Longitude. On 11 March 2017, passenger train 304 collided with an excavator between Bergseng and Lillehammer station.

Størrelse: px
Begynne med side:

Download "Longitude. On 11 March 2017, passenger train 304 collided with an excavator between Bergseng and Lillehammer station."

Transkript

1 -5278 Occurrence Summary What Location Date of occurrence Location name Dallerud Local time 05:30 Latitude Event type Railway vehicle movement events Trains collision Trains collision with an obstacle Longitude Description On 11 March 2017, passenger train 304 collided with an excavator between Bergseng and Lillehammer station. The excavator was carrying out maintenance work in the area on assignment for Bane R SF. The driver managed to jump out of the machine seconds before the collision. The passenger train was being driven in accordance with the line speed on the section. When noticing the obstruction on the track, the train driver applied the emergency brake. After the collision, the excavator was pushed close to 150 metres along the track. There was damage to the front of the train, the infrastructure and extensive damage to the excavator. Parts of the Dovrebanen line were closed for over six hours due to the accident. Direct Cause descrip Havarikommisjonen mener det var flere faktorer som bidro til denne hendelsen, blant annet arbeidsform, nattarbeid, uklar kommunikasjon og manglende bruk av kontaktmagneter. Final Report Other Attachments Nam Desc Type Size Last Orga Repo Nam Desc Type Size Last Orga Repo 2017 Final PDF /1-08 repor File 546 3/20 Dalle t 18 rud.p 1:35: df 53 PM 0 ERAIL-REP PUBLIC 1 Friday, August 30, 2019

2 -5278 What Title Trains collision with an obstacle, , Dallerud () Occurrence type Railway vehicle movement events Trains collision Trains collision with an obstacle Occurrence Class Accident Date of occurrence Local time 05:30 Events Railway vehicle movement events - Trains collision - Trains collision with an obstacle Descriptions Language English Translation provider Information providers own translation Description On 11 March 2017, passenger train 304 collided with an excavator between Bergseng and Lillehammer station. The excavator was carrying out maintenance work in the area on assignment for Bane R SF. The driver managed to jump out of the machine seconds before the collision. The passenger train was being driven in accordance with the line speed on the section. When noticing the obstruction on the track, the train driver applied the emergency brake. After the collision, the excavator was pushed close to 150 metres along the track. There was damage to the front of the train, the infrastructure and extensive damage to the excavator. Parts of the Dovrebanen line were closed for over six hours due to the accident. Language Norwegian Translation provider Original version Description Den 11. mars 2017 kolliderte persontog 304 med en gravemaskin mellom Bergseng og Lillehammer stasjon. Gravemaskinen utførte vedlikeholdsarbeider i området på oppdrag for Bane R SF. Føreren rakk å hoppe ut av maskinen sekunder før sammenstøtet. Persontoget ble fremført i henhold til linjehastigheten på stedet. Da føreren oppdaget hindringen i sporet, tilsatte vedkommende nødbrems. Gravemaskinen ble skjøvet nærmere 150 meter langs sporet etter sammenstøtet. Det oppsto skader i fronten av toget, skader på infrastrukturen og store skader på gravemaskinen. Deler av Dovrebanen var stengt i mer enn 6 timer. ERAIL-REP PUBLIC 2 Friday, August 30, 2019

3 -5278 Location name Dallerud Railway System type Railway Country Location type Line Border Country Line type Single track Line number Allowed line speed Km number Latitude Longitude Location description Additional location in Location type details Fixed installations Occurrence details Railway vehicles Movement type Regional passenger train Train number RU Train speed at mom Vehicle description NSB AS Other objects involved in the occurrence Other objects Parties involved IM Involved - Bane R SF RU Wagons overturned Passengers onboard - NSB AS Passengers Staff Level crossing users Unauthorised persons Others Total Fatalities Serious injuries Minor injuries Material consequences Material Damage Estimated total mate < 1500 Damage description Images ERAIL-REP PUBLIC 3 Friday, August 30, 2019

4 -5278 JB - webinfo image/jpeg /15/ jpg 12:26:46 PM JB - webinfo image/jpeg /15/ jpg 12:26:56 PM Causation Causes Language Norwegian Translation provider Original version Direct Cause description Havarikommisjonen mener det var flere faktorer som bidro til denne hendelsen, blant annet arbeidsform, nattarbeid, uklar kommunikasjon og manglende bruk av kontaktmagneter. Underlying and root causes description Language English Translation provider Information providers own translation Direct Cause description The (AIBN) is of the opinion that several factors contributed to this incident, including the work method, night work, unclear communication and failure to use contact magnets. Underlying and root causes description Causation classification Railway vehicle movement events - Trains collision - Trains collision with an obstacle Recommendations Recommendation Issuing information Recommendation title Access to tracks for work Recommendation REC End implementer IM Status Sent to adressee Addressee Issue date Recommendation texts Language Norwegian Translation provider Original version ERAIL-REP PUBLIC 4 Friday, August 30, 2019

