EW-48U Data Sheet. EarthWerks Acoustical Underlayment for Luxury Vinyl Tile (LVT)

Like dokumenter
Smart High-Side Power Switch BTS730

Resesjonsrisiko? Trondheim 7. mars 2019

FIST-FOSC-RSKG -8-NO08

Slope-Intercept Formula

HT - Fiber. HT, fiber. Innholdsfortegnelse. 1 HT, fibersett. 2 Montering av HT. 3 Montering av fiber skjøtebrett. 4 Innføring av fiberkabel

Tap av data og ansvarsbegrensning ved kjøp av hostingtjenester

- Vennlig hilsen gründerne bak retyre

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

FIST-FOSC-RSKG -16-NO08

Bruksanvisning Modell I-440 Spesialutgave. for brukere med vekt opp til 200 kg

Gaute Langeland September 2016

Microsoft Dynamics C5 Version 2008 Oversigt over Microsoft Reporting Services rapporter

25 Monate Garantiebedingungen 25 mois conditions de garantie 25 months warranty conditions

CPWO. M o n t a s j e b e s k r i v e l s e. Hybrid veggboks. Utarbeidet i samarbeide med Telenor. Innholdsfortegnelse

Norges ledende bedrift innen Linux og åpen programvare

ADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ.

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

Sikkert Drillingnettverk på CAT-D Rig

Nærings-PhD i Aker Solutions

Hybrid Terminal. Utarbeidet i samarbeide med Telenor. Innholdsfortegnelse. 1 Hybrid Terminal, sett. 1.2 Fiber skjøtebrett, sett

Verden rundt. Trondheim 5. april 2018

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019

Exercise 1: Phase Splitter DC Operation

Nøtteknekkeren fem år etter

Informasjon om permittering og lønn

SUPPLIER UPDATE. September 23, 2015

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

Bedriftenes møteplass. Thina Margrethe Saltvedt, 02 April 2019

Morgenrapport Norge: Teknologihandelskrig

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

Prisene på Molea AS nettside er oppgitt i norske kroner eks. mva. Prisene oppdateres regelmessig og uten forvarsel.

Liite 2 A. Sulautuvan Yhtiön nykyinen yhtiöjärjestys

Merak Un-glazed Porcelain Wall and Floor Tiles

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

DNB Health Care. Helsesektoren En investors drøm. September Knut Bakkemyr (Forvalter, DNB Health Care)

OtisMed Imaging Technique: Graphix for Knee MRI PHILIPS, SIEMENS, & TOSHIBA GRAPHIX MRI SCANNERS

Yrkesfaglig utvalg for bygg, industri og elektro

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

Owner s Manual Tilt Flat Screen Wall Mount

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

FIST/FOSC-RSKG-1-NO08

Morgenrapport Norge: Trump og Kina avgjør om det blir en stille uke

PSi Apollo. Technical Presentation

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities

Ekstraordinær generalforsamling HAVFISK ASA

LUFTDYKTIGHETSP ABUD

SRP s 4th Nordic Awards Methodology 2018

LEAN Kværner Verdal Konkurransekraft

5. mai 2011 Nordiske formuerettsdager, Oslo

SERVICE BULLETINE

STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD

Morgenrapport Norge: Faller ledighet som en stein igjen?

Roma Garden Art.no: FP-ROMGR-100 Last updated:

Forberedelse til skolebesøk

Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler

5 E Lesson: Solving Monohybrid Punnett Squares with Coding

Kontaktpunkt Nyhamna - Hvordan påvirker den generelle oppdragstørken i leverandørindustrien utviklingen av Kværner lokalt og regionalt?

Statens vegvesen. Godkjenning av StalPro Rail su vegrekkverk. Stalprodukt S.A ul. Wygoda 69, Bochnia. Polen. Dawid Barnaś

Hvorfor hente kapital nå? En forklaring. Oslo 25. mai 2010

På vei mot mindre stimulerende pengepolitikk. Katrine Godding Boye August 2013

Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter

Fremtidens ombordproduksjon. Ari Th. Josefsson FishTech 2014 Ålesund

Svakt internasjonalt, Norge i toppform. 22. november 2012 Steinar Juel sjeføkonom

Elektronisk innlevering/electronic solution for submission:

Renteforventninger. Bjørn Sivertsen SpareBank 1 SR-Markets

Forbedringsarbeid i praksis Motivering og aktivt forbedringsarbeid Trondheim, 26 February 2019 Nils-Arne Figenschau, Project Manager Aker Solutions

Marmi Plus One. Sleek, Essential, Stunning

Norsk sokkel i endring: - Status, fremtid og konkurransekraft. 13. november 2018, LOs olje- og gasskonferanse Karl-Petter Løken, Konsernsjef i Kværner

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa

Endelig ikke-røyker for Kvinner! (Norwegian Edition)

Statens vegvesen. Testene tilfredsstiller kravene til styrkeklasse T3 med en målt arbeidsbredden på 0,7m.

