VALUING MARINE ECOSYSTEM SERVICES PREVENTIVE MEASURES

Størrelse: px
Begynne med side:

Download "VALUING MARINE ECOSYSTEM SERVICES PREVENTIVE MEASURES"

Transkript

1 VALUING MARINE ECOSYSTEM SERVICES LOSS FROM OIL SPILLS FOR USE IN CBA OF PREVENTIVE MEASURES Ståle Navrud, Henrik Lindhjem, Kristin Magnussen and Sofie Skjeflo School of Economics and Business, Norwegian University of Life Sciences and Menon Centre for Environmental and Resource Economics (MERE) Seminar, Oslo, 21. March 2017

2 . Ecosystem services (ES) ES defintion 2006 Millennium Ecosystem Assessment (MA) define ecosystem services as the benefits people obtain from ecosystems ES Valuation in CBA General CBA Manual (DFØ: Veileder i Samfunnsøkonomisk Analyse) Sector specific CBA Manuals (e.g. Veidirektoratet, Kystverket, Jernbaneverket, Miljødirektoratet, NVE) Norwegian ES Committee (NOU 2013:10: Naturens goder: om verdien av øksystemtjenester) Need for monetary (and non-monetary) valuation methods and new studies to better integrate ES impacts in CBA

3 NOU 2013: 10 - Norwegian ES Classification

4 Classification of Marine and Costal Ecosystem Services Supporting services Biodiversity Chemosynthetic primary production Habitat Nutrient cycling Resilience and resistance Water circulation and exchange Provisioning services Carbon sequestration and storage Chemical compounds Construction and shipping space Finfish, shellfish, and marine mammals Minerals, and hydrocarbons Waste disposal sites Regulating services Biological control Gas and climate regulation Waste absorption and detoxification Cultural services Educational and scientific Aesthetic and recreational (Use value) Existence and bequest (Non-use value) (Modified from Armstrong 2012)

5 Which welfare loss are we valuing? Ecosystem services (ES) Temporay loss of ecosystem services Redused damage costs with active restoration Loss of : Use Value (Recreational Use) + Non-use values (Existence & Bequest) ES kloss = Area of interim welfare loss /damage costs (without restoration) Ecosystem services flow with seasonal variations Oil Spill Full recovery Active Restoration Full recovery Natural restoration Time (years) Total Economic Value (TEV) of a small increase in quality or quanity of ES is: individuals willingness-to-pay (WTP) to get the change and still have the same utility (i.e. level of wellbeeing).

6 Environmental Valuation Techniques (Primary Valuation Studies) Indirect Direct Revealed Preferences (RP) Household Production Function (HPF) Approach: - Travel Cost (TC) - Averting Costs (AC) Hedonic Price (HP) analysis Market prices Replacement Costs (RC) Stated Preferences (SP) Choice Experiments Contingent Valuation (CV)

7 Value Transfer (VT) Techniques (Benefit transfer) Defintion VT Transfer economic values (e.g. recreational value per activity day, percentage change in property prices per decibel noise; or Willingness-topay (WTP ) per household) from existing valuation studies (i.e. Study site) to site of decision making e.g. CBA (i.e. Policy site) Spatial and temporal transfer (i.e. from older studies in other locations) VT techniques Unit Value transfer (with or without (income) adjustments) Value function transfer Meta Analysis Delphi Method

8 Use of Contingent Valuation results in CBA Background: A sector-specific CBA manuals being revised to include more non-market unit values for ecosystem services (ES) Project funded by the Norwegian Coastal Administration NCA (Kystverket) (Expert workshop, Focus Groups, 1-to-1 interviews, Soft Launch Internet survey, Pilot study(n=2525 hh), Main Survey (n=5575 hh); many revisions of internet survey in all stages The aim was to provide originalunit estimates of WTP/household) for small, medium, large, and very large ES loss from an oil spill in different regions of Norway; for NCA s CBA Manual for preventive measures; to be used for many years Assess reduced accidents risk from preventive measures and model avoided ES loss (Combine reduced probability of ES loss, Unit value for relevant ES loss size, and number of households in the region affected; in order to calculate total economic benefits) Combine with costs of preventive measure (investment and operating costs, and potential external costs of measure on ES) to calculate Net Present Value of the preventive measure in a CBA

9 Main Challenge in Contingent Valuation of Ecosystem Services (ES) loss Construct a ES loss/damage scenario which is scientifically correct and understandable to the public Damage Function Approach: Oil spill Environmental ES loss impact

10 Damage Table in Pilot Survey

11 5 regional case studies/oil spill sites in Final survey Case North: Tromsø Case Mid: Rørvik Case West: Fedje Case East: Hvaler (Outer Oslo Fjord) Case South: Kristiansand

12 Case: Outer Oslofjord

13 Examples of bird/animal life in the Oslo Fjord

14 Examples of coastal landscapes and recreational activities in the Oslo Fjord

15 With (right) and Without (left) Oil Spill in the Oslo Fjord

16 Examples of ecosystem service damages from previous oil spills in Norway

17 Damage Table - Outer Oslo Fjord Final survey

18 Damage map in Final Survey Outer Oslofjord Spill

19

20

21 Screen shot (Final survey) CV scenario: «Small loss» Outer Oslo Fjord

22 Willingness- to-pay question Payment Card

23 Screen shot (Final survey) CV scenario «Medium loss» Outer Oslo Fjord

24 III After WTP stated for 4 damage levels Results for each respondent presented. Asked whether they would keep or change amounts.