5 -5278 Recommendations text Sikkerhetstilråding JB nr. 2017/08T Den 11. mars 2017 kl kolliderte et persontog med en gravemaskin som utførte arbeider for Bane R SF, sør for Lillehammer stasjon på Dovrebanen. Arbeidet ble gjort nattestid, fordelt på flere disponeringer mellom ordinær toggang. Arbeidsformen innebærer stor variasjon i aktivitetsnivå, som igjen kan påvirke årvåkenhet og risiko for feilhandlinger. Statens havarikommisjon for transport tilrår Statens jernbanetilsyn å be Bane R SF risikovurdere disponering som arbeidsform, for å øke sikkerheten ved arbeider som medfører stor variasjon i aktivitetsnivå. Language English Translation provider Information providers own translation Recommendations text Safety recommendation JB No 2017/08T At on Saturday 11 March 2017, a passenger train collided with a road-rail excavator that was carrying out work for Bane R SF south of Lillehammer station on the Dovrebanen line. The work was carried out during the night, broken down into several short track possessions in between ordinary train operations. This work method involves great variations in the level of activity, which can in turn have a bearing on the workers' alertness and on the risk of errors. The recommends that the Norwegian Railway Authority request Bane R SF to conduct a risk assessment of track possessions as a work method in order to improve the safety of work involving great variations in level of activity. Implementation information Implementation status Implementation date NSA Response NIB Comment Causation links Railway vehicle movement events - Trains collision - Trains collision with an obstacle Investigation details Legal Basis Other reason descrip National rules imposed by implementing of the Safety Directive 2004/49/EC - in light of Article 19, 2 of SD - (a) the seriousness of the accident or incident National investigatio Occurrence creation :23:47 Investigator in charge AGR ERAIL-REP PUBLIC 5 Friday, August 30, 2019

6 -5278 Decision to investigate Declaration date Date of IM/RU notific Report Type Final report Workflow Status Validated Report Version 4 Investigation Status Closed Other Attachments Name Descriptio Type Size Last Organizati Repositor 0 Final Report Name Descriptio Type Size Last Organizati Repositor Final PDF File /13/201 Dallerud.p report 8 1:35:53 df PM ERAIL-REP PUBLIC 6 Friday, August 30, 2019

Date of occurrence Location name Fauske station. Longitude

Date of occurrence Location name Fauske station. Longitude Occurrence Summary What Location Date of occurrence 30-03-16 Location name Fauske station Local time Event type Railway vehicle movement events Level crossing event Level crossing accident Latitude Longitude

Detaljer

Date of occurrence 06-01-15 Location name Atna station Local time 00:00 Latitude. Longitude

Date of occurrence 06-01-15 Location name Atna station Local time 00:00 Latitude. Longitude Occurrence Summary What Location Date of occurrence 06-01-15 Location name Atna station Local time 00:00 Latitude Event type Infrastructure events Wrong-side signalling failure Longitude Description ERAIL-REP

Detaljer

RAPPORT ENGLISH SUMMARY INCLUDED

RAPPORT ENGLISH SUMMARY INCLUDED RAPPORT ENGLISH SUMMARY INCLUDED Statens Havarikommisjon for Transport Postboks 213 2001 Lillestrøm Telefon: 63 89 63 00 Faks: 63 89 63 01 http://www.aibn.no E-post: post@aibn.no Avgitt dato: 26.04.2007

Detaljer

Monitoring water sources.

Monitoring water sources. Monitoring water sources. Generell Informasjon Versjon 2 Url http://com.mercell.com/permalink/38336681.aspx Ekstern anbuds ID 223314-2013 Konkurranse type: Tildeling Dokument type Kontraktstildeling Prosedyre

Detaljer

Independent Inspection

Independent Inspection Independent Inspection Odd Ivar Johnsen Vidar Nystad Independent Inspection Mål: Felles forståelse og utøvelse av "Independent Inspection" i forbindelse med "Critical Maintenance Task". Independent Inspection

Detaljer

Økonomisk analyse av ITS-baserte trafikksikkerhetsteknologier: en eksplorerende studie

Økonomisk analyse av ITS-baserte trafikksikkerhetsteknologier: en eksplorerende studie Økonomisk analyse av ITS-baserte trafikksikkerhetsteknologier: en eksplorerende studie Basert på EU-prosjektet IN-SAFETY ITS-fagdag, Oslo 12. april 2010 Jeg skal si litt om følgende: Det finnes foreløpig

Detaljer

Software applications developed for the maritime service at the Danish Meteorological Institute

Software applications developed for the maritime service at the Danish Meteorological Institute Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological

Detaljer

Information search for the research protocol in IIC/IID

Information search for the research protocol in IIC/IID Information search for the research protocol in IIC/IID 1 Medical Library, 2013 Library services for students working with the research protocol and thesis (hovedoppgaven) Open library courses: http://www.ntnu.no/ub/fagside/medisin/medbiblkurs

