Welco come to Fluke 101

Størrelse: px
Begynne med side:

Download "Welco come to Fluke 101"

Transkript

1 Welcome eco e to Fluke 101

2 Fluke 101 Summer flounder stock status RI management plan RI fishery performance RI fishery profile

3 Summer Flounder Stock Status The summer flounder stock: not overfished, overfishing not occurring according to output of 2011 stock assessment update and relative to SAW 47 biological reference points According to 2011 stock assessment update, stock considered rebuilt, ahead of scheduled deadline.

4 Summer Flounder Stock Status Fishing mortality (F) ranged between 1.0 and 2.0 during The fishing mortality rate estimated at in 2010 Below the threshold fishing mortality reference point FMSY = F35% = 0.310

5 Summer Flounder Stock Status Spawning stock biomass (SSB) decreased from 25,000 mt in the early 1980s to 7,000 in 1989, increased above 40,000 mt by 2002 SSB estimated at 60,238 mt in 2010 About 100.2% of the SSBMSY = SSB35% reference point = 60, mt.

6 Summer Flounder Stock Status The arithmetic average recruitment 1982 to 2010: 43 million fish at age 0 The 2009 year class currently estimated at 60 million fish 40% above average, largest in assessment since 1986.

7 Summer Flounder Stock Status The original 2010 assessment update indicated recruitment at 80 million fish This decreased d upon full updated d assessment to 60 million fish Reason quota decreased for 2012.

8 Summer Flounder Stock Status Local Info 3.0 Summer Flounder Abundance in the Rl Area Based on Trawl Surveys and Recreational Catch Data No. per Tow Year Observed Smooth

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33 RI Summer Flounder Quota Management Program: 2011 Winter 1 Sub Period Season is Jan Apr 54% of starting adjusted state allocation = 1,256,560 lbs Starting Possession Limits: 300/day; Aggregate Period 3,000/week or 500/day

34 RI Summer Flounder Quota Management Program: 2011 Summer Sub period Season is May Oct 35% of starting adjusted state allocation = 814,343 lbs Starting Possession Limits: 100/day; Aggregate Period 500/week or 100/day Fri/Saturday Closures

35 RI Summer Flounder Quota Management Program: 2011 Winter 2 Sub Period Season is Nov Dec 11% of starting adjusted state allocation = 236,212 lbs Starting Possession Limits: 600/day

36 RI Summer Flounder Quota Management Program: 2011 Sector Pilot Program One O group applied in 2011, the RI Fluke Conservation Cooperative, 13 vessels Commenced February 21, 2011 Allocation was 15.7% of state s total allocation Based on period of Jan Dec 31; Summer TAC = # vessels x open days at 100 lbs In pounds Summer TAC = 140,400 lbs.

37 RI Licenses & Landing Permits that Allow for the Commercial Harvest & Landing of Fluke in RI License Category # of Licenses # Landing Fluke MPL (Resident % Only) PEL w/rff Residents % Non-Residents 50 CFL w/rff (Residents) % Resident % Landing Permits Non-Res % Landing Permits Totals % Residents Non-Residents % Active in Fishery

38 RI Summer Flounder Exemption Certificate Current Permit Information: Permits issued 173 Transfer actions 80+ Inactive permits 25 Invalid 21 Original intent: protect traditional RI fishery against influx of out of state effort once other states fisheries closed Created at advent of state by state quotas Pitfalls: implementation creates burden for DFW; creates a business hindrance for fishermen

39 Proportions of Gear Types Landing Fluke in RI Gear Type Proportions Based on State Logbooks Floating Fish Trap, 3.6 Other (Fish Pot, Lobster Pot, Scuba), 0.2 Gill Net, 18.9 Otter Trawl, 18.4 Rod and Reel, % of all Landings Represents state vessel landings Gear Type Proportions Based on VTR Rod and Reel, 1.2 Otter Trawl, 94.3 Other (Dredge, Purse seine, Weirs, Fish Pot, Lobster Pot), 0.5 Gill Net, % of all Landings Represents federal vessel landings

40 Proportions of Gear Types Landing Fluke in RI Proportion of Summer Flounder Landings by Gear Types and Year Propor tion Dredge Floating Fish Trap Gill Net Otter Trawl Fish Pot Lobster Pot Purse Seine Rod and Reel Scuba Gear Trap Weirs

41 Commercial Landings Change in Effort Between Years # of Fluke transactions per Year s # of Fluk ke Transaction

42 Commercial Participation # of Fluke Transactions by Month 2010 / ions # of Fluke Transact Monthly Transactions 2011 Monthly Tansactions Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec This chart represents the total # of RI licenses landing summer flounder at RI dealers by month from Jan 1, 2010 Dec 31, 2011

43 Commercial Landings 2011 Effort During Season 2011 Participants & Landings Pounds 2,800,000 2,600,000 2,400,000 2,200,000, 2,000,000 1,800,000 1,600,000 1,400,000 1,200, ,000, , , , , # of Participants Pounds /2/2011 2/2/2011 3/2/2011 4/2/2011 5/2/2011 6/2/2011 # of Participants 7/2/2011 8/2/2011 9/2/ /2/ /2/ /2/2011

44 RI Fishery Performance - Commercial Landings Summer Flounder 2,700,000 2,400,000 2,100,000 1,800,000 1,500,000 1,200,000, 900, , ,000 0 Pounds Cumulative Lbs Total Allocation 1-Jan Jan Feb Mar-11 7-Apr-11 1-May May Jun Jul-11 5-Aug Aug Sep Oct-11 9-Nov-11 3-Dec Dec-11

