SafeRing / SafePlus Retrofit capacitive voltage indication type VDS C, F, De and V Modules

Like dokumenter
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module

SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module

SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module

SafeRing / SafePlus Retrofit of under voltage coil V Module

SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules

SafeRing / SafePlus Retrofit of capacitive voltage indication type VPIS C, De, F and V Modules

SafeRing / SafePlus Retrofit of Y4 or Y5 relay trip coil V Module

SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock type EL11AP C, De, F and Sl modules

Safering / Safeplus Retrofit of Ronis key for load break switch Interlock type EL11AP C and Sl modules

SafeRing / SafePlus Retrofit of opening coil Y1 and auxiliary switch S7 F, C and SI Modules with latched mechanism

Safering / Safeplus Retrofit of Ronis key for earthing switch Interlock type EL11AP V and Sv modules

SafeRing / SafePlus Retrofit of Y6 relay trip coil V Module

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

Handicare Emineo Ledsagerbrems Basic / Drum brake Basic

Start Here USB *CC * *CC * USB USB

KAMPANJE APK : APK-8: Bytte bakaksel bolter

Mounting the electrically elevating legrest

Windlass Control Panel

MONTASJEBESKRIVELSE INSTALLATION GUIDE

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

Monteringsanvisning. Assembly instructions. Ledsagerbrems / Drum brake. Artikkelnummer/ Item no.

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

KAMPANJE APK : APK-5: Skifte pakninger mellom turbo og CCDPF

Replacing the tube and/or tyre of a drive wheel, indoor/outdoor

bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly

Replacing the carbon brushes

SERVICE BULLETINE

IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM!

bondura dual 36 Ø50mm - Ø200mm assembly & inspection manual art rev A

Replacing the batteries

Fitting instruction. devi-pipeheat / devi-flexheat Assembly between cold tail and selflimiting. Montering av tilledning på selvbegrensende varmekabel

MAINTENANCE INSTRUCTION FOR RELEASE HOOK

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

Justeringsanvisninger finnes på de to siste sidene.

Monteringsanvisning Installation manual Taksokkel for LHH og CareLite Ceiling mount for LHH and CareLite

KAMPANJE AZG : Skifte bolter reimhjul

Du vil trenge: Umbraco Nøkkel (Inkludert); Skiftnøkkel/Fastnøkkel sett (For styrestem bolten og de 4 styreboltene),pumpe

Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter

TB-615 / TB-617 Wireless slim keyboard. EN User guide SE Användarhandledning FI Käyttöohje DK Brugervejledning NO Bruksanvