Goliat - The Concept Solution Odd Vårdal Deputy Development Project Manager Oslo - 4 th of June 2010 www.goliatinfo.com
Main topics for presentation Arctic challenges Development concept Oil spill preparedness Contract strategy Schedule
Oil and gas activity in artic areas - characteristics Weather, ice and winter darkness Environmental vulnerability Natural resources Local communities Remote area Weak infrastructure
Oil and gas activity in artic areas - challenges Technical Safety Working environment Pollution prevention Stakeholder management
Eni - Arctic Projects Arctic Themes Weather, ice and winter darkness Limited infrastructure Nikaitchuq Eni 100% Goliat Eni 65% Severenergia Eni 29% Environmental vulnerability Seismic on ice and under ice Preserving biodiversity
Location of Goliat License PL229 Eni Norge AS - 65%, (Oper) Statoil Petroleum AS - 35%
Goliat - Project Milestones VALUE IDENTIFICATION VALUE REALISATION Evaluation Gate 1 Concept Concept Gate 2 Gate 3 Selection Definition Execution Hand over Production and close out Gate1 passed Oct 2006 Gate2 passed Dec 2007 Gate3 Dec 2008 1st oil Nov 2013
Goliat Concept Selection FPSO Subsea System Offshore processing and oil storage ( SEMO and Sevan evaluated in addition to standard FPSO) Semi FSU Subsea System Semi Storage/Export Offshore processing and onshore oil storage Subsea System Oil pipeline Onshore processing and Storage (S2B) Subsea/Separation/Boosting system - oil/water/gas pipeline - gas pipeline - water injection pipeline
Goliat concept Goliat will be developed with a floating offshore platform Selection based on: lowest environmental risk lowest energy consumption utilization of proven technology the most favorable economics opens for later tie-ins of regional fields Goliat FPSO Sevan 1000
Technology utilization Low risk Low emissions winterized process modules electrical power cable from shore low emission gas turbine with WHRU re-injection of produced water no gas flaring segregated ballast tanks hydrocarbon cover gas in storage tanks VOC equipment on shuttle tanker cleaning of produced water environmental friendly chemicals highest standard on stand by vessel sensors and detectors on critical equipment infrared radar surveillance of area
FPSO Facilities design capacities oil: 100 000 bopd gas: 3.8 MSm 3 /d spare capacity (space & weight) to ensure future tie-ins water injection and water handling capacities expandable to meet gas export requirements
Goliat FPSO - Summary of main dimensions Process deck diameter: 107m Elevation of process deck: 49m Main deck diameter: 102m Elevation of main deck: 44m Main hull diameter: 90m Keel diameter: 112m Normal loaded draft: 30m Ballast draft 20.5m 12
Goliat FPSO Project - Sites and Locations of Main Activities Goliat Field Location Offshore Hook-up and Commissioning Eni Norge Hammerfest Opr. Office Eni Norge Stavanger Home Office CB&I Topside Engineering Site, London Sevan Marine Office Locations, Oslo, Arendal and Trondheim, Norway Eni E&P Head Office, Milan,Italy HHI Hull Global and FPSO Detailed Engineering, Construction and Onshore Commissioining Site Ulsan, Korea
Goliat - Field Arrangement 22 wells in 8 of 4-slot templates 350-400 meter water depth
Well Layout Realgrunnen: 4 prod 4 water injectors ~1200 m 120 bar 30-35 o C 31 33 o API Kobbe: 7 prod 5 water injectors 2 Gas injectors ~1800 m 180 bar 48 o C 43 44 o API
Goliat FPSO offloading Pollution risk reduction
Shuttle Tanker Loading Strategy development Relevant experience Governing criteria Distance Heading Risk areas Verification 18
TANKER POSITIONING REQUIREMENTS AND LIMITATIONS General requirements: The shuttle tanker shall normally operate with 50 m heading offset to the FPSO. Prohibited area Heading toward the FPSO is only allowed during change of tankers heading from one side of the FPSO to the other. 20 m 150 m 50 m Mooring lines Normal operating distance between the shuttle tanker bow and the FPSO is 250 m. Restricted area Minimum distance between the shuttle tanker and the FPSO is 150 m. 50 m Minimum distances between the shuttle tanker bow manifold and the closest riser and mooring line are 50 and 20 m, respectively. Secondary offloading station challenges: Restricted operation area. Riser area Offloading sector divided in two. Clearance to risers. 19
Goliat FPSO Offloading station Special focus on: Winterization Working environment Operational efficiency Hose wear (side loads) Reel fatigue 20
Shuttle Tanker Offloading in Good Weather Conditions 21
Shuttle Tanker Offloading in Winter Conditions 22
Oljevernberedskap for Goliat målsetting og eksterne vilkår Eni Norges mål for oljevernberedskapen for Goliat: Robust Effektiv Godt tilpasset lokale forhold St.prp. nr. 64 (2008-2009) Utbygging og drift av Goliatfeltet vilkår nr. 6: Oljevernberedskap skal være meget høyt prioritert Operatøren skal foreta en detaljert kartlegging av infrastrukturen innen influensområdet for forurensende utslipp Operatøren skal gjennomføre tiltak for å styrke oljevernberedskapen i berørte kommuner, som Måsøy, Hasvik og Nordkapp med utgangspunkt i de behov for konkretisering av tiltak som Kystverket har påpekt i høringsrunden. Endelig beredskapsløsning iht. krav i tillatelse etter forurensningsloven
Tiltakene som styrker oljevernberedskapen for Goliat består av: Styrket havgående beredskap (barriere 1 og 2) Deteksjon og overvåking Beredskapsfartøy Flere tilgjengelige ressurser Forbedret kyst- og strandsoneberedskap (barriere 3 og 4) Fiskefartøyer i permanent beredskap Nye innsatsgrupper i kyst- og strandsonen Infrastruktur, logistikk og fjernmåling (alle barrierer) Bruk av ny fjernmålingsteknologi Landgangsfartøy Materiell på nye depoter Detaljerte beredskapsplaner
Goliat FPSO - Beredskapsfartøy
Deteksjon To uavhengige sensorer på bunnrammene akustisk kapasitans (ledningsevne) Egen inspeksjons-rov Feltinterne rørledninger vil bli inspisert med ROV fra beredskapsfartøyet
Fjernmåling Oljedetekterende radar og IRkamera plassert på FPSO, beredskapsfartøy og forsyningsfartøy IR-kamera i all weather SAR -helikopter IR-kamera og radar i overvåkingsfly AIS-bøyer Satellitt Landbasert HF-radar (prosjekt under utvikling)
Oppsummering tiltak for styrket beredskap Styrket deteksjon og fjernmåling Styrket beredskap i barrierene 1 og 2 (åpent hav) Polarbase Hammerfest Styrket kystnær beredskap ved bruk av fiskebåter Depot i Måsøy Bruk av fiskere - lokal kunnskap og maritim kompetanse Styrket kapasitet for tiltak i akuttfasen på strand Depot in Hasvik Depot in Måsøy Utvidet NOFO spesial team Styrket lagringskapasitet Bruk av ny teknologi Detaljert logistikk kartlegging av og detaljerte beredskapsplaner for kystsonen Styrket kompetanse og øvelsesvirksomhet med bruk av lokale kompetansemiljøer
Goliat Contract Strategy
Goliat Field Development Schedule