45 RI Fishery Performance - Commercial Landings During 2011 Summer 900, , , ,000 Summer Sub Period Allocation and Cumulative Landings 500,000 Pounds 400, , , , /1/2011 5/8/2011 5/15/2011 5/22/2011 5/29/2011 6/5/2011 6/12/2011 6/19/2011 6/26/2011 7/3/2011 7/10/2011 7/17/2011 7/24/2011 7/31/2011 8/7/2011 8/14/2011 8/21/2011 8/28/2011 9/4/2011 9/11/2011 9/18/2011 9/25/ /2/ /9/ /16/ /23/ /30/2011 Date

46 RI Fishery Performance - Commercial Landings During 2011 Summer 900, , , , ,000 6/1 7/23: Avg daily landings = 4,386 lbs/day Projected P j t d underage 65,792 lbs Increased to 150 lbs/day 750 lbs/wk Pounds 400, , , , /23/2011 5/1/2011 5/8/2011 5/15/2011 5/22/2011 5/29/2011 6/5/2011 6/12/2011 6/19/2011 6/26/2011 7/3/2011 7/10/2011 7/17/2011 7/24/2011 7/31/2011 8/7/2011 8/14/2011 8/21/2011 8/28/2011 9/4/2011 9/11/2011 9/18/2011 9/25/ /2/ /9/2011 0/16/ /30/2011 Date

47 RI Fishery Performance - Commercial Landings During 2011 Summer 900, , ,000 7/24 9/4: Avg daily landings = 4,532 lbs/day Projected underage 63,513 lbs Increased to 200 lbs/day - 1,000 lbs/wk 600, ,000 Pounds 400, , , , /23/2011 5/1/2011 5/8/2011 5/15/2011 5/22/2011 5/29/2011 6/5/2011 6/12/2011 6/19/2011 6/26/2011 7/3/2011 7/10/2011 7/17/2011 7/24/2011 7/31/2011 8/7/2011 8/14/2011 8/21/2011 8/28/2011 9/4/2011 9/11/2011 9/18/2011 9/25/ /2/ /9/ /16/ /30/2011 Date

48 RI Fishery Performance - Commercial Landings During 2011 Summer 900, , , ,000 9/5 9/17: Avg daily landings = 3,391 lbs/day Projected underage 125,177 Increased to 250 lbs/day 1250 lbs/wk 500,000 Pounds 400, , , , /1/2011 5/8/2011 5/15/2011 5/22/2011 5/29/2011 6/5/2011 6/12/2011 6/19/2011 6/26/2011 7/3/2011 7/10/2011 7/17/2011 7/24/2011 7/31/2011 8/7/2011 8/14/2011 8/21/2011 8/28/2011 9/4/2011 9/11/2011 9/18/2011 9/25/ /2/ /9/ /16/ /23/ /30/2011 Date Continued to monitor in this manner Made 4 additional adjustments Maxed out at 1,000 lbs/day 5,000 lbs/wk

49 2011 Sector Info Cumulative Landings Sector Cumulative Catch Graph 350, , , , ,000 ounds Cumulative Catch Total Allocation Summer Allocation 100, , ,000 Po 0 50,000 2/21/11 2/26/11 3/3/11 3/8/11 3/13/11 3/18/11 3/23/11 3/28/11 4/2/11 4/7/11 4/12/11 4/17/11 4/22/11 4/27/11 5/2/11 5/7/11 5/12/11 5/17/11 5/22/11 5/27/11 6/1/11 6/6/11 6/11/11 6/16/11 6/21/11 6/26/11 7/1/11 7/6/11 7/11/11 7/16/11 7/21/11 7/26/11 7/31/11 8/5/11 8/10/11 8/15/11 8/20/11 8/25/11 8/30/11 9/4/11 9/9/11 9/14/11 9/19/11 9/24/11 9/29/11 0/4/11 0/9/11 0/14/11 0/19/11 0/24/11 0/29/11 1/3/11 1/8/11 /13/11 /18/11 /23/11 /28/11 2/3/11 2/8/11 2/13/11 2/18/11 2/23/11 2/28/11 2/ 2/ 3/ 3/ 3/ 3/ 4/ 4/ 4/ 4/ 5/ 5/ 5/ 5/ 6/ 6/ 6/ 6/ 7/ 7/ 7/ 7/ 7/ 8/ 8/ 8/ 8/ 8/ 9/ 9/ 9/ 9/ / 10/ 10/ 10/ / 11/ 11/ 11/ / 12/ 12/ 12/

50 2011 Summer Flounder Research Set Aside Landings 11 Commercial vessels landed RSA Fluke in 2011 Landings totaled 136,944 pounds RSA landings have no negative impact on state quota, but do make day to day monitoring a challenge due to data lags and misreporting 2011 Fluke RSA landings 160, , ,000 Pounds 100,000 80,000 60, ,000 20, /2/2011 5/16/2011 5/30/2011 6/13/2011 6/27/2011 7/11/2011 7/25/2011 8/8/2011 8/22/2011 9/5/2011 9/19/ /3/ /17/ /31/ /14/ /28/ /12/ /26/2011

51 Commercial Landings Monitoring Lag ,800,000 1,600,000 1,400,000 Pounds Actually Landed d Pounds Reported 1,200,000 1,000, ,000 Pounds 600, , , /21/09 1/12/09 1/26/09 2/9/09 2/23/09 3/9/09 3/23/09 4/6/09 4/20/09 5/4/09 5/18/09 6/1/09 6/15/09 6/29/09 7/13/09 7/27/09 8/10/09 8/24/09 9/7/09 10/5/09 Date