25 Results from Final Survey

26 Number of Respondents and Response rates Region Østlandet Vestlandet Sør-Norge Midt-Norge Nord-Norge Total Utsendinger Kontakt Frafall: Ufullstendig utfylling Svarprosent 46 % 44% 45% 50% 45% 46% Intervju Responsen i en undersøkelse rettet mot et aksesspanel vil avvike fra andre undersøkelsedesign, ettersom respondentene er forhåndsrekrutterte til å delta. Undersøkelsen ble sendt ut til respondenter. Utvalget «oversamples» i utgangspunktet ikke ut over forventet innkomst: Selv om dette vil kunne gi raskere gjennomføring, vil personer som er lett tilgjengelige kunne bli overrepresenterte i utvalget (Tabell 3). Spørreskjemaet ble åpnet av respondenter (57%). Blant disse har 947 ikke returnert fullstendig besvarelse. De respondentene, som har besvart undersøkelsen, utgjør 85% av de kontaktede og 54% av de utsendte skjemaene. Kontaktrate og respons er den samme på tvers av utvalgsområdene. Ettersom undersøkelsen stenges når ønsket antall respondenter er oppnådd, har de sist ankomne respondentene ikke hatt anledning til å delta, og responsen underestimeres i så fall eventuelt i forhold til totalt antall utsendte skjemaer.

27 Percentage Positive WTP, Real zeros and don t knows, and Protest answers 100% 90% 80% 70% 60% 50% 40% Protestsvar Reelle 0-svarere og vet ikke Betalingsvillighet større enn 0 30% 20% 10% 0% Liten skade Middels skade Stor skade Svært stor skade Damage level: Small Medium Large Very Large

28 Why did people state Zero WTP? Husstanden min har ikke råd til å betale for dette Skattenivået er allerede høyt nok 11% 8% 9% 17% Hva jeg sier vil ikke påvirke om tiltakene gjennomføres eller ikke Jeg ville betalt for tiltak i andre kystområder Jeg føler det ikke er riktig å veie miljøet i penger Jeg mener andre samfunnsoppgaver bør prioriteres først Jeg vil ikke betale før jeg vet hva det koster Dagens beredskap er bra nok 25% 7% 4% 4% 0% 7% 1% 0% 2% 1% 2% 1% Det var for vanskelig å komme fram til et beløp Jeg tror ikke det vil skje oljeutslipp i dette kystområdet Jeg stoler ikke på at pengene vil gå til det riktige formålet Jeg mener at penger kan omfordeles eller brukes mer effektivt En engangsskatt er urealistisk og/eller ikke tilstrekkelig Det er rederiene og skipsnæringen som bør betale Andre grunner Usikker/Vet ikke

29 Kroner Mean WTP/household (one-time amount) to avoid different levels of damage/es loss; for te 5 different regions * Protest-0/vet ikke og BV > 5% av husholdningsinntekt tatt ut

30 WTP/Household (One-time aount) when converted into 2 Regions (Northern Norway and The rest of Norway) Liten skade Middels skade Stor skade Svært stor skade Nord-Norge N=664 [624, 807] [876, 1022] [1437, 1647] [2095, 2352] Resten av Norge N=3132 [621, 730] [821, 939] [1160, 1294] [1648, 1842]

31 Calculating total economic benefits Number of affected households (N) is important for aggregate use and non-use values, of ES Total WTP = Mean WTP/household x N How to determine N? - Local, regional, national or global good (e.g. local/regional recreational area vs. national park vs. world heritage site) Most coastal regions are only of regional values

32 Multipied with the number of affected households in region * each county, provides unit prices (Kalkulasjonspriser) for each county (with coastline) that the preventive measures are implemented in. (in Mill NOK) Tiltaksfylke Liten skade Middels skade Stor skade Svært stor skade Østfold Akershus Oslo Buskerud Vestfold Telemark Aust-Agder Vest-Agder Rogaland Hordaland Sogn og Fjordane Møre og Romsdal Sør-Trøndelag Nord-Trøndelag Nordland Troms Finnmark * No. of «affected households» based on dispersion of oil in different regions and respondents answers,

33 Damge/ES loss matrix for finding the ES loss category (small, medium, large or very large) for different volumes of marine diesel, crude oil and bunkers oil; and then the correct unit prices for affected counties. Utslippstype Volum (tonn) Liten Miljøsårbarhet Spredningsradius Moderat Høy Svært høy (buffersone)* (km) Marin diesel Råolje Bunkers Noter: Fargekodene tilsvarer liten (lys gul), middels (mørkere gul), stor (brun/oranjse) og svært stor (rød) miljøskade *Se forklaring i teksten i avsnittet «miljøsårbarhet vurderes innen en spredningsradius

34 Steps in calculating economic benefits of preventive measures

35 POLICY USE: 1) Raise awareness of economic benefits of ES 2) CBA of preventive measures (NCA) CBA of LOVE oil exploration and extraction 3) Environmental accounting (Firm national) 4) Environmental charges 5) Natural Resource Damage Assessments (NDRA) compensation payments oil spills

36

37 Policy use of ES damage cost estimates Cost-benefit analysis (CBA) of projects to improve shipping lanes and other measures to prevent accidents and oil spills; conducted for the Norwegian Coastal Administration Input (unit values) to their CBA manual Other potential uses: Environmental costing to get marginal damage costs of pollution and optimal levels of pollution and optimal taxes Green national accounting ( Green GDP (Gross Domestic Product), i.e. GDP corrected for changes in environmental quality and natural resources Compensation payments after oil spills (Natural Resource Damage Asssessment; NRDA) Optimal management of natural resources (input to bioeconomic modelling)

38 Mean WTP /household/year (for 10 years) for different regions and damage levels (in NOK; 1 NOK = 0.10 PPP-US$) WTP Eastern Norway, spill in Oslofjord 1700 Western Norway, spill north Western Norway, spill south Small loss Medium loss Large loss Very large loss Northern Norway, spill in Lofoten Level of ecosystem service loss