Detaljer

Bestille trykk av doktoravhandling Ordering printing of PhD Thesis

Bestille trykk av doktoravhandling Ordering printing of PhD Thesis Bestille trykk av doktoravhandling Ordering printing of PhD Thesis Brukermanual / User manual Skipnes Kommunikasjon ntnu.skipnes.no PhD Thesis NTNU LOG IN NOR: Gå inn på siden ntnu.skipnes-wtp.no, eller

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER

Detaljer

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Existing Relay-based Interlocking System Upgrades (NSI-63) Jostein Heimark Project Manager Signalling Innhold Introduksjon

Detaljer

RAPPORT OM ALVORLIG JERNBANEHENDELSE SØRLANDSBANEN EVJA PLANOVERGANG DEN 22. AUGUST 2012 TOG 521

RAPPORT OM ALVORLIG JERNBANEHENDELSE SØRLANDSBANEN EVJA PLANOVERGANG DEN 22. AUGUST 2012 TOG 521 Avgitt juni 2013 RAPPORT JB 2013/05 RAPPORT OM ALVORLIG JERNBANEHENDELSE SØRLANDSBANEN EVJA PLANOVERGANG DEN 22. AUGUST 2012 TOG 521 Statens havarikommisjon for transport (SHT) har utarbeidet denne rapporten

Detaljer

Residency at Arts Printing House for Performing Artists

Residency at Arts Printing House for Performing Artists Bergen - Vilnius Residency at Arts Printing House for Performing Artists It should be noted that according to Norwegian law (Offentleglova 3) that applications for grants, including any attachments, is

Detaljer

HOW TO GET TO TØI By subway (T-bane) By tram By bus By car Fra flyplassen

HOW TO GET TO TØI By subway (T-bane) By tram By bus By car Fra flyplassen HOW TO GET TO TØI TØI s offices are located on the 5th and 6th floors of the CIENS building in the Oslo Research Park (Forskningsparken). We recommend that one uses the subway (T-bane), tram or bus to

Detaljer

Norwegian FAOS, version LK1.0

Norwegian FAOS, version LK1.0 Norwegian FAOS, version LK1.0 The KOOS form was translated from Swedish into Norwegian by the Norwegian Arthroplasty Register (NAR). The Norwegian National Knee Ligament Registry (NKLR) translated the

Detaljer

Elektronisk innlevering/electronic solution for submission:

Elektronisk innlevering/electronic solution for submission: VIKINGTIDSMUSEET Plan- og designkonkurranse/design competition Elektronisk innlevering/electronic solution for submission: Det benyttes en egen elektronisk løsning for innlevering (Byggeweb Anbud). Dette

Detaljer

TJENESTEAVTALER FOR OFFENTLIG DOKUMENTASJONSFORVALTNING

TJENESTEAVTALER FOR OFFENTLIG DOKUMENTASJONSFORVALTNING TJENESTEAVTALER FOR OFFENTLIG DOKUMENTASJONSFORVALTNING MED PERSPEKTIVER FRA NORGES BANK OG NA S TJENESTEAVTALETURNÉ 2018 André Neergaard Andre.neergaard@norges-bank.no Agenda Hva er en tjenesteavtale

Detaljer

Network Statement 2017

Network Statement 2017 VEDLEGG 1.3 Rettslig forankring VEDLEGG / ANNEX: 3.3.2.2.1 3.3.2.2.1 Aksellast Axle Load Gyldighetsperiode: 11. desember 2016 9. desember 2017 Validity Period: 11 December 2016 9 December 2017 Jernbaneverket

Detaljer

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 «Den nye læreboka for FM» Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 Kvalitetsverktøy i utvikling og forandring Krav - kapittel 4 til

Detaljer

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo,

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo, Den europeiske byggenæringen blir digital hva skjer i Europa? Steen Sunesen Oslo, 30.04.2019 Agenda 1. 2. CEN-veileder til ISO 19650 del 1 og 2 3. EFCA Guide Oppdragsgivers krav til BIMleveranser og prosess.

Detaljer

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Vigdis Bjørlo 2016-02-05 Suppliers' obligations in relation to the Construction Client Regulations

Detaljer

1 BANESTRØMFORSYNING TOGVARMEANLEGG KONTAKTLEDNINGSANLEGG... 5

1 BANESTRØMFORSYNING TOGVARMEANLEGG KONTAKTLEDNINGSANLEGG... 5 Infrastruktur Elkraft / Energy Side / Page: 1 av/of 5 1 BANESTRØMFORSYNING... 3 2 TOGVARMEANLEGG...4 3 KONTAKTLEDNINGSANLEGG... 5 Infrastruktur Elkraft / Energy Side / Page: 2 av/of 5 1... 3 TRACTION POWER

Detaljer

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Nordisk Adressemøte / Nordic Address Forum, Stockholm 9-10 May 2017 Elin Strandheim,