52 Commercial Landings Monitoring Lag ,000,000 2,500,000 Pounds actually landed Pounds reported 2,000,000 1,500,000 Pounds 1,000, , /12/2011 1/26/2011 2/9/2011 2/23/2011 3/9/2011 3/23/2011 4/6/2011 4/20/2011 5/4/2011 5/18/2011 6/1/2011 6/15/2011 6/29/2011 7/13/2011 7/27/2011 8/10/2011 8/24/2011 9/7/2011 9/21/ /5/ /19/ /2/ /16/ /30/ /14/ /28/2011 Date

53 2010 vs 2011 Summer Flounder Dealer Reporting 14,027 summer flounder records reported ,229 summer flounder records reported records with Non-Rhode Island licenses records with Non-Rhode Island licenses records with unknown license records with unknown license ,359 records (9.7%) w/ unk vessel reported records (2.4%) w/ unk vessel reported records (1.2%) reported from shore records (1.3%) reported from shore

54 RI Summer Flounder Quota Management Program: 2012 Winter 1 Sub Period Season is Jan Apr 54% of state allocation = 1,078,056 lbs Possession Limits: 500/day; Aggregate Period 3,500/week or 500/day

55 RI Summer Flounder Quota Management Program: 2012 Summer Sub Period Season is May Oct 35% of state allocation = 698,740 lbs Possession Limits: 100/day; Aggregate Period 700/week or 100/day; Fri/Sat Closure removed

56 RI Summer Flounder Quota Management Program: 2012 Winter 2 Sub Period Season is Nov Dec 11% of state allocation = 219,604 lbs Possession Limits: 600/day

57 Conclusions Still room for improvement with dealer reporting Need to do a better job accounting for drop off in effort Made it through year with no closures and no overages Achieved almost entire state allocation Improved dealer reporting Other improvements - TBD

58 Appreciation I would like to acknowledge and extend appreciation to: Dan Costa and Kevin Smith, RIDFW Commercial Fishing Industry Mark Gibson, April Valliere, and Robert Ballou, RIDFW Judith Swift, Coastal Institute

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development Western Alaska State of Alaska Department of Community & Economic Development The CDQ program was formally approved in 1992 by the North Pacific Fishery Management Council and implemented by Governor

Detaljer

Gaute Langeland September 2016

Gaute Langeland September 2016 Gaute Langeland September 2016 Svak krone 10,4 10 9,6 9,2 8,8 8,4 EURNOK 8 7,6 7,2 6,8 3jan00 3jan02 3jan04 3jan06 3jan08 3jan10 3jan12 3jan14 3jan16 2 12.10.2016 Ikke helt tilfeldig 3 12.10.2016 Hvordan

Detaljer

Eiendomsverdi. The housing market Update September 2013

Eiendomsverdi. The housing market Update September 2013 Eiendomsverdi The housing market Update September 2013 Executive summary September is usually a weak month but this was the weakest since 2008. Prices fell by 1.4 percent Volumes were slightly lower than

Detaljer

Model Description. Portfolio Performance

Model Description. Portfolio Performance Model Description Market timing results from 2000 to 2019 are based on our Market Allocation Algorithm holding the top two (2) ranked assets each month. Risk control is added to keep asset(s) in cash if

Detaljer

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS 2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS SPECIAL SECTION TO IN BUSINESS LAS VEGAS 3A September 23, 2005 SEE, PAGE 8A Businesses seek flexibility. It helps them compete in a fast-paced,

Detaljer

Markedet for torsk i EU

Markedet for torsk i EU Markedet for torsk i EU v/ruth Kongsvik AqKva-konferansen 2007 Konsumutvikling og trender Tilførsel av fersk torsk til EU Fangstutvikling Oppdrett av torsk Eskportutvikling torsk Prisutvikling Konkurrerende

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER

Detaljer

Emneevaluering GEOV272 V17

Emneevaluering GEOV272 V17 Emneevaluering GEOV272 V17 Studentenes evaluering av kurset Svarprosent: 36 % (5 av 14 studenter) Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet PhD Candidate Samsvaret mellom

Detaljer

PETROLEUM PRICE BOARD

PETROLEUM PRICE BOARD PETROLEUM PRICE BOARD Our reference Date OED 13/723 20.03.14 For Licensees on the Norwegian Continental Shelf NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 4 th QUARTER 2013 Pursuant

Detaljer

Has OPEC done «whatever it takes»?

Has OPEC done «whatever it takes»? Has OPEC done «whatever it takes»? Webinar Thina Margrethe Saltvedt, Chief Analyst Macro/Oil (Ph. D.) 29.05.2017 Brent oil price fell sharper than expected after May OPEC-meeting 58 56 USD 44-53/barrel

Detaljer

Generalization of age-structured models in theory and practice

Generalization of age-structured models in theory and practice Generalization of age-structured models in theory and practice Stein Ivar Steinshamn, stein.steinshamn@snf.no 25.10.11 www.snf.no Outline How age-structured models can be generalized. What this generalization

Detaljer

1.1 Norsk-arktisk torsk

1.1 Norsk-arktisk torsk 1.1 Norsk-arktisk torsk Bestanden er utenfor sikre biologiske grenser. I 22 er gytebestanden 27. tonn, mens totalbestanden er ca. 1.2 millioner tonn. Fisket Foreløpige oppgaver viser totale landinger av

Detaljer

Styringsgruppemøte Torskeprogrammet

Styringsgruppemøte Torskeprogrammet 1 Utgangspunkt Filetindustrien på Island og i Norge har i mange tiår produsert tilnærmet like produkter fra samme arter. Islandsk filetindustri er betraktet som sterk og lønnsom. Norsk filetindustri er

Detaljer

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau.

