following installation requires a vocational training (electrician, electrical engineer) and some years of experience. - Make sure the standard and legal prescriptions are adhered to during the installation, putting into service and maintenance. All procedures must be carried out in strict compliance to the rules of good working practice and safety at the work site. - Please read this instruction manual and plan the work before starting the installation. - Strictly follow the information given in this instruction manual. - Pay special attention to the danger notes as indicated in this manual by the following symbol: - Check and ensure that the personnel operating the apparatus have the instruction manual at hand, as well as the necessary information for correct installation. - Before starting the retrofit upgrade the switchgear must be deenergized. The switchgear is de-energized by operating the switches to disconnected position. - Check that all mechanism are discharged. If in doubt, close and open the switch. 2/7

Sikkerhetsinstruks! - Sørg for at installasjon, idriftsettelse og vedlikehold er utført av kvalifisert personell som har kjennskap til utstyret som blir installert. Vedkommende må også kjenne til prosedyrer som er beskrevet i dette installasjonsheftet. - For å utføre følgende installasjon kreves yrkesfaglig erfaring som elektriker, elektroingeniør eller liknende. - Sørg for at sikkerheten rundt installasjonsarbeidet er ivaretatt i henhold til nasjonale normer og forskrifter. Arbeidet utføres av en fagperson. - Les manualen nøye før arbeidet påbegynnes. - Utfør installasjonen nøyaktig som beskrevet i denne manualen. - Vær spesielt nøye med å lese og følge anvisninger når det er indikert med fare symbolet: - Sørg for at betjeningspersonell har dette installasjonsheftet og har fått nødvendig informasjon når de betjener det installerte utstyret. - Før installasjonen påbegynnes, sørg for at avgangen det skal jobbes på er strømløs og at bryterne er utkoblet. - Alle fjærer på mekanismene må være avspent. For å forsikre seg om dette kan bryteren lukkes og åpnes. 3/7

Installation procedure not charged charged not charged charged ikke forspent forspent ikke forspent forspent Used untill May 2007 Brukt inntill mai 2007 Existing front covers Dagens frontdeksler 1. Operate the vacuum circuit breaker to open position Betjen effektbryteren til utkoblet stilling 2. Verify that the operating are not charged Kontroller at koblingsfjærene ikke er forspente 3. Unscrew the fixing screws and remove the upper front cover and open the lower front cover Løsne begge festeskruene og fjern det øvre frontdekselet samt åpne det nedre frontdekslet 4/7

2PA mechanism 3PKE mechanism 4. Unscrew the relay trip coil bracket Skru av braketten for reléspolen 5/7

5 Tripping lever, push direction Utløserstag, trykkretning Unlatched position Uspent posisjon Latched position Spent posisjon 5. Press the tripping lever of the relay trip coil in the indicated direction into latched position Press utløserstaget på reléspolen til spent posisjon 6 S9 M4 x 16 6. Fix auxiliary switch S9 (signal for tripped relay) in the rear of the relay trip coil with 2 pieces of M4x16 screws Check that the close-open function of S9 is working properly Fest signalvender S9 (utløst relé) på baksiden av reléspolen med 2 stk M4x16 skruer Sjekk at åpne-lukke funksjonen på S9 fungerer som den skal 6/7

7. Fix the relay trip coil bracket to the 2PA mechanism, removed during step 4 Fest braketten for reléspolen som ble fjernet under punkt 4 IMPORTANT! Fix the wires to avoid any damages from moving parts VIKTIG! Fest alle ledninger slik at skader fra bevegelige deler unngås 8. Re-place and fix the front covers Sett tilbake og fest frontdekslene 7/7