Detaljer

Gjermund Vidhammer Avdelingsleder Governance, risk & compliance

Gjermund Vidhammer Avdelingsleder Governance, risk & compliance VEIEN TIL GDPR: PLANLEGG DINE NESTE 12 MÅNEDER Gjermund Vidhammer Avdelingsleder Governance, risk & compliance Agenda Hvordan påvirker GDPR arbeid med informasjonssikkerhet Etterlevelse: plan for de neste

Detaljer

Vehicle Fires in Norwegian Road Tunnels

Vehicle Fires in Norwegian Road Tunnels Vehicle Fires in Norwegian Road Tunnels 2008-2015 Harald Buvik Tunnel and Materials Technology Section Traffic Safety, Environment and Technology Department Background: Norway is one of the countries that

Detaljer

Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko)

Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko) Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko) Erik Hamremoen Manager Flight Safety - Statoil Aktivitetsomfang innen olje- og gass sektoren Globalt

Detaljer

EMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post:

EMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post: EMPIC MEDICAL Etterutdanningskurs flyleger 21. april 2017 Lars (Lasse) Holm Prosjektleder Telefon: +47 976 90 799 E-post: Lrh@caa.no it-vakt@caa.no Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50

Detaljer

Improvement in HSE / Operational Performance

Improvement in HSE / Operational Performance Improvement in HSE / Operational Performance Statoil Marine Operations Classification: Internal Experience from improvement activities Started in 2/21 Due to negative trend i period late 9 s, actions were

Detaljer

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B. Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /

Detaljer

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015 1 PETROLEUM PRICE BO ARD Our reference Date OED 15/712 15/06/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland

Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland Statens vegvesen Linetech GmbH & Co. KG Von-Hünefeld-Straße 99 50829 Köln Tyskland Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /

Detaljer

SMARTE BILER. 24. august 2018

SMARTE BILER. 24. august 2018 24. august 2018 2 Selvkjørende biler er ikke en ny tanke De første ideene spores tilbake til 1930-tallet. Første teknisk fungerende selvkjørende biler kom på 50-tallet Da spådde GM at dette var på plass

Detaljer

KAPITTEL S - SIKKERHET

KAPITTEL S - SIKKERHET KAPITTEL S - SIKKERHET JAR-OPS 1.1235 Sikkerhetskrav Et luftfartsforetak skal sikre at alt berørt personell har kunnskap om og tilfredsstiller de relevante kravene i de nasjonale sikkerhetsprogrammene

Detaljer

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B. Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /

Detaljer

Kartleggingsskjema / Survey

Kartleggingsskjema / Survey Kartleggingsskjema / Survey 1. Informasjon om opphold i Norge / Information on resident permit in Norway Hvilken oppholdstillatelse har du i Norge? / What residence permit do you have in Norway? YES No

Detaljer

Søker du ikke om nytt frikort/skattekort, vil du bli trukket 15 prosent av utbetalingen av pensjon eller uføreytelse fra og med januar 2016.

Søker du ikke om nytt frikort/skattekort, vil du bli trukket 15 prosent av utbetalingen av pensjon eller uføreytelse fra og med januar 2016. Skatteetaten Saksbehandler Deres dato Vår dato 26.10.2016 Telefon Deres Vår referanse For information in English see page 3 Skattekort for 2016 Du fikk helt eller delvis skattefritak ved likningen for

Detaljer

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort.

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort. Skatteetaten Saksbehandler Deres dato Vår dato 28.10.2011 Telefon Deres Vår referanse For information in English see page 3 Skattekort for 2012 Du fikk helt eller delvis skattefritak ved likningen for

Detaljer

Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite

Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite Art.nr. 05-900-573-00. Page 1 of 9 Norsk Monteringsanvisning taksokkel Denne monteringsmanualen

Detaljer

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared

Detaljer

Exercise 1: Phase Splitter DC Operation

Exercise 1: Phase Splitter DC Operation Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your

Detaljer

Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com

Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com Et treårig Interreg-prosjekt som skal bidra til økt bruk av fornybare drivstoff til persontransporten. greendriveregion.com Mål Målet i Green Drive Region er at 10 % av alle personbiler i Indre Skandinavia

Detaljer

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3 Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene

Detaljer

Network Statement 2017

Network Statement 2017 VEDLEGG 1.3 Rettslig forankring VEDLEGG / ANNEX: 3.6.3.2 Network Statement 2017 3.6.3.2 Driftsbanegårder Marshalling Yards Gyldighetsperiode: 11. desember 2016 9. desember 2017 Validity Period: 11 December

Detaljer

Vi gir råd hvem lytter ESRA Skinnegående Forum

Vi gir råd hvem lytter ESRA Skinnegående Forum Vi gir råd hvem lytter ESRA Skinnegående Forum Terje Nilsen Sjefingeniør Scandpower AS 10 November 2011 Konsulentens plass og rolle i bransjen Andre industrier/bransjer Myndighet Konsulenten Infrastruktur

Detaljer

Certificates of Release to Service(CRS)

Certificates of Release to Service(CRS) Certificates of Release to Service(CRS) Ørjan Bjørnstrøm CAA-N 28.Januar 2019 Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50 05 postmottak@caa.no Postadresse: Postboks 243 8001 BODØ Besøksadresse:

Detaljer

Hvordan kvalitetssikre åpne tidsskrift?