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau. CAMES Overskrift 27pt i to eller flere linjer Technical Skills Leizl Joy Nayahangan, RN, MHCM Leizl.joy.nayahangan@regionh.dk IMPORTANCE Challenges Brødtekst 22pt of patient skrives her care Increasing

Detaljer

Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi

Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi Øivind Ekeberg 5.september 2008 Akuttmedisinsk avdeling, Ullevål universitetssykehus Avdeling for atferdsfag, Universitetet

Detaljer

05/08/2002 Bugøynes. 16/08/2002 Bugøynes

05/08/2002 Bugøynes. 16/08/2002 Bugøynes FANGSTSEKSJONEN SENTER FOR MARINE RESSURSER TOKTRAPPORT Fartøy F/F Fangst Toktnummer 22 9 Prosjekttittel Seleksjon Konge krabbe Delprosjektnr. 627 Avgangsdato og sted Ankomststed og dato /8/22 Bugøynes

Detaljer

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015 1 PETROLEUM PRICE BO ARD Our reference Date OED 15/712 15/06/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

Accuracy of Alternative Baseline Methods

Accuracy of Alternative Baseline Methods Accuracy of Alternative Baseline Methods Dr. Steven Braithwait Christensen Associates Energy Consulting IEPEC - Paris June 2010 Outline Demand response & role of baseline loads Measures of baseline performance

Detaljer

PETROLEUM PRICE BOARD

PETROLEUM PRICE BOARD 1 PETROLEUM PRICE BOARD Our reference Date OED 15/712 21/09/2015 To the Licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

Environmental sensitivity. Assessment by MOIRA PLUS Lakes Øvre Heimdalsvatn (Norway) Bracciano (Italy)

Environmental sensitivity. Assessment by MOIRA PLUS Lakes Øvre Heimdalsvatn (Norway) Bracciano (Italy) Environmental sensitivity Assessment by MOIRA PLUS Lakes Øvre Heimdalsvatn (Norway) Bracciano (Italy) The lakes: Bracciano The lakes: Heimdalsvatn First step: model calibration (data of contamination following

Detaljer

Kjell Arne Mork, Francisco Rey, Henrik Søiland

Kjell Arne Mork, Francisco Rey, Henrik Søiland Argo data in the Norwegian Sea Kjell Arne Mork, Francisco Rey, Henrik Søiland Institute of Marine Research, Norway Euro-Argo User Workshop, Paris June 21 Outline Institute Marine Research s monitoring

Detaljer

// Translation // KLART SVAR «Free-Range Employees»

// Translation // KLART SVAR «Free-Range Employees» // Translation // KLART SVAR «Free-Range Employees» Klart Svar is a nationwide multiple telecom store, known as a supplier of mobile phones and wireless office solutions. The challenge was to make use

Detaljer

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort.

Du kan bruke det vedlagte skjemaet Egenerklæring skattemessig bosted 2012 når du søker om frikort. Skatteetaten Saksbehandler Deres dato Vår dato 28.10.2011 Telefon Deres Vår referanse For information in English see page 3 Skattekort for 2012 Du fikk helt eller delvis skattefritak ved likningen for

Detaljer

6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012

6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012 6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012 100 200 3000 0 0 0 13 38 63 88 113 138 163 4000 188 213 238 263 288 313 338 363 378 386 5000 394 402 410 417

Detaljer

På vei mot mindre stimulerende pengepolitikk. Katrine Godding Boye August 2013

På vei mot mindre stimulerende pengepolitikk. Katrine Godding Boye August 2013 På vei mot mindre stimulerende pengepolitikk Katrine Godding Boye August 2013 Krisen over (?) nå handler alt om når sentralbanken i USA vil kutte ned på stimulansene. Omsider noen positive vekstsignaler

Detaljer

Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko)

Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko) Alle flyr helikopter hva kan gjøres for å redusere støyen på kort og noe lengre sikt? (også noe om risiko) Erik Hamremoen Manager Flight Safety - Statoil Aktivitetsomfang innen olje- og gass sektoren Globalt

Detaljer

PETROLEUMSPRISRÅDET. Deres ref Vår ref Dato OED 18/

PETROLEUMSPRISRÅDET. Deres ref Vår ref Dato OED 18/ 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 18/763 19.10.2018 To the licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

PSi Apollo. Technical Presentation

PSi Apollo. Technical Presentation PSi Apollo Spreader Control & Mapping System Technical Presentation Part 1 System Architecture PSi Apollo System Architecture PSi Customer label On/Off switch Integral SD card reader/writer MENU key Typical

Detaljer

Søker du ikke om nytt frikort, vil du bli trukket 15 prosent av din pensjonsutbetaling fra og med januar 2014.

Søker du ikke om nytt frikort, vil du bli trukket 15 prosent av din pensjonsutbetaling fra og med januar 2014. Skatteetaten Saksbehandler Deres dato Vår dato 31.10.2013 Telefon Deres referanse Vår referanse For information in English see page 3 Skattekort for 2014 Du fikk helt eller delvis skattefritak ved likningen

Detaljer

Slope-Intercept Formula

Slope-Intercept Formula LESSON 7 Slope Intercept Formula LESSON 7 Slope-Intercept Formula Here are two new words that describe lines slope and intercept. The slope is given by m (a mountain has slope and starts with m), and intercept

Detaljer

Skiskole side 2. Pr. pers. 3 dager/3 days 885 4 dager/4 days NY/NEW 995 5 dager/5 days NY/NEW 1090