39 Temporal stability Is WTP stable over seasons? YES

40 For the same respondents only (i.e the respondent surveyed both winter and summer)

41 What explains WTP to avoid Small (S), Medium(M), Large (L), Extra Large (XL) loss in ecosystem services from oil spill (Preminary results from final survey) (1) lwtp_s (2) lwtp_m (3) lwtp_l (4) lwtp_xl [1 Log distance from coast, km (-1.86) Have experienced oil spills ** (2.78) *** (4.13) *** (4.33) ** (-2.79) * (2.00) *** (4.90) *** (5.46) Recr. Use of coastal area affected last 12 months Log Household gross incomee Age (years) (0.28) (-1.07) * (-2.04) ** (-2.63) ** * (2.72) (2.15) *** *** (5.08) (5.12) *** *** (6.52) (5.65) (-1.53) * Age squared (0.29) (1.57) (1.85) * (2.15) Female * (2.40) University education (-0.29) Northern Norway (0.32) (0.15) (1.61) Log of minutes used to complete internet survey Respondents used mobile phone/ipad to answer survey Intercept (1.88) (1.74) (-0.38) (1.29) (0.69) (0.80) ** (3.00) (-0.10) * (2.11) (0.87) (-1.98) (-0.08) ** (3.23) (0.05) ** (2.62) (0.27) (1.23) (1.01) (1.30) (0.63) N t statistics * p < 0.05, ** p < 0.01, *** p < 0.001

42 Reasons for positive WTP Non use value Use value Other reasons e.g. I felt I had to pay, I pay for all good (environmental) purposes, I pay out of sympathy with those affected

43 Mean WTP/household/year (for 10 years) to avoid different damage levels in Vestfjorden/Lofoten for households in Northern Norway and a national sample WTP Northern Norway, spill in Lofoten National, spill in Lofoten 900 Small loss Medium loss Large loss Very large loss Level of ecosystem service loss

44 Total Economic Value (TEV) of a small increase in quality or quanity of ES is individuals willingness-to-pay (WTP) to get the change and still have the same utility (i.e. level of wellbeeing): TEV is motivated by: 1) Use Value - Direct Use Value, i.e. i) Consumptive use (e.g. recreational fishing (Cultural service) and commercial fishing (Provisioning Service), and ii) non-consumptive use (e.g. whale watching, nature photography) - Indirect Use Value (e.g. carbon sequestration (Regulatory services) - Option value (i.e. pay to have an option/posibility for use in the future) 2) Non-Use Value - Existence and Bequest values (i.e. preserving the existence of the resource for current and future generations)

45 Contingent Valuation Pilot Survey Internet Panel Survey (by professional survey firm Norstat) Net sample: respondents for Eastern Norway og 402 for two Western Norway (South and North) sites for Northern Norway (Lofoten Islands oil spill) in a National survey (Lofoten Islands oil spill). Response rate: 17,2-20,7%. Low, but average response rate in internet panel surveys; ok for a pilot. Representative sample with regards to sosio-demographics

46 VELFERDSTAP (PÅ SKALA 0-100) AV ULIKE SKADESTØRRELSER Hvis du vurderer skadestørrelsene opp mot hverandre, omtrent hvor stort tap av livskvalitet ville du og din husstand oppleve hvis hver av disse skadene faktisk inntraff? Marker tapet av livskvalitet ved å dra pilen til et tall mellom 0 og 100, hvor 0 er intet tap og 100 er svært stort tap Liten skade Middels skade Stor skade Svært stor skade

47 Damage map Final Survey Northern Norway - Tromsø Oil spill

48 Damage table Final Survey Northern Norway - Tromsø Oil spill

49 Payment Card (Pilot study)

50 Contingent Valuation (CV) Describe change in quantity/quality of environmental good (Scientifically correct, but understandable to the public; and accepted by all stakeholders) Describe program providing the change (Here: Oil spill prevention measures) Realistic and neutral payment vehicle (Here: additional income tax earmarked for these measures ) Willingness-to-pay (WTP) question - open-ended (Payment card) What is the most your household is willing to pay annually as an additional tax? - closed-ended (dichotomous choice) If the program costs X $ annually as additional tax, would your household support the program (vary X over the sample)

51 Kan vi tro på resultatene? Undersøkelsen er konservativt utformet tror våre enhetspriser representerer minsteanslag på velferdstap Folk har fått anledning til å vurdere beløp to ganger (revidere hvis for høyt) Webundersøkelser gir ikke «press» om å «ta i» i svarene Svarene gir konservative anslag på betalingsvillighet, som er godt innenfor anslag fra andre studier BV varierer med div. variable som forventet (eks. inntekt, bruk, tidligere erfaring med utslipp)

52 Hvordan bruke kalkulasjonsprisene?

53 Oljedriftsmodellering MIRA-metodikk For 5 utslippscase, 4 skadenivåer Spørreundersøkelsen gir kroneverdier for å unngå hver av de fire skadenivåene for fem regioner Skade på natur Utslippshendelse Kalkulasjonspriser for fem miljøskadenivåer i alle tiltaksfylker

54 Steps in calculating economic benefits of preventive measures

55 Miljøskadematrise for vurdering av miljøskade og valg av riktig kalkulasjonspris Utslippstype Volum (tonn) Liten Miljøsårbarhet Spredningsradius Moderat Høy Svært høy (buffersone)* (km) Marin diesel Råolje Bunkers Noter: Fargekodene tilsvarer liten (lys gul), middels (mørkere gul), stor (brun/oranjse) og svært stor (rød) miljøskade *Se forklaring i teksten i avsnittet «miljøsårbarhet vurderes innen en spredningsradius (buffersone)» nedenfor.