Finansnæringens samfunnsoppgave: Veiviseren

Information search for the research protocol in IIC/IID

Trigonometric Substitution

(Notification of attendance Proxy documents: English version follows below)

DNB Markets Anbefalinger. Kristian Tunaal November 2011

Hvorfor er nordområdene interessante for Aker Solutions?

Risikofokus - også på de områdene du er ekspert

- 1 - Tredjeparts tjenester

Fremtidens trusler hva gjør vi? PwC sine fokusområder innen CyberSikkerhet og hvordan vi jobber inn mot internasjonale standarder

Boligboble fortsatt lave renter? Trondheim 7. mars 2013

Statens vegvesen. Fra VSI test senter: testrapportnummer KIR14003 datert TB32 test av

Midnight BBQ Light USER MANUAL

10. Entire agreement: This agreement is the entire agreement of the parties relating to the measures.

2018 ANNUAL SPONSORSHIP OPPORTUNITIES

Samsvargodkjenning av SP-17 og SP-17M midtrekkverk

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa

Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland

HVILKE ENDRINGER KAN BRANSJEN FORVENTE SEG FREMOVER SETT FRA ET BRUKERPERSPEKTIV CHRISTIAN HEIBERG, EXECUTIVE DIRECTOR CBRE AS NORSK EIENDOM

Hvorfor så bekymret? 2

Energi og bærekraft. Thina Margrethe Saltvedt, Sjefanalytiker Makro/Olje (Ph.

NOTICE OF AN EXTRAORDINARY GENERAL MEETING IN AGRINOS AS INNKALLING TIL EKSTRAORDINÆR GENERALFORSAMLING I AGRINOS AS

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

Utviklingen i finansmarkedene

Rundebordskonferansen Janne Harstad Rasten, Fungerende EVP Prosjektstøtte Kværner 18. juli 2012

part of Aker Aker Solutions MMO Dag Yngve Johnsen Ptil Entreprenørseminar Aker Solutions 2011 Aker Solutions

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015

MID-TERM EXAM TDT4258 MICROCONTROLLER SYSTEM DESIGN. Wednesday 3 th Mars Time:

Transkript:

EW-48U Data Sheet EarthWerks Acoustical Underlayment for Luxury Vinyl Tile (LVT) EarthWerks LVT Flooring Underlayment is a Premium Grade highly engineered, cross-linked polypropylene foam. EarthWerks LVT is the ideal choice for most residential and commercial Luxury Vinyl Tile (LVT) flooring applications. through the floor and footfall noise reduction. The most robust compression characteristics on the market help to insure the integrity of the handle and install in nearly all conditions. installations Product and Packaging Specifications: *will vary depending on specific floor/ceiling assembly For more information about EW LVT Underlayment Adhesive System or any of our other flooring underlayment products, please contact us 1-800-275-7943 or at www.earthwerks.com rev 5.10.12

STATEMENT OF WARRANTY EarthWerks LVT Underlayment Flooring System Statement of Limited Warranty EarthWerks Warrantor, warrants to its immediate purchaser for resale, the Customer, EarthWerks LVT Underlayment flooring adhesives, the Product, (specifically; EW1-F2U and EW1-U2F Adhesive) to be free from defects in material and workmanship for a period of one year from the date of purchase provided the installation has been performed according to the specific recommendations and the instructions furnished by EarthWerks and the flooring manufacturer s installation instructions. (The Instructions are on the Product label and specification sheet, as well as EarthWerks Specification Guide and Adhesive Guide.) These Products are warranted for the installation of EartWerks luxury vinyl tile and plank flooring provided the flooring is installed according to the Product s Instructions and the flooring manufacturer s instructions. The sole responsibility of the Warrantor under this warranty shall be to reimburse the Customer for reasonable costs of labor and materials to either repair or replace, at the Warrantor s option, the affected area(s) of the installed flooring. All areas in which the flooring is to be repaired/replaced under the terms of this warranty must be cleared at the end-user s expense of all equipment, furnishings, partitions, and the like, that may have been installed over the floor-covering subsequent to the original installation. PERFORMANCE OF WARRANTY To obtain a warranty claim form and/or information, call 1-800-979-7943 (Attention: Claims Department). Any claim under this Limited Warranty must include a claim form properly filled out accompanied by a dated proof of purchase or invoice. THIS LIMITED WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS. YOU MAY HAVE OTHER RIGHTS THAT VARY FROM STATE TO STATE. EXCLUSIONS/LIMITATIONS This warranty does not apply if (1) the flooring is found to be manufacturing seconds or trials; (2) the sub floor is found unsuitable by normal and prudent installation practices; (3) the Product is not used according to the Instructions; (4) the installation is not performed following the flooring manufacturer s recommendations and written instructions; (5) damage is the result of acts of nature, flooding, vandalism, damage by animals, damage by plant life, or chemical damage; (6) failure is due to excessive moisture emission in the substrate, greater than 3lbs./1000sf/24 hrs., or excessive moisture exposure to the adhesive or flooring. (Moisture emissions should be determined by using a calcium chloride test); (7) problems develop due to defects in the flooring; (8) problems develop due to misuse or abuse of the flooring or adhesive; (9) the Product used is not recommended for the specific use by the Warrantor; (10) damage is the result of settlement, movement, deflection, warpage, distortion, displacement, or any other failure of the structure. This warranty replaces and excludes other warranties, express or implied. Warrantor specifically disclaims any other warranties, written or verbal, including warranties of merchantability and fitness for a particular purpose. It is solely the responsibility of the third parties such as contractors or the end user to test and determine the suitability of the Product for the intended use and purpose. Warrantor shall not be responsible for determining the compatibility between the Product and vinyl sub floors beyond what is stated in the Instructions. The Warrantor does not assume any risk or any liability regarding such suitability.