Skiskole side 2. Pr. pers. 3 dager/3 days 885 4 dager/4 days NY/NEW 995 5 dager/5 days NY/NEW 1090 Skiskole Side 1 Priser Snowsports Skeikampen vinter 2013/2014. Individuelle gjester. Prices Snowsports Skeikampen winter 2013/2014. Individual guests. Gruppeundervisning, voksne, ungdom og Fjellbandidos

Detaljer

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 2 nd QUARTER 2013

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 2 nd QUARTER 2013 PETROLEUM PRICE BO ARD Our reference Date OED 13/723 11.10.13 For Licensees on the Norwegian Continental Shelf NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 2 nd QUARTER 2013 Pursuant

Detaljer

Endelig ikke-røyker for Kvinner! (Norwegian Edition)

Endelig ikke-røyker for Kvinner! (Norwegian Edition) Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Click here if your download doesn"t start automatically Endelig ikke-røyker for Kvinner! (Norwegian Edition) Allen Carr Endelig ikke-røyker

Detaljer

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa UNDERWRITING LIMITS The following tables show our financial and medical underwriting limits effective from 07 July 2017. FINANCIAL LIMITS Protection Financial evidence requirements Additional financial

Detaljer

Medisinsk statistikk, KLH3004 Dmf, NTNU 2009. Styrke- og utvalgsberegning

Medisinsk statistikk, KLH3004 Dmf, NTNU 2009. Styrke- og utvalgsberegning Styrke- og utvalgsberegning Geir Jacobsen, ISM Sample size and Power calculations The essential question in any trial/analysis: How many patients/persons/observations do I need? Sample size (an example)

Detaljer

Forecast Methodology September LightCounting Market Research Notes

Forecast Methodology September LightCounting Market Research Notes Forecast Methodology September 2015 LightCounting Market Research Notes Vladimir Market Kozlov Forecast Methodology, September, September, 2015 2015 1 Summary In summary, the key assump=on of our forecast

Detaljer

SUPPLIER UPDATE. September 23, 2015

SUPPLIER UPDATE. September 23, 2015 1 SUPPLIER UPDATE September 23, 2015 Agenda 2 Clarify and document Supplier Collateral Requirement New Customer Information Agreement Review Customer Education campaign Q&A Credit Requirements For Suppliers

Detaljer

Astro Calendar 2002 v 1.00 by Yasuji Yamanaka

Astro Calendar 2002 v 1.00 by Yasuji Yamanaka Astro Calendar 2002 v 1.00 by Yasuji Yamanaka n225 17 F 8-16 18:25 n2 18 S 8-16 tr2 ** 19 S 8-16 PNM bull ** 11:56 17:53 JPY 20 M 8-16 SELL SELL # [Date] Each day separates into every 8 hours by GMT. Coloring

Detaljer

Leif Nøttestad Havforskningsinstituttet

Leif Nøttestad Havforskningsinstituttet Makrellstørja, selveste kongen på haugen av fiskeartene på kloden, er nå tilbake i norske farvann! Leif Nøttestad Havforskningsinstituttet Fakta om makrellstørje Makrellstørje (Thunnus thynnus), også kalt

Detaljer

Boligboble fortsatt lave renter? Trondheim 7. mars 2013

Boligboble fortsatt lave renter? Trondheim 7. mars 2013 Boligboble fortsatt lave renter? Trondheim. mars 201 Hvorfor diskuterer vi en boligboble i Norge? 9 9 % å/ å % 8 8 Boligrente > >

Detaljer

THE MONTH THE DISCIPLINE OF PRESSING

THE MONTH THE DISCIPLINE OF PRESSING THE MONTH THE DISCIPLINE OF PRESSING Nehemiah 4:1-9 NIV 1 [a ] When Sanballat heard that we were rebuilding the wall, he became angry and was greatly incensed. He ridiculed the Jews, 2 and in the presence

Detaljer

Søker du ikke om nytt frikort/skattekort, vil du bli trukket 15 prosent av utbetalingen av pensjon eller uføreytelse fra og med januar 2016.

Søker du ikke om nytt frikort/skattekort, vil du bli trukket 15 prosent av utbetalingen av pensjon eller uføreytelse fra og med januar 2016. Skatteetaten Saksbehandler Deres dato Vår dato 26.10.2016 Telefon Deres Vår referanse For information in English see page 3 Skattekort for 2016 Du fikk helt eller delvis skattefritak ved likningen for

Detaljer

Cayman Aggressor IV (Best of the Cayman Islands Itinerary: 7 nights)

Cayman Aggressor IV (Best of the Cayman Islands Itinerary: 7 nights) Tell : +47 22413030 Epost : felles@reisebazaar.no Web : www.reisebazaar.no Dronningensgate 23, 0154 Oslo, Norway Cayman Aggressor IV (Best of the Cayman Islands Itinerary: 7 nights) Turkode 27453 Turen

Detaljer

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør

Detaljer

IPTV Forum. January 2007

IPTV Forum. January 2007 IPTV Forum January 7 Agenda VTR & Telecom Industry What is VTR? Chilean telecom industry Competitive environment VTR & Digital TV What is D-box? VTR Digital TV Chilean digital TV market VOD: VTR on Demand

Detaljer

1 Øvelse Dynamic Mercy 1 Exercise Dynamic Mercy

1 Øvelse Dynamic Mercy 1 Exercise Dynamic Mercy AIP NORGE / NORWAY ENR 5.3-1 ENR 5.3 Andre aktiviteter forbundet med fare ENR 5.3 Other activities of a dangerous nature 1 Øvelse Dynamic Mercy 1 Exercise Dynamic Mercy En periodisk redningsøvelse (SAR)

Detaljer

Rapporterer norske selskaper integrert?