Hvordan kvalitetssikre åpne tidsskrift? Hvordan kvalitetssikre åpne tidsskrift? Innlegg ved Halvdagsseminar om åpen tilgang til vitenskapelige artikler I forbindelse med den internasjonale Open Access-uken, Universitetsbiblioteket i Bergen 26.

Detaljer

EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering

EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering Kari Heimholt EFPIA Implementation Lead, Sverige, Finland & Norge Pfizer AS 3 mai 2016 Building trust and earning greater respect

Detaljer

SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module

SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS

Detaljer

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør

Detaljer

Examples and experience from restorations along Tana river on the norwegian side. Knut Aune Hoseth Head of northern region

Examples and experience from restorations along Tana river on the norwegian side. Knut Aune Hoseth Head of northern region Examples and experience from restorations along Tana river on the norwegian side Knut Aune Hoseth Head of northern region Mapping of migration barriers 1998-2000 Interreg project Better understanding of

Detaljer

SAS FANS NYTT & NYTTIG FRA VERKTØYKASSA TIL SAS 4. MARS 2014, MIKKEL SØRHEIM

SAS FANS NYTT & NYTTIG FRA VERKTØYKASSA TIL SAS 4. MARS 2014, MIKKEL SØRHEIM SAS FANS NYTT & NYTTIG FRA VERKTØYKASSA TIL SAS 4. MARS 2014, MIKKEL SØRHEIM 2 TEMA 1 MULTIPROSESSERING MED DATASTEGET Multiprosessering har lenge vært et tema i SAS Stadig ny funksjonalitet er med på

Detaljer

THE NOMINATION COMMITTEE S RECOMMENDATIONS TO THE ANNUAL GENERAL MEETING 2018

THE NOMINATION COMMITTEE S RECOMMENDATIONS TO THE ANNUAL GENERAL MEETING 2018 English office translation. In case of conflict the Norwegian version shall prevail. VALGKOMITEENS INNSTILLING TIL ORDINÆR GENERALFORSAMLING 2018 THE NOMINATION COMMITTEE S RECOMMENDATIONS TO THE ANNUAL

Detaljer

RAPPORT OM JERNBANEULYKKE, AKER STASJON, HOVEDBANEN 10. MARS 2015 TOG NR. 7224

RAPPORT OM JERNBANEULYKKE, AKER STASJON, HOVEDBANEN 10. MARS 2015 TOG NR. 7224 Avgitt mars 2016 RAPPORT JB 2016/03 RAPPORT OM JERNBANEULYKKE, AKER STASJON, HOVEDBANEN 10. MARS 2015 TOG NR. 7224 English summary included Statens havarikommisjon for transport (SHT) har utarbeidet denne

Detaljer

APPLICATION FOR ADMISSION TO UPPER SECONDARY EDUCATION FOR SPEAKERS OF MINORITY LANGUAGES RECENTLY ARRIVED IN NORWAY

APPLICATION FOR ADMISSION TO UPPER SECONDARY EDUCATION FOR SPEAKERS OF MINORITY LANGUAGES RECENTLY ARRIVED IN NORWAY 5 APPLICATION FOR ADMISSION TO UPPER SECONDARY EDUCATION FOR SPEAKERS OF MINORITY LANGUAGES RECENTLY ARRIVED IN NORWAY 2017-2018 About this form - This is an application form for admission to upper secondary

Detaljer

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau.

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau. CAMES Overskrift 27pt i to eller flere linjer Technical Skills Leizl Joy Nayahangan, RN, MHCM Leizl.joy.nayahangan@regionh.dk IMPORTANCE Challenges Brødtekst 22pt of patient skrives her care Increasing

Detaljer

Statens vegvesen. Godkjenning av StalPro Rail su vegrekkverk. Stalprodukt S.A ul. Wygoda 69, Bochnia. Polen. Dawid Barnaś

Statens vegvesen. Godkjenning av StalPro Rail su vegrekkverk. Stalprodukt S.A ul. Wygoda 69, Bochnia. Polen. Dawid Barnaś Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /

Detaljer

STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD

STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD 1 Bakgrunnen for dette initiativet fra SEF, er ønsket om å gjøre arbeid i høyden tryggere / sikrere. Både for stillasmontører og brukere av stillaser. 2 Reviderte

Detaljer

What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles?