The replacement/repair remedy stated in this warranty is the exclusive remedy available to the Customer or any other party. Warrantor will not be liable for any incidental, consequential, or other damages of any kind arising out of or connected to the application, or to any use or misuse of the Product, whether any claim is based upon legal theories of contract, tort, or negligence. This limited warranty will become null and void upon notice from Warrantor if (1) the Customer does not provide the Warrantor written notice within thirty (30) days of the discovery of any alleged deficiency; (2) Warrantor is denied a reasonable opportunity to review and investigate an alleged deficiency; (3) at time of notice Warrantor is due in part or in whole charges for the Product covered under this warranty. This warranty is made to the Customer only and is nontransferable. No one other than an officer of EWFP is authorized to make any revisions or additions as to the liability of the Warrantor under the terms and conditions of this warranty. To the extent permitted by law, this Warranty is exclusive as between Warrantor and Customer and specifically excludes and supersedes any and all other warranties, either expressed or implied, including warranties of merchantability and fitness for a particular purpose. Warrantor s liability, whether in tort or in contract, is limited solely and exclusively to the obligation as specifically undertaken herein, except to the precluded by law, and Warrantor s obligations hereunder shall not include any liability for incidental and/or consequential damages, whether based upon theories of tort or contract. The terms, conditions and obligations created by this Warranty shall be governed by the laws of the state of Texas and any claims arising from this Warranty shall be controlled by Texas law and shall be brought in the Superior Court of Nueces County, Texas, said Court being the exclusive and sole jurisdiction and venue to hear any such claim or claims.

INSTALLATION INSTRUCTIONS INSTALLATION RECOMMENDATIONS: These conditions must be maintained to ensure the long term success and performance of the installation. NOTE: Particleboard and OSB are not recommended underlayments.

TROWEL RECOMMENDATIONS: Underlayment to Substrate: Floor to Underlayment: INSTALLATION INSTRUCTIONS: Do not use a roller heavier than 35lbs. LVT and Vinyl Plank Installation:

NOTES: depth x width x spacing

For Use with Floating LinkWerks Products STEP 1 STEP 2 Step 1: Make sure the sub floor is structurally sound, level and is free of dust and debris. Check for protruding nails and/or defects in the sub floor. If installing over concrete, the concrete must be dry with moisture emission rates that do not exceed 3lbs. per 1000 square feet per 24 hours as measured by the Anhydrous Calcium Chloride Test. Step 2: Start in a corner and begin installing the EarthWerks LVT Underlayment parallel to the wall in the opposite direction as you plan to install the flooring planks. When installing the EarthWerks LVT Underlayment, leave at least 2 going up the wall. STEP 3 STEP 4 Step 3: Roll out the next roll of EarthWerks LVT Underlayment in the same manner, making sure that the seams are butted together. Step 4: If installing the EarthWerks LVT Underlayment on concrete or below grade sub floors, be sure to tape the seams together with 2 tape that meets the moisture vapor transmission rate for this type of installation. For more information about EW LVT Underlayment System or any of our other flooring underlayment products, please contact us 1-800-275-7943 or at w w w. E a r t h W e r k s. c o m. STEP 5 Step 5: Install the flooring per manufacturer s instructions.