56 Eks: Bruk av prisene Farledstiltak (utdyping, bedret merking) i Raftsundet i Nordland Trinn 1: Risikoanalysen beregner grunnstøtingsfrekvens før og etter tiltak basert på faktisk trafikk Trinn 2 & 3: Bunkerskapasitet og potensielt utslippsvolum beregnes Trinn 4: Endring i frekvens for grunnstøt med utslipp (kollisjoner har nesten 0 i sannsynlighet) Trinn 5: Klassifisere miljøskade for ulike utslippstyper og nivåer og vurdere miljøsårbarhet i området (skadematrisen)

57 Bruk av prisene (2) Trinn 6: Summere frekvenser for ulike skadenivåer og Skadenivå Frekvens utslipp: Liten Middels 0, Stor 0, Svært stor 0, , Trinn 7: Beregne årlig velferdstap som unngås: Sum av frekvens per år for skade i X kalkulasjonspris per skade i for Nordland tiltaksfylke = 2,7 mill. kr per år Tiltaksfylke Skadenivå Nordland Pris per skade Endringsfrekvens per år Verdi av risikoreduksjon per år Liten Middels , Stor , Svært stor Trinn 8: Neddiskontert nytte = 53 millioner

58 Oslo Fjord oil spill site (Case: Eastern Norway) Damage map Pilot survey - Outer Oslo Fjord Spill

Issues and challenges in compilation of activity accounts

Issues and challenges in compilation of activity accounts 1 Issues and challenges in compilation of activity accounts London Group on environmental accounting 21st meeting 2-4 November 2015 Statistics Netherlands The Hague Kristine E. Kolshus kre@ssb.no Statistics

Detaljer

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3 Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL

Detaljer

Generalization of age-structured models in theory and practice

Generalization of age-structured models in theory and practice Generalization of age-structured models in theory and practice Stein Ivar Steinshamn, stein.steinshamn@snf.no 25.10.11 www.snf.no Outline How age-structured models can be generalized. What this generalization

Detaljer

Little Mountain Housing

Little Mountain Housing Little Mountain Housing Feedback from January 2012 Open Houses Presentation to Little Mountain Community Advisory Group Overview Open house attendance 409 signed in 600+ total Comment forms submitted 326

Detaljer

The building blocks of a biogas strategy

The building blocks of a biogas strategy The building blocks of a biogas strategy Presentation of the report «Background report for a biogas strategy» («Underlagsmateriale til tverrsektoriell biogass-strategi») Christine Maass, Norwegian Environment

Detaljer

Norway. Museum Statistics for 2011. Statistical data from 134 museums that were open to the public and had at least one man year regular staff.

Norway. Museum Statistics for 2011. Statistical data from 134 museums that were open to the public and had at least one man year regular staff. Norway Museum Statistics for 2011. Statistical data from 134 museums that were open to the public and had at least one man year regular staff. Arts Council Norway Tel: +47 21 04 58 00 post@kulturrad.no

Detaljer

Slope-Intercept Formula

Slope-Intercept Formula LESSON 7 Slope Intercept Formula LESSON 7 Slope-Intercept Formula Here are two new words that describe lines slope and intercept. The slope is given by m (a mountain has slope and starts with m), and intercept

Detaljer

Trust in the Personal Data Economy. Nina Chung Mathiesen Digital Consulting

Trust in the Personal Data Economy. Nina Chung Mathiesen Digital Consulting Trust in the Personal Data Economy Nina Chung Mathiesen Digital Consulting Why does trust matter? 97% of Europeans would be happy for their personal data to be used to inform, make recommendations or add

Detaljer

The exam consists of 2 problems. Both must be answered. English

The exam consists of 2 problems. Both must be answered. English The exam consists of 2 problems. Both must be answered. English Problem 1 (60%) Consider two polluting firms, 1 and 2, each of which emits Q units of pollution so that a total of 2Q units are released

Detaljer

Accuracy of Alternative Baseline Methods

Accuracy of Alternative Baseline Methods Accuracy of Alternative Baseline Methods Dr. Steven Braithwait Christensen Associates Energy Consulting IEPEC - Paris June 2010 Outline Demand response & role of baseline loads Measures of baseline performance

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON1310 Økonomisk aktivitet og økonomisk politikk Exam: ECON1310 Macroeconomic theory and policy Eksamensdag: 18.05.01 Sensur blir annonsert: 07.06.01

Detaljer

Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi

Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi Øivind Ekeberg 5.september 2008 Akuttmedisinsk avdeling, Ullevål universitetssykehus Avdeling for atferdsfag, Universitetet

Detaljer

IdeaBank52 COUNTIES IN NORWAY. Sons of Norway HERITAGE PROGRAMS

IdeaBank52 COUNTIES IN NORWAY. Sons of Norway HERITAGE PROGRAMS Sons of Norway 1455 W. Lake St. Minneapolis MN 55408 Tel: 612-827-3611/800-945-8851 Fax: 612-827-0658 Internet: http://www.sofn.com IdeaBank52 Sons of Norway HERITAGE PROGRAMS COUNTIES IN NORWAY Submitted

Detaljer

Ole Isak Eira Masters student Arctic agriculture and environmental management. University of Tromsø Sami University College

Ole Isak Eira Masters student Arctic agriculture and environmental management. University of Tromsø Sami University College The behavior of the reindeer herd - the role of the males Ole Isak Eira Masters student Arctic agriculture and environmental management University of Tromsø Sami University College Masters student at Department

Detaljer

Examples and experience from restorations along Tana river on the norwegian side. Knut Aune Hoseth Head of northern region

Examples and experience from restorations along Tana river on the norwegian side. Knut Aune Hoseth Head of northern region Examples and experience from restorations along Tana river on the norwegian side Knut Aune Hoseth Head of northern region Mapping of migration barriers 1998-2000 Interreg project Better understanding of

Detaljer

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

Hvordan føre reiseregninger i Unit4 Business World Forfatter: Hvordan føre reiseregninger i Unit4 Business World Forfatter: dag.syversen@unit4.com Denne e-guiden beskriver hvordan du registrerer en reiseregning med ulike typer utlegg. 1. Introduksjon 2. Åpne vinduet

Detaljer

Project manager of the MSG6-model (Leading computable general equilibrium model of the Norwegian economy).

Project manager of the MSG6-model (Leading computable general equilibrium model of the Norwegian economy). Curriculum vitae Geir H M Bjertnæs Statistics Norway Akersveien 26 0177 Oslo Pb. 8131 Dep. 0033 Oslo Telephone: 40902511 Telephone, private: 92049443 e-mail: ghb@ssb.no Date of birth: 28. Aug 1971 Nationality:

Detaljer

Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner

Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner Resultater fra omfattende internasjonal undersøkelse og betraktninger om hvordan observasjonene

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Øvelsesoppgave i: ECON30 Dato for utlevering: Tirsdag 27.09.20 Dato for innlevering: Onsdag 2.0.20 UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Innleveringssted: Ved siden av SV-info-senter mellom kl. 0.00

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Utsatt eksamen i: ECON1410 - Internasjonal økonomi Exam: ECON1410 - International economics Eksamensdag: 18.06.2013 Date of exam: 18.06.2013 Tid for eksamen: kl.

Detaljer

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS 2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS SPECIAL SECTION TO IN BUSINESS LAS VEGAS 3A September 23, 2005 SEE, PAGE 8A Businesses seek flexibility. It helps them compete in a fast-paced,

Detaljer

Forbruk & Finansiering

Forbruk & Finansiering Sida 1 Forbruk & Finansiering Analyser og kommentarer fra Forbrukerøkonom Randi Marjamaa basert på en undersøkelse gjennomført av TEMO/MMI for Nordea RESULTATER FRA NORGE OG NORDEN Nordea 2006-02-28 Sida

Detaljer

Emneevaluering GEOV272 V17

Emneevaluering GEOV272 V17 Emneevaluering GEOV272 V17 Studentenes evaluering av kurset Svarprosent: 36 % (5 av 14 studenter) Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet PhD Candidate Samsvaret mellom

Detaljer

Climate change and adaptation: Linking. stakeholder engagement- a case study from

Climate change and adaptation: Linking. stakeholder engagement- a case study from Climate change and adaptation: Linking science and policy through active stakeholder engagement- a case study from two provinces in India 29 September, 2011 Seminar, Involvering ved miljøprosjekter Udaya

Detaljer

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development Western Alaska State of Alaska Department of Community & Economic Development The CDQ program was formally approved in 1992 by the North Pacific Fishery Management Council and implemented by Governor

Detaljer

Interventions in the Cerebral palsy follow-up program: Reidun Jahnsen, PT PhD

Interventions in the Cerebral palsy follow-up program: Reidun Jahnsen, PT PhD Interventions in the Cerebral palsy follow-up program: Reidun Jahnsen, PT PhD Subgroups of CP CPOP 214 n=188 Gross Motor Function Classification System Palisano 1997, CPOP 214 171 CPOP 213 n=856 Manual

Detaljer

Kundetilfredshetsundersøkelse FHI/SMAP

Kundetilfredshetsundersøkelse FHI/SMAP Kundetilfredshetsundersøkelse FHI/SMAP Sluttrapport pr. 20. April 2010 Alle 9 kunder av FHI s produksjonsavdeling for biofarmasøytiske produkter (SMAP) i perioden 2008-2009 mottok i januar 2010 vårt spørreskjema

Detaljer

Neural Network. Sensors Sorter

Neural Network. Sensors Sorter CSC 302 1.5 Neural Networks Simple Neural Nets for Pattern Recognition 1 Apple-Banana Sorter Neural Network Sensors Sorter Apples Bananas 2 Prototype Vectors Measurement vector p = [shape, texture, weight]

Detaljer

SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE

SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE Marianne Bechmann and Lillian Øygarden NIBIO Trondheim, EVALUATION OF SYNERGIES AND CONFLICTS Environmental

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON2915 Vekst og næringsstruktur Exam: ECON2915 - Growth and business structure Eksamensdag: Fredag 2. desember 2005 Sensur kunngjøres: 20. desember

Detaljer

STØTTEMATERIALE TIL FORELESNINGENE OM SKATT

STØTTEMATERIALE TIL FORELESNINGENE OM SKATT STØTTEMATERIALE TIL FORELESNINGENE OM SKATT ECON3610, H2017 Kristoffer Midttømme Eksempler på skattevridninger: Den britiske vindusskatten Fordeling av antall vinduer (1) Oates, Wallace E., and Robert

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Øvelsesoppgave i: ECON30 Økonomisk aktivitet og økonomisk politikk Dato for utlevering: Onsdag 29. september 200 Dato for innlevering: Onsdag 3. oktober 200 kl.

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Bokmål Eksamen i: ECON1210 Forbruker, bedrift og marked Exam: ECON1210 Consumer Behaviour, Firm behaviour and Markets Eksamensdag: 12.12.2014 Sensur kunngjøres:

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT BOKMÅL Eksamen i: ECON1210 - Forbruker, bedrift og marked Eksamensdag: 26.11.2013 Sensur kunngjøres: 18.12.2013 Tid for eksamen: kl. 14:30-17:30 Oppgavesettet er

Detaljer

Building conservation in practice

Building conservation in practice Building conservation in practice Aadne Gunnar Sollid Cultural heritage leader in Aust- Agder county. Aust-Agder fylkeskommune 2 Synagogen er blant de eldste eksisterende tresynagogen i Øst-Europa. Den

Detaljer

Tor Haakon Bakken. SINTEF Energi og NTNU

Tor Haakon Bakken. SINTEF Energi og NTNU Tor Haakon Bakken SINTEF Energi og NTNU Plan for lynforedrag Energi-indikatorer Vannforbruk Sammenligning stort, smått og vind Multi-kriterieanalyse Sammenligning mellom prosjekter og teknologier Verktøy

Detaljer

Dean Zollman, Kansas State University Mojgan Matloob-Haghanikar, Winona State University Sytil Murphy, Shepherd University

Dean Zollman, Kansas State University Mojgan Matloob-Haghanikar, Winona State University Sytil Murphy, Shepherd University Dean Zollman, Kansas State University Mojgan Matloob-Haghanikar, Winona State University Sytil Murphy, Shepherd University Investigating Impact of types of delivery of undergraduate science content courses

Detaljer

Contingent Liabilities in Norwegian Local Government Accounting. Redress Programs Relating to Institutional Child Abuse

Contingent Liabilities in Norwegian Local Government Accounting. Redress Programs Relating to Institutional Child Abuse Contingent Liabilities in Norwegian Local Government Accounting Redress Programs Relating to Institutional Child Abuse telemarksforsking.no Telemarksforsking What is Redress Programs Relating to Institutional

Detaljer

Oppgave 1a Definer følgende begreper: Nøkkel, supernøkkel og funksjonell avhengighet.

Oppgave 1a Definer følgende begreper: Nøkkel, supernøkkel og funksjonell avhengighet. TDT445 Øving 4 Oppgave a Definer følgende begreper: Nøkkel, supernøkkel og funksjonell avhengighet. Nøkkel: Supernøkkel: Funksjonell avhengighet: Data i en database som kan unikt identifisere (et sett

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON30 Økonomisk aktivitet og økonomisk politikk Exam: ECON30 Macroeconomic theory and policy Eksamensdag: 30..00 Sensur kunngjøres:..00 Date of exam:

Detaljer

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort.

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort. Skatteetaten Saksbehandler Deres dato Vår dato 28.10.2011 Telefon Deres Vår referanse For information in English see page 3 Skattekort for 2012 Du fikk helt eller delvis skattefritak ved likningen for

Detaljer

The Proactima way PREPARED. Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap

The Proactima way PREPARED. Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap The Proactima way Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap Tekna Beredskapsdagene 2014 Espen Hoell og Jared Eckroth PREPARED. Proactima

Detaljer

Hva vil utslippsreduksjoner utenfor kvotepliktig sektor koste i det norskeuropeiske BRITA BYE, CREE/CICEP SEMINAR LITTERATURHUSET, 25 APRIL 2019

Hva vil utslippsreduksjoner utenfor kvotepliktig sektor koste i det norskeuropeiske BRITA BYE, CREE/CICEP SEMINAR LITTERATURHUSET, 25 APRIL 2019 Hva vil utslippsreduksjoner utenfor kvotepliktig sektor koste i det norskeuropeiske samarbeidet? BRITA BYE, CREE/CICEP SEMINAR LITTERATURHUSET, 25 APRIL 2019 Bakgrunn Norge ønsker å knytte seg til ESR

Detaljer

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS Postponed exam: ECON420 Mathematics 2: Calculus and linear algebra Date of exam: Tuesday, June 8, 203 Time for exam: 09:00 a.m. 2:00 noon The problem set covers

Detaljer

EKSAMENSOPPGAVE I SØK 1002 INNFØRING I MIKROØKONOMISK ANALYSE

EKSAMENSOPPGAVE I SØK 1002 INNFØRING I MIKROØKONOMISK ANALYSE Norges teknisk-naturvitenskapelige universitet Institutt for samfunnsøkonomi EKSAMENSOPPGAVE I SØK 1002 INNFØRING I MIKROØKONOMISK ANALYSE Faglig kontakt under eksamen: Hans Bonesrønning Tlf.: 9 17 64

Detaljer

Kartleggingsskjema / Survey

Kartleggingsskjema / Survey Kartleggingsskjema / Survey 1. Informasjon om opphold i Norge / Information on resident permit in Norway Hvilken oppholdstillatelse har du i Norge? / What residence permit do you have in Norway? YES No

Detaljer

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS English Exam: ECON2915 Economic Growth Date of exam: 25.11.2014 Grades will be given: 16.12.2014 Time for exam: 09.00 12.00 The problem set covers 3 pages Resources

Detaljer

Han Ola of Han Per: A Norwegian-American Comic Strip/En Norsk-amerikansk tegneserie (Skrifter. Serie B, LXIX)

Han Ola of Han Per: A Norwegian-American Comic Strip/En Norsk-amerikansk tegneserie (Skrifter. Serie B, LXIX) Han Ola of Han Per: A Norwegian-American Comic Strip/En Norsk-amerikansk tegneserie (Skrifter. Serie B, LXIX) Peter J. Rosendahl Click here if your download doesn"t start automatically Han Ola of Han Per:

Detaljer

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS English Postponed exam: ECON2915 Economic growth Date of exam: 11.12.2014 Time for exam: 09:00 a.m. 12:00 noon The problem set covers 4 pages Resources allowed:

Detaljer

Economic tools in ecosystem management

Economic tools in ecosystem management Economic tools in ecosystem management Kristin Magnussen Sweco Norge Kristin.Magnussen@sweco.no Foto: Mareano/Havforskningsinstituttet Outline of my presentation: What is meant by ecosystem services? TEEB

Detaljer

6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012

6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012 6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012 100 200 3000 0 0 0 13 38 63 88 113 138 163 4000 188 213 238 263 288 313 338 363 378 386 5000 394 402 410 417

Detaljer

5 E Lesson: Solving Monohybrid Punnett Squares with Coding

5 E Lesson: Solving Monohybrid Punnett Squares with Coding 5 E Lesson: Solving Monohybrid Punnett Squares with Coding Genetics Fill in the Brown colour Blank Options Hair texture A field of biology that studies heredity, or the passing of traits from parents to

Detaljer

Jørn Kristiansen MET Norway. jornk@met.no

Jørn Kristiansen MET Norway. jornk@met.no Dissemination of weather and climate information to various users of Yr : Experiences and strategy for data access, commercial use, attribution and data policy. Jørn Kristiansen MET Norway jornk@met.no

Detaljer

Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs)

Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs) Department of (Biology) Examination paper for (BI 2015) (Molekylærbiologi, laboratoriekurs) Academic contact during examination: Thorsten Hamann Phone: 91825937 Examination date: 19.12.2016 Examination

Detaljer

Utvikling og strategi i internasjonalt samarbeid med vekt på den europeiske arenaen

Utvikling og strategi i internasjonalt samarbeid med vekt på den europeiske arenaen Utvikling og strategi i internasjonalt samarbeid med vekt på den europeiske arenaen Miljøkonferanse 7.2.13 Gudrun Langthaler Avd. for bioressurser og miljø EUs 7. rammeprogram for forskning og teknologisk

Detaljer

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019 Vekstkonferansen: Vekst gjennom verdibaserte investeringer Thina Margrethe Saltvedt, 09 April 2019 Finanssektoren har en sentral rolle i samfunnet ved at den skal finansiere økonomiske aktiviteter for

Detaljer

Forskerseminar Havet og kysten PROOFNY & OLF. Toril Røe Utvik Einar Lystad

Forskerseminar Havet og kysten PROOFNY & OLF. Toril Røe Utvik Einar Lystad Forskerseminar Havet og kysten PROOFNY & OLF Toril Røe Utvik Einar Lystad Rapportering av utslipp Rapporteringsfrist 1. mars Felles tall for Klif, OD og OLF Viser statistikk for: Produsert olje, kondensat

Detaljer

Fergefri E39 Workshop Mernytte. Oslo 7/ Kjetil Strand, Statens vegvesen Region midt

Fergefri E39 Workshop Mernytte. Oslo 7/ Kjetil Strand, Statens vegvesen Region midt Fergefri E39 Workshop Mernytte Oslo 7/3 2016 Kjetil Strand, Statens vegvesen Region midt Fergefri E39 Workshop Mernytte, Innledning Fanger N/K-analysene i transportsektoren opp alle virkninger? Skepsis

Detaljer

Om tabellene. Januar - februar 2019

Om tabellene. Januar - februar 2019 Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Om tabellene. Januar - mars 2019

Om tabellene. Januar - mars 2019 Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned

Personer med nedsatt arbeidsevne. Fylke og alder. Tidsserie måned Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

Om tabellene. Januar - mars 2018

Om tabellene. Januar - mars 2018 Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer med nedsatt arbeidsevne". Fylke. Antall I alt I alt

Detaljer

The Political Game of European Fisheries Management

The Political Game of European Fisheries Management The Political Game of European Fisheries Management Margrethe Aanesen and Claire W Armstrong, Environmental and Resource Economics (2016) 63, 745-763 Background Jensen, F. and N.Vestergaard (2002) Management

Detaljer

Nasjonalt fakultetsmøte Bergen april Prosjektleder Heidi Dybesland

Nasjonalt fakultetsmøte Bergen april Prosjektleder Heidi Dybesland Nasjonalt fakultetsmøte Bergen 27.-28. april 2017 Prosjektleder Heidi Dybesland Hvem deltar? Alle institusjoner med samfunnsvitenskapelig forskning ble invitert med. Hvor publiserer forskerne? Institusjonene

Detaljer

Om tabellene. Januar - desember 2018

Om tabellene. Januar - desember 2018 Personer med nedsatt arbeidsevne. Fylke og alder. Om tabellene "Om statistikken - Personer med nedsatt arbeidsevne" finner du på nav.no ved å følge lenken under relatert informasjon på siden "Personer

Detaljer

Statistiske oppgaver over selvmord i Norge, Norden og de baltiske land. Suicide statistics in Norway, the Nordic and the Baltic countries

Statistiske oppgaver over selvmord i Norge, Norden og de baltiske land. Suicide statistics in Norway, the Nordic and the Baltic countries Statistiske oppgaver over selvmord i Norge, Norden og de baltiske land Suicide statistics in Norway, the Nordic and the Baltic countries Finn Gjertsen 1, 2 26 1 Seksjon for selvmordsforskning og forebygging,

Detaljer

Exercise 1: Phase Splitter DC Operation

Exercise 1: Phase Splitter DC Operation Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your

Detaljer

Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode

Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode Bedriftenes Møteplass 2016 Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode Magnus Thomassen, SINTEF Materialer og Kjemi Technology for a better society 1 Oversikt Hvorfor hydrogen Litt

Detaljer

Bærekraftig utvikling gjennom BREEAM Communities

Bærekraftig utvikling gjennom BREEAM Communities Building Research Establishment Environmental Assessment Method Protecting People, Property and the Planet Bærekraftig utvikling gjennom BREEAM Communities Oddrun Helen Hagen BREEAM Communities NGBC Forsker

Detaljer

SOME EMPIRICAL EVIDENCE ON THE DECREASING SCALE ELASTICITY

SOME EMPIRICAL EVIDENCE ON THE DECREASING SCALE ELASTICITY ARTIKLER FRA STATISTISK SENTRALBYRÅ NR. 71 SÆRTRYKK FRA ECONOMETRICA, VOL. 42, NO. 1 (JANUAR 1974) SOME EMPIRICAL EVIDENCE ON THE DECREASING SCALE ELASTICITY By Vidar Ringstad NOEN RESULTATER FOR PRODUKTFUNKSJONEP.

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON20/420 Matematikk 2: Matematisk analyse og lineær algebra Exam: ECON20/420 Mathematics 2: Calculus and Linear Algebra Eksamensdag: Fredag 2. mai

Detaljer

Christine Hung Consultant/Advisor MiSA Miljøsystemanalyse www.misa.no

Christine Hung Consultant/Advisor MiSA Miljøsystemanalyse www.misa.no Biogas from municipal organic waste Trondheim s environmental holy grail? Christine Hung Consultant/Advisor MiSA Miljøsystemanalyse www.misa.no 2 What is biogas? Produced naturally from biological decomposition

Detaljer

Den som gjør godt, er av Gud (Multilingual Edition)

Den som gjør godt, er av Gud (Multilingual Edition) Den som gjør godt, er av Gud (Multilingual Edition) Arne Jordly Click here if your download doesn"t start automatically Den som gjør godt, er av Gud (Multilingual Edition) Arne Jordly Den som gjør godt,

Detaljer

By Bioforsk RECOCA Team Per Stålnacke Csilla Farkas Johannes Deelstra

By Bioforsk RECOCA Team Per Stålnacke Csilla Farkas Johannes Deelstra By Bioforsk RECOCA Team Per Stålnacke Csilla Farkas Johannes Deelstra RECOCA Annual Workshop 14-15 December, 2009 Denmark Quantification of retention from source emissions to river mouth Estimation of

Detaljer

Software applications developed for the maritime service at the Danish Meteorological Institute

Software applications developed for the maritime service at the Danish Meteorological Institute Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological

Detaljer

The Norwegian Citizen Panel, Accepted Proposals

The Norwegian Citizen Panel, Accepted Proposals PROGRAMMER NOTE: There are 4 ways question is asked. That is, each of these one of these 4 questions. Please be sure to use a truly random assignment method to determine

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Bokmål Eksamen i: ECON30 Økonomisk aktivitet og økonomisk politikk Exam: ECON30 Macroeconomic theory and policy Eksamensdag: 26.05. 204 Sensur kunngjøres: 6.06.204

Detaljer

EN Skriving for kommunikasjon og tenkning

EN Skriving for kommunikasjon og tenkning EN-435 1 Skriving for kommunikasjon og tenkning Oppgaver Oppgavetype Vurdering 1 EN-435 16/12-15 Introduction Flervalg Automatisk poengsum 2 EN-435 16/12-15 Task 1 Skriveoppgave Manuell poengsum 3 EN-435

Detaljer

European supply and demand for Cod and Haddock

European supply and demand for Cod and Haddock European supply and demand for Cod and Haddock Ingrid Kristine Pettersen, Codfish analyst, Norwegian Seafood Council 13/02/2017 Capia Uavhengig informasjonsog analyseselskap Innhenter og tilrettelegger

Detaljer

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør

Detaljer

SRP s 4th Nordic Awards Methodology 2018

SRP s 4th Nordic Awards Methodology 2018 SRP s 4th Nordic Awards Methodology 2018 Stockholm 13 September 2018 Awards Methodology 2018 The methodology outlines the criteria by which SRP judges the activity of Manufacturers, Providers and Service

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT UNIVERSITETET I OSLO ØKONOMISK INSTITUTT Eksamen i: ECON1910 Poverty and distribution in developing countries Exam: ECON1910 Poverty and distribution in developing countries Eksamensdag: 1. juni 2011 Sensur

Detaljer

GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS

GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS Projects: 1. Microbial Selective Plugging MSP (Sandstone - reservoirs) 2. Particle Fracture Blocking PFB (Karbonat - reservoirs) 3. Upscaling/Meso

Detaljer

Medisinsk statistikk, KLH3004 Dmf, NTNU 2009. Styrke- og utvalgsberegning

Medisinsk statistikk, KLH3004 Dmf, NTNU 2009. Styrke- og utvalgsberegning Styrke- og utvalgsberegning Geir Jacobsen, ISM Sample size and Power calculations The essential question in any trial/analysis: How many patients/persons/observations do I need? Sample size (an example)

Detaljer

Økonomisk verdi av marine økosystemtjenester. Margrethe Aanesen

Økonomisk verdi av marine økosystemtjenester. Margrethe Aanesen Økonomisk verdi av marine økosystemtjenester Cold-water UiT - Norges Arktiske coral Universitet off the Norges Norwegian Fiskerihøgskole coast Margrethe Aanesen Classification of ecosystem services Millennium

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene

Detaljer

Gaute Langeland September 2016

Gaute Langeland September 2016 Gaute Langeland September 2016 Svak krone 10,4 10 9,6 9,2 8,8 8,4 EURNOK 8 7,6 7,2 6,8 3jan00 3jan02 3jan04 3jan06 3jan08 3jan10 3jan12 3jan14 3jan16 2 12.10.2016 Ikke helt tilfeldig 3 12.10.2016 Hvordan

Detaljer

Péter Bakonyi VITUKI

Péter Bakonyi VITUKI Péter Bakonyi VITUKI Outline EU vs. Hungarian requirements Hungarian approach Preliminary flood hazard maps Flood hazard mapping Large rivers Small rivers Excess water What s next? 16-11-2009 Meeting of

Detaljer

Få en bedre risikoforståelse på 20 minutter

Få en bedre risikoforståelse på 20 minutter Få en bedre risikoforståelse på 20 minutter Hva er helhetlig risikostyring? 1 - H 2 Husk: Risikoen er der hvorfor ikke styre den? 3 Hva er helhetlig risikostyring? Strategi og mål - Visjon og verdigrunnlag

Detaljer

Eiendomsverdi. The housing market Update September 2013

Eiendomsverdi. The housing market Update September 2013 Eiendomsverdi The housing market Update September 2013 Executive summary September is usually a weak month but this was the weakest since 2008. Prices fell by 1.4 percent Volumes were slightly lower than

Detaljer

Dynamic Programming Longest Common Subsequence. Class 27

Dynamic Programming Longest Common Subsequence. Class 27 Dynamic Programming Longest Common Subsequence Class 27 Protein a protein is a complex molecule composed of long single-strand chains of amino acid molecules there are 20 amino acids that make up proteins

Detaljer

What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles?

What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles? What is the Norwegian Health System like? What are the plans for the 116 117 in Norway? What are the biggest obstacles? I preciate to get the invitation to participate at this convention and give the Norwegian

Detaljer

Multimedia in Teacher Training (and Education)

Multimedia in Teacher Training (and Education) Multimedia in Teacher Training (and Education) Bodo Eckert, Stefan Altherr, Hans-Jörg Jodl Second International GIREP Seminar 1-6 September 2003 University of Udine, Italy Content Training courses for

Detaljer

Perpetuum (im)mobile

Perpetuum (im)mobile Perpetuum (im)mobile Sett hjulet i bevegelse og se hva som skjer! Hva tror du er hensikten med armene som slår ut når hjulet snurrer mot høyre? Hva tror du ordet Perpetuum mobile betyr? Modell 170, Rev.

Detaljer

Neuroscience. Kristiansand

Neuroscience. Kristiansand Neuroscience Kristiansand 16.01.2018 Neuroscience Frank E. Sørgaard Medisinsk rådgiver «Hvordan kan MS medikamentenes effekt og sikkerhet sammenlignes»? Neuroscience Når det ikke finne head to head studier

Detaljer

European Crime Prevention Network (EUCPN)

European Crime Prevention Network (EUCPN) European Crime Prevention Network (EUCPN) The EUCPN was set up by Council Decision 2001/427/JHA in May 2001 to promote crime prevention activity in EU Member States. Its principal activity is information

Detaljer