What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles? What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles? I preciate to get the invitation to participate at this convention and give the Norwegian

Detaljer

Prosjekt Nye tog November 2010

Prosjekt Nye tog November 2010 Prosjekt Nye tog November 2010 Status Simulator og Mock-up blir installert på NSB Kompetansesenter innen utgangen av november 2010, Transurb Technirail er underleverandør. Mottaksbase / Verksted blir ferdigstilt

Detaljer

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION 2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm

Detaljer

Managing Risk in Critical Railway Applications

Managing Risk in Critical Railway Applications Managing Risk in Critical Railway Applications Topics Railway signalling Real projects Regulator, standards and the law Acceptance criteria for signalling systems (SIL) Risk analysis a special case The

Detaljer

RAPPORT OM SAMMENSTØT MELLOM TOG OG SKINNEGÅENDE GRAVEMASKIN VED DALLERUD PÅ DOVREBANEN 11. MARS 2017

RAPPORT OM SAMMENSTØT MELLOM TOG OG SKINNEGÅENDE GRAVEMASKIN VED DALLERUD PÅ DOVREBANEN 11. MARS 2017 Avgitt desember 2017 RAPPORT JB 2017/08 RAPPORT OM SAMMENSTØT MELLOM TOG OG SKINNEGÅENDE GRAVEMASKIN VED DALLERUD PÅ DOVREBANEN 11. MARS 2017 English summary included Statens havarikommisjon for transport

Detaljer

EMNERAPPORT INSTITUTT FOR BIOMEDISIN

EMNERAPPORT INSTITUTT FOR BIOMEDISIN EMNERAPPORT INSTITUTT FOR BIOMEDISIN ANNUAL EVALUATION REPORT DEPARTMENT OF BIOMEDICINE Emnekode: COURSE CODE: Emnenavn: COURSE NAME: Emneansvarlig: COURSE COORDINATOR: Rapporteringsdato: DATE OF REPORT:

Detaljer

AVVIKSBEHANDLING No. of Sheets: 7

AVVIKSBEHANDLING No. of Sheets: 7 For access or copy of document, please contact: hilde.lillegraven@pgs.com This document can be updated by: Stein Fines, stein.fines@pertra.no 02 20021023 Issued for Use S. Fines O.A. Isdal E. Haugane 01

Detaljer

Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis)

Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis) Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis) 1. Gå til print i dokumentet deres (Det anbefales å bruke InDesign til forberedning for print) 2. Velg deretter print

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING E-postmaler til bruk ved utsendelse av fremdriftsrapportering ph.d.- kandidater og veiledere TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: Kjære

Detaljer

Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs)

Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs) Department of (Biology) Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs) Academic contact during examination: Thorsten Hamann Phone: 91825937 Examination date: 19.12.2016 Examination

Detaljer

Camilla Iversen åpnet generalforsamlingen redegjorde for fremmøtet. Camilla Iversen opened the general meeting and informed about the attendance.

Camilla Iversen åpnet generalforsamlingen redegjorde for fremmøtet. Camilla Iversen opened the general meeting and informed about the attendance. (Unofficial translation. The official language of these minutes is Norwegian. In the event of any discrepancies between the Norwegian and English text, the Norwegian text shall precede.) PROTOKOLL FOR

Detaljer

Oppfølging av etiske krav: Eksempel Helse Sør-Øst

Oppfølging av etiske krav: Eksempel Helse Sør-Øst Oppfølging av etiske krav: Eksempel Helse Sør-Øst Sauda, 21. september 2011 Grete Solli, spesialrådgiver, Helse Sør-Øst Magne Paulsrud, seniorrådgiver, Initiativ for etisk handel Helse Sør-Øst: nye etiske

Detaljer

INDIAN HILLS PROFESSIONAL BUILDING

INDIAN HILLS PROFESSIONAL BUILDING OFFICE FOR LEASE: INDIAN HILLS PROFESSIONAL BUILDING 220 N 89 th Street Omaha, Nebraska $17.50 psf Full Service 1,109-4,874 SF HIGHLIGHTS Great office building in a central location off of 90 th & Dodge.

Detaljer

The North-South Corridor - showing progress

The North-South Corridor - showing progress The North-South Corridor - showing progress Euro-Asian Transport Links Expert Group meeting Tashkent, Uzbekistan November 1-3.2010 Stig Nerdal, Senior Adviser, UIC The initial founders of The International

Detaljer

EN Skriving for kommunikasjon og tenkning

EN Skriving for kommunikasjon og tenkning EN-435 1 Skriving for kommunikasjon og tenkning Oppgaver Oppgavetype Vurdering 1 EN-435 16/12-15 Introduction Flervalg Automatisk poengsum 2 EN-435 16/12-15 Task 1 Skriveoppgave Manuell poengsum 3 EN-435

Detaljer

Fellesprosjekt: gruppe 214

Fellesprosjekt: gruppe 214 Fellesprosjekt: gruppe 214 Innholdsliste Use case diagrammer...3 Scenario 1 - Registrere prosjekt...3 Scenario 2 - Registrere erfaringer...4 Scenario 3, 4, 5 - Lese og kommentere erfaringer...5 Klassediagram...6

