Dvalin prosjektet 27. oktober 2016 Lars Fridthjof Moe,
A brief history of DEA Norge 1973 1979 1980ies 1990 1991 1991 2010 2015 2016 Company established as Deminex Norge AS. First licences acquired shortly thereafter The Snorre field was discovered, and three years later the Veslefrikk field. Snorre is still one of our main sources of income. Amongst the first companies to enter the Norwegian Sea and the Barents Sea. First income when Veslefrikk came on stream. Became operator. First operatorship was PL166. Deminex was split among the shareholders Deminex Norge became RWE Dea Norge. Zidane and Titan were discovered. Sold by RWE to LetterOne. RWE Dea Norge becomes DEA Norge. Purchase of E.ON E&P Norge. Merger with E.ON E&P Norge. Move head office to Stavanger Dvalin PDO 43 YEARS PAGE 2
PL435 Utbygging av Dvalin PL435 DEA Norge (O) 40% Maersk 20% Edison 20% OMV 20% Lisensbetingelser Licence award 2007 2008 2009 2010 2011 2012 2013 2016 PDO Drill or Drop BOK BOV Feasibility Concept FEED Execution 2020 Start 3D Reproc.. P. Eval. Site survey Drill Dvalin east Drill Dvalin west PAGE 3
Toppen av reservoaret i Garn-formation Henry prospect Dry well with gas indication (1984) Heidrun Oil field (Statoil op.) Victoria Gas discovery (Total op.) Dvalin west Gas discovery 2012 Dvalin east Gas discovery 2010
Dvalin Feltutviklingsbeskrivelse Basert på et velprøvd teknisk konsept med fire havbunnsbrønner knyttet opp mot eksisterende Heidrunplattformen Installasjon av en 4-brønners template på havbunnen med flowlines og umbilical knyttet til Heidrun Installasjon av en ny modul for prosessering og kompresjon av gass på Heidrun Statoil skal utføre alt arbeid på Heidrun og DEA vil utføre alt subsea og undergrunnsarbeid som Dvalin Operator Utbygging av Dvalin Feltet inkluderer en tie-in avtale mellom Dvalin lisensen og Heidrun Unit Gassen vil bli transportert fra Heidrun i Polarled rørledningen, bearbeides videre for å tørke gassen på Nyhamna, og transportert via Gassled til markedet Første gass forventes andre halvdel av 2020 PAGE 6
Subsea tie-back and processing on Heidrun Page 7
Base and logistic Rock Management Smaller subsea modules Statoil - Stjørdal Aibel - Haugesund Fabrication yard modules Technip - Orkanger Spool base, Pipeline fab. Aker - Egersund Fabrication yard Subsea Aibel Aker - Technip Engineering
Project execution summary schedule Dvalin Development Project Project Summary Schedule Rev: 31.08.2016 2016 2017 2018 2019 2020 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Submit PDO Heidrun Topside Contract Award H25 Module EPC M40 Module EPC Offshore Work Riser EPC Methanol/MEG Inj. Onshore Heavy Package Commissioning Lift Compressor Package H25 Handover to Operation Comm. Start Drilling Onshore Commissioning Heavy Lift Offshore Modifications Hook-up First Gas & Pull-in M40 Handover to Operation Comm. Demob. & clean-up SPS Contract Award Integrated Template Structure (ITS) Manifold Delivery Large Bore Valves Ready for SIT Delivery Wellhead Systems # 1-5 XMT Systems # 1-4 Delivery 5 off Ready for SIT Delivery 2 off 1 off 1 off Umbilical Testing Control System Test Workover System Test System Integration Test Delivery Pull-in SURF Contract Award Gas Export Pipeline Production Flowline Ready for Ready for Prod. & GE Riser Bases and PLEM Ready for : Riser Bases PLEM Drilling Pilot Well Drilling Well # 1 Well # 2 Well # 3 Well # 4 Drilling 1 Drilling 2 Completion Drilling 1 Drilling 2 Completion Drilling 1 Drilling 2 Completion Drilling 1 Drilling 2 Completion Page 9
Oppsummering Prosjektet vil skape store verdier for samfunnet Prosjektet prioriterer kvalitet og robusthet i løsninger og tidsplan Kapasitetsøkning på Heidrun og fyller Polarled gir nye muligheter Kontraktstildelinger i oktober 2016 - gir sysselsetting og ringvirkninger Takk for oppmerksomheten