Rapporterer norske selskaper integrert? Advisory DnR Rapporterer norske selskaper integrert? Hvordan ligger norske selskaper an? Integrert rapportering er å synliggjøre bedre hvordan virksomheten skaper verdi 3 Norske selskaper har en lang vei

Detaljer

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa

(see table on right) 1,500,001 to 3,000, ,001pa to 250,000pa UNDERWRITING LIMITS The following tables show our financial and medical underwriting limits effective from 11 April 2016. FINANCIAL LIMITS Protection Financial evidence requirements Additional financial

Detaljer

Levende marine ressurser i nord. UD aspirantkurs 21 februar 2007 Rasmus Hansson, Maren Esmark WWF- Norge

Levende marine ressurser i nord. UD aspirantkurs 21 februar 2007 Rasmus Hansson, Maren Esmark WWF- Norge Levende marine ressurser i nord UD aspirantkurs 21 februar 2007 Rasmus Hansson, Maren Esmark WWF- Norge Fysiske forutsetninger Store områder Store periodiske variasjoner Store uforutsigbare variasjoner

Detaljer

Exercise 1: Phase Splitter DC Operation

Exercise 1: Phase Splitter DC Operation Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 3rd quarter 2017

PETROLEUMSPRISRÅDET. NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 3rd quarter 2017 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 17/946 15.12.2017 To the licensees on the Norwegian Continental Shelf (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL

Detaljer

EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering

EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering EFPIA Disclosure Code - Kort introduksjon og spørsmål til implementering Kari Heimholt EFPIA Implementation Lead, Sverige, Finland & Norge Pfizer AS 3 mai 2016 Building trust and earning greater respect

Detaljer

0100 Månedstabell/Month table Trekktabell 2010

0100 Månedstabell/Month table Trekktabell 2010 0100 Månedstabell/Month table Trekktabell 2010 Klasse / Class 1 For skatt av sjømannsinntekt med 10% standardfradrag, 30% sjømannsfradrag Trekk- 0 100 200 300 400 500 600 700 800 900 gr.lag 100 200 Tabellen

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene

Detaljer

Astro Calendar 2001 v 1.03 by Yasuji Yamanaka

Astro Calendar 2001 v 1.03 by Yasuji Yamanaka Astro Calendar 2001 v 1.03 by Yasuji Yamanaka 17 F 8-16 h * 18:25 18 S 8-16 tr2 ** 19 S 8-16 PNM bull ** 11:56 17:53 JPY(20-22) 20 M 8-16 SELL SELL # [Date] Each day separates into every 8 hours by JST.

Detaljer

International Marine Fish Seminar

International Marine Fish Seminar International Marine Fish Seminar Surviving in a weak market YES WE CAN! August 19th 2009 Harald Dahl, COB Historical key assumptions for building the business 1. MARKET PRICE : Farmed cod prices remained

Detaljer

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 3rd QUARTER 2015

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 3rd QUARTER 2015 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 15/712 07/12/2015 Til rettighetshaverne på norsk sokkel (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 3rd

Detaljer

Ekstraordinær generalforsamling HAVFISK ASA

Ekstraordinær generalforsamling HAVFISK ASA Ekstraordinær generalforsamling HAVFISK ASA Ålesund 3. oktober 2016 kl. 1000 HAVFISK ASA Dagsorden 1. Åpning og konstituering av generalforsamlingen, herunder valg av en person til å medundertegne protokollen

Detaljer

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 07.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 Pursuant

Detaljer

Mål med prosjektet. proactima.com. Utvikle, markedsføre og selge den beste løsningen for Risikostyring og HMS ledelse for det globale markedet

Mål med prosjektet. proactima.com. Utvikle, markedsføre og selge den beste løsningen for Risikostyring og HMS ledelse for det globale markedet UXRisk PREPARED. Tema Målet med prosjektet hvilke utfordringer skulle løses Erfaringer fra samarbeid med et internasjonalt selskap Involvering av kunder Hvor er dere i dag. Erfaringer med Innovasjon Norge

Detaljer

Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner

Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner Familieeide selskaper - Kjennetegn - Styrker og utfordringer - Vekst og nyskapning i harmoni med tradisjoner Resultater fra omfattende internasjonal undersøkelse og betraktninger om hvordan observasjonene

Detaljer

0100 Månedstabell/Month table Trekktabell 2013

0100 Månedstabell/Month table Trekktabell 2013 0100 Månedstabell/Month table Trekktabell 2013 Klasse / Class 1 For skatt av sjømannsinntekt med 10% standardfradrag, 30% sjømannsfradrag Trekk- 0 100 200 300 400 500 600 700 800 900 0 0 0 0 0 0 0 0 0

Detaljer

The CRM Accelerator. USUS February 2017

The CRM Accelerator. USUS February 2017 The CRM Accelerator USUS February 2017 The CRM Accelerator n To start conversations about CRM n To stimulate experiments with aspects of CRM n To share ideas n To learn and pass on experiences and knowledge

Detaljer

Horisont 2020 EUs forsknings- og innovasjonsprogram. Brussel, 6. oktober 2014 Yngve Foss, leder, Forskningsrådets Brusselkontor

Horisont 2020 EUs forsknings- og innovasjonsprogram. Brussel, 6. oktober 2014 Yngve Foss, leder, Forskningsrådets Brusselkontor Horisont 2020 EUs forsknings- og innovasjonsprogram Brussel, 6. oktober 2014 Yngve Foss, leder, Forskningsrådets Brusselkontor Min presentasjon Bakgrunn for Horisont 2020 Oppbygning Prosjekttyper Muligheter

Detaljer

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

Hvordan føre reiseregninger i Unit4 Business World Forfatter: Hvordan føre reiseregninger i Unit4 Business World Forfatter: dag.syversen@unit4.com Denne e-guiden beskriver hvordan du registrerer en reiseregning med ulike typer utlegg. 1. Introduksjon 2. Åpne vinduet

Detaljer

7 years as museum director at the Röhsska Museum, Göteborg. since February 2012 the museum director at the Sigtuna Museum, Sthlm

7 years as museum director at the Röhsska Museum, Göteborg. since February 2012 the museum director at the Sigtuna Museum, Sthlm 15 years in the advertising business 7 years as museum director at the Röhsska Museum, Göteborg since February 2012 the museum director at the Sigtuna Museum, Sthlm maksimere strategisk utviklingsplan

Detaljer

ÅPNE OVERVANNSLØSNINGER. Hvorfor åpne overvannsløsninger? Johan Steffensen

ÅPNE OVERVANNSLØSNINGER. Hvorfor åpne overvannsløsninger? Johan Steffensen ÅPNE OVERVANNSLØSNINGER Hvorfor åpne overvannsløsninger? Større kapasitet mht vannføringsvariasjoner, flom, etc. Ressurs for opplevelse, lek og biologisk mangfold Normalt billigere, og lavere driftskostnader?

Detaljer

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6.

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. Administrasjon av postnummersystemet i Norge Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 Postnumrene i Norge ble opprettet 18.3.1968 The postal codes in Norway was established in

Detaljer

Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt. Wenche Koldingsnes

Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt. Wenche Koldingsnes Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt Wenche Koldingsnes Skåring av sykdomsaktivitet og skade I oppfølging av pasienter med vaskulitt er vurdering og konklusjon vedr. sykdomsaktivitet

Detaljer

Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler

Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler UNIVERSITETET I OSLO INF1300 Introduksjon til databaser Dagens tema: Eksempel Klisjéer (mønstre) Tommelfingerregler Institutt for informatikk Dumitru Roman 1 Eksempel (1) 1. The system shall give an overview

Detaljer

Monitoring water sources.

Monitoring water sources. Monitoring water sources. Generell Informasjon Versjon 2 Url http://com.mercell.com/permalink/38336681.aspx Ekstern anbuds ID 223314-2013 Konkurranse type: Tildeling Dokument type Kontraktstildeling Prosedyre

Detaljer

Astro Calendar '99 v 1.08 by Yasuji Yamanaka

Astro Calendar '99 v 1.08 by Yasuji Yamanaka Astro Calendar '99 v 1.08 by Yasuji Yamanaka 8-16 1 NM bullish * 17/ 18:49-18/ 00:14 18 T 8-16 0D 1 * ## *** 19/ 01:08-20/ 01:10 19 F 8-16 1 Merri.JY 20 S 8-16 2 SELL SELL ing SELL # [Date] Each day separates

Detaljer

The Future of Academic Libraries the Road Ahead. Roy Gundersen

The Future of Academic Libraries the Road Ahead. Roy Gundersen The Future of Academic Libraries the Road Ahead Roy Gundersen Background Discussions on the modernization of BIBSYS Project spring 2007: Forprosjekt modernisering Process analysis Specification Market

Detaljer

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3 Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL

Detaljer

Norwegian Seafood Export Council EKSPORTUTVALGET FOR FISK

Norwegian Seafood Export Council EKSPORTUTVALGET FOR FISK Mar Mar Apr Apr Mai May Jun Jun Jul Jul Aug Aug Sept Sept Okt Oct Nov Nov Des Dec Norwegian Seafood Export Council Feb Feb EKSPORTUTVALGET FOR FISK Jan Jan Eksportutviklingen i Export trends for Norsk

Detaljer

Ny personvernlovgivning er på vei

Ny personvernlovgivning er på vei Ny personvernlovgivning er på vei Er du forberedt? 27. september 2017 There are lines you cannot cross. There are rules to the game. But within the lines and following the rules, you are only limited by

Detaljer

PRINCE2. Projects In Controlled Environments v2

PRINCE2. Projects In Controlled Environments v2 PRINCE2 Projects In Controlled Environments v2 A temporary organization that is created for the purpose of delivering one or more business s according to an agreed Business Case Time = Days, weeks, months

Detaljer

September 2013 Absorption Report

September 2013 Absorption Report Highlights l In the beginning of September, there was a 3.3-month supply of apartments for sale in Manhattan, down from 4.2 months in August. l A year ago the absorption rate was 5.2 months. l Inventory

Detaljer

Databases 1. Extended Relational Algebra

Databases 1. Extended Relational Algebra Databases 1 Extended Relational Algebra Relational Algebra What is an Algebra? Mathematical system consisting of: Operands --- variables or values from which new values can be constructed. Operators ---

Detaljer

Etter selskapets ordinære generalforsamling den 24. mai 2017 består styret av følgende aksjonærvalgte styremedlemmer:

Etter selskapets ordinære generalforsamling den 24. mai 2017 består styret av følgende aksjonærvalgte styremedlemmer: Valgkomiteens innstilling til ordinær generalforsamling i Insr Insurance Group ASA den 23. mai 2018 Med utgangspunkt i valgkomiteens mandat og instruks legger komiteen frem følgende forslag for beslutning

Detaljer

Note 39 - Investments in owner interests

Note 39 - Investments in owner interests Note 39 - Investments in owner interests Subsidiaries, associates, joint ventures and companies held for sale. Company Company number Registered fice Stake in per cent Investment in significant subsidiaries