Detaljer

Island Offshore Management

Island Offshore Management Island Offshore Management IKM FOSNAVÅG 06.05.15 Trond Hauge BusineBusiness Areas Island Offshore 29 vesseld IOffshore LOGISTICS & SUPPLY INCREASED OIL RECOVERY AHTS SUBSEA I&M 16 vessels 3 on order -

Detaljer

JBV DSB godkjenninger

JBV DSB godkjenninger JBV DSB godkjenninger Leverandørmøte 2015-02-03 Willy Karlsen Sakkyndig driftsleder Electrical operation manager Eier av JBVs elektriske anlegg Alle jernbaneverkets elektriske anlegg er delt opp på de

Detaljer

Søknadsskjema Strategiske Partnerskap. Anne Kloster Holst Seniorrådgiver SIU Oslo

Søknadsskjema Strategiske Partnerskap. Anne Kloster Holst Seniorrådgiver SIU Oslo Søknadsskjema Strategiske Partnerskap Anne Kloster Holst Seniorrådgiver SIU Oslo 29. 1.2016 Hva skal beskrives i søknaden? A. General Information B. Context C. Priorities D. Participating Organisations

Detaljer

The Follo Line Project

The Follo Line Project The Follo Line Project A presentation: Norway`s largest transport project LONGEST. URBAN. COMPLEX. FASTER. Background NEXT PHASE IN PLANNING Studies prior to public planning Municipal master plan Area

Detaljer

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward C13 Kokstad Svar på spørsmål til kvalifikasjonsfasen Answers to question in the pre-qualification phase For English: See page 4 and forward Norsk Innhold 1. Innledning... 2 2. Spørsmål mottatt per 28.11.12...

Detaljer

PETROLEUM PRICE BOARD

PETROLEUM PRICE BOARD 1 PETROLEUM PRICE BOARD Our reference Date OED 15/712 21/09/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers

Detaljer

Søker du ikke om nytt frikort, vil du bli trukket 15 prosent av din pensjonsutbetaling fra og med januar 2014.

Søker du ikke om nytt frikort, vil du bli trukket 15 prosent av din pensjonsutbetaling fra og med januar 2014. Skatteetaten Saksbehandler Deres dato Vår dato 31.10.2013 Telefon Deres referanse Vår referanse For information in English see page 3 Skattekort for 2014 Du fikk helt eller delvis skattefritak ved likningen

Detaljer

SRP s 4th Nordic Awards Methodology 2018

SRP s 4th Nordic Awards Methodology 2018 SRP s 4th Nordic Awards Methodology 2018 Stockholm 13 September 2018 Awards Methodology 2018 The methodology outlines the criteria by which SRP judges the activity of Manufacturers, Providers and Service

Detaljer

Bærekraftig FM til tiden/ Bærekraftig FM på tid

Bærekraftig FM til tiden/ Bærekraftig FM på tid Downloaded from orbit.dtu.dk on: Sep 28, 2019 Bærekraftig FM til tiden/ Bærekraftig FM på tid Nielsen, Susanne Balslev Publication date: 2015 Document Version Peer reviewed version Link back to DTU Orbit

Detaljer

Arbeidet i en working group. Charlotte Grøntved

Arbeidet i en working group. Charlotte Grøntved Arbeidet i en working group Charlotte Grøntved Agenda 1. Min bakgrunn 2. ERA WG SafeCert Oppgaver, arbeidsmetode, status 3. Arbeidet i gruppen 4. Lidt om det nye som kommer Bakgrunn Desember 2008: Statens

Detaljer

Manuelle kontra automatiske bomstasjoner. (trafikksikkerhet, økonomi, etc)

Manuelle kontra automatiske bomstasjoner. (trafikksikkerhet, økonomi, etc) Manuelle kontra automatiske bomstasjoner (trafikksikkerhet, økonomi, etc) Innlegg ved Kristian Wærsted, Seksjon for trafikkforvaltning, Vegdirektoratet Bompengekonferansen i Trondheim 2010 Disposisjon

Detaljer

1 User guide for the uioletter package

1 User guide for the uioletter package 1 User guide for the uioletter package The uioletter is used almost like the standard LATEX document classes. The main differences are: The letter is placed in a \begin{letter}... \end{letter} environment;

Detaljer

Utstyr for avstandsmåling. Dommersamling 14. mars 2015 Stein Jodal

Utstyr for avstandsmåling. Dommersamling 14. mars 2015 Stein Jodal Utstyr for avstandsmåling Dommersamling 14. mars 2015 Stein Jodal Dommersamlingen 2012 Regulert i R 14-3 Kunstige hjelpemidler, uvanlig utstyr og uvanlig bruk av utstyr Anmerkning: Komiteen kan lage en

Detaljer

Plagiat og PhD: Hva gjør man med det? Kunnskapsløs eller juksemaker? Plagiatsaker 18.09.2009

Plagiat og PhD: Hva gjør man med det? Kunnskapsløs eller juksemaker? Plagiatsaker 18.09.2009 Plagiat og PhD: Hva gjør man med det? Ole Bjørn Rekdal, Høgskolen i Bergen Solstrand 17. sept., 2009 Kunnskapsløs eller juksemaker? Tvilen skal komme tiltalte til gode Hvordan eliminere tvilen? Plagiatprøve?

Detaljer

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6.

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. Administrasjon av postnummersystemet i Norge Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 Postnumrene i Norge ble opprettet 18.3.1968 The postal codes in Norway was established in

Detaljer

Statens vegvesen. Rekkverket har en totalbredde på 0,54m og høyde på 0,90m (uten kantdrager). LT 102 er testet med en lengde på ca. 60m.

Statens vegvesen. Rekkverket har en totalbredde på 0,54m og høyde på 0,90m (uten kantdrager). LT 102 er testet med en lengde på ca. 60m. Statens vegvesen Linetech GmbH & Co. KG Von-Hünefeld-Straße 99 50829 Köln Birgit Schenk Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi

Detaljer

RAPPORT OM AVSPORING AV GODSTOG ETTER SAMMENSTØT MED ENDEBUTT PÅ DALANE STASJON, 31. JANUAR 2010

RAPPORT OM AVSPORING AV GODSTOG ETTER SAMMENSTØT MED ENDEBUTT PÅ DALANE STASJON, 31. JANUAR 2010 Avgitt juli 2010 RAPPORT JB 2010/05 RAPPORT OM AVSPORING AV GODSTOG ETTER SAMMENSTØT MED ENDEBUTT PÅ DALANE STASJON, 31. JANUAR 2010 English summary included Statens havarikommisjon for transport Postboks

Detaljer

EXAM TTM4128 SERVICE AND RESOURCE MANAGEMENT EKSAM I TTM4128 TJENESTE- OG RESSURSADMINISTRASJON

EXAM TTM4128 SERVICE AND RESOURCE MANAGEMENT EKSAM I TTM4128 TJENESTE- OG RESSURSADMINISTRASJON Side 1 av 5 NTNU Norges teknisk-naturvitenskapelige universitet Institutt for telematikk EXAM TTM4128 SERVICE AND RESOURCE MANAGEMENT EKSAM I TTM4128 TJENESTE- OG RESSURSADMINISTRASJON Contact person /

Detaljer

ADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ.

ADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ. ADDENDUM SHAREHOLDERS AGREEMENT by between Aker ASA ( Aker ) Investor Investments Holding AB ( Investor ) SAAB AB (publ.) ( SAAB ) The Kingdom of Norway acting by the Ministry of Trade Industry ( Ministry

Detaljer

Skiskole side 2. Pr. pers. 3 dager/3 days 885 4 dager/4 days NY/NEW 995 5 dager/5 days NY/NEW 1090

Skiskole side 2. Pr. pers. 3 dager/3 days 885 4 dager/4 days NY/NEW 995 5 dager/5 days NY/NEW 1090 Skiskole Side 1 Priser Snowsports Skeikampen vinter 2013/2014. Individuelle gjester. Prices Snowsports Skeikampen winter 2013/2014. Individual guests. Gruppeundervisning, voksne, ungdom og Fjellbandidos

Detaljer

ATO program for Renewal of IR, Class or Type-rating

ATO program for Renewal of IR, Class or Type-rating May be used by the ATO in order to establish an individual training program for renewal of IR, Class or Type-rating in accordance with FCL.625 IR(c)(d) / AMC1 FCL.625(c) and FCL.740(b)(1)(2) / AMC1 FCL.740(b)(1)

Detaljer

Den som gjør godt, er av Gud (Multilingual Edition)

Den som gjør godt, er av Gud (Multilingual Edition) Den som gjør godt, er av Gud (Multilingual Edition) Arne Jordly Click here if your download doesn"t start automatically Den som gjør godt, er av Gud (Multilingual Edition) Arne Jordly Den som gjør godt,

Detaljer

Windlass Control Panel

Windlass Control Panel SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e

Detaljer

Kurskategori 2: Læring og undervisning i et IKT-miljø. vår

Kurskategori 2: Læring og undervisning i et IKT-miljø. vår Kurskategori 2: Læring og undervisning i et IKT-miljø vår Kurs i denne kategorien skal gi pedagogisk og didaktisk kompetanse for å arbeide kritisk og konstruktivt med IKT-baserte, spesielt nettbaserte,

Detaljer

Erfaringer med kollisjoner på norsk sokkel og konsekvensene på regelverket

Erfaringer med kollisjoner på norsk sokkel og konsekvensene på regelverket Erfaringer med kollisjoner på norsk sokkel og konsekvensene på regelverket Arne Kvitrud, Petroleumstilsynet Seminar om kollisjonsrisikoanalyser ESRA, Oslo, 20.11.2013 Innhold Rammeforskriften om maritimt

Detaljer