Detaljer

INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS)

INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS) INFO TAXI REMOTE Taxi Management CONTROL SYSTEM (TMCS) November 2015 taxi remote taxi remote I Taxi Management Control System registreres taxier med en transponderbrikke festet til frontruten. Brikken

Detaljer

FIRST LEGO League. Härnösand 2012

FIRST LEGO League. Härnösand 2012 FIRST LEGO League Härnösand 2012 Presentasjon av laget IES Dragons Vi kommer fra Härnosänd Snittalderen på våre deltakere er 11 år Laget består av 4 jenter og 4 gutter. Vi representerer IES i Sundsvall

Detaljer

Ny forvaltningsplan for rekebestanden i Skagerrak og Norskerennen

Ny forvaltningsplan for rekebestanden i Skagerrak og Norskerennen Ny forvaltningsplan for rekebestanden i Skagerrak og Norskerennen SEMINAR OM UTKASTREDUSERENDE TILTAK I FISKE MED REKETRÅL Fredrikstad 2. september 2016 Guldborg Søvik, Daniel Howell, Cecilie Hansen, Bjarte

Detaljer

buildingsmart Norge seminar Gardermoen 2. september 2010 IFD sett i sammenheng med BIM og varedata

buildingsmart Norge seminar Gardermoen 2. september 2010 IFD sett i sammenheng med BIM og varedata buildingsmart Norge seminar Gardermoen 2. september 2010 IFD sett i sammenheng med BIM og varedata IFD International Framework for Dictionaries Hvordan bygges en BIM? Hva kan hentes ut av BIM? Hvordan

Detaljer

Aksjemarkedet i perspektiv

Aksjemarkedet i perspektiv Aksjemarkedet i perspektiv ODIN Konferansen 2009 Jarl Ulvin Investeringsdirektør ODIN Forvaltning AS Oslo Børs (OSEBX) 2000-2009 Indeks (logaritmisk) Vi har sett det største fallet i aksjekurser siden

Detaljer

Cylindrical roller bearings

Cylindrical roller bearings Cylindrical roller bearings Cylindrical roller bearings 292 Definition and capabilities 292 Series 292 Variants 293 Tolerances and clearances 294 Design criteria 296 Installation/assembly criteria 297

Detaljer

NRF Full 2012 Schedule

NRF Full 2012 Schedule NRF Full 2012 Schedule Understanding the schedule Saturday Sunday Wednesday 3-Mar 4-Mar 7-Mar March 10-Mar 11-Mar 14-Mar 17-Mar 18-Mar 21-Mar 24-Mar 25-Mar 28-Mar 31-Mar 1-Apr 4-Apr 7-Apr 8-Apr 11-Apr

Detaljer

Sak 19/2015. Orientering om fisket etter breiflabb

Sak 19/2015. Orientering om fisket etter breiflabb Sak 19/215 Orientering om fisket etter breiflabb 1. Sammendrag Den norske totalfangsten av breiflabb har etter 21 hatt en jevn, kraftig nedgang. I 214 var totalfangsten på ca. 2 3 tonn. Det er 4 tonn mindre

Detaljer

Reliable RT processing @ Spotify

Reliable RT processing @ Spotify Reliable RT processing @ Spotify Pablo Barrera February 5, 2014 Spotify 3 Spotify the right music for every moment over 6 million paying customers over 24 million active users each

Detaljer

Hva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det

Hva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det Hva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det Tone M. Muthanna Associate Professor Department of Hydraulic and Environmental Engineering NTNU 20% 10% (Lindholm, 2012)

Detaljer

Arctic Securities. 5. desember 2007

Arctic Securities. 5. desember 2007 Arctic Securities 5. desember 2007 Behandling av kraftkontrakter er regulert av regnskapsstandarden IAS 39 Hovedregel er at denne typen ikke-finansielle kontrakter skal inkluderes i regnskapet til virkelig

Detaljer

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers

Detaljer

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Nordisk Adressemøte / Nordic Address Forum, Stockholm 9-10 May 2017 Elin Strandheim,

Detaljer

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no Public roadmap for information management, governance and exchange 2015-09-15 SINTEF david.norheim@brreg.no Skate Skate (governance and coordination of services in egovernment) is a strategic cooperation

Detaljer

Gjenopprettingsplan DNBs erfaringer. Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017

Gjenopprettingsplan DNBs erfaringer. Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017 Gjenopprettingsplan DNBs erfaringer Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017 Lik konkurranse krever full harmonisering av systemet Like definisjoner Konsistent bruk

Detaljer

GEOV219. Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet postbachelor phd

GEOV219. Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet postbachelor phd GEOV219 Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet postbachelor phd Mener du at de anbefalte forkunnskaper var nødvendig? Er det forkunnskaper du har savnet? Er det forkunnskaper

Detaljer

Fagevalueringsrapport FYS Diffraksjonsmetoder og elektronmikroskopi

Fagevalueringsrapport FYS Diffraksjonsmetoder og elektronmikroskopi Fagevalueringsrapport FYS4340 - Diffraksjonsmetoder og elektronmikroskopi Fall 08 Lecturer:Arne Olsen and Anette Eleonora Gunnæs Fysisk Fagutvalg 4. november 2008 Fagutvalgets kommentar: Fysisk fagutvalg

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING E-postmaler til bruk ved utsendelse av fremdriftsrapportering ph.d.- kandidater og veiledere TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: Kjære

Detaljer

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET.

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INGVE SØRFONN 1 THE FUTURE IS NOW! 2 FROM PRODUCT TO ECOSYSTEM 3 READY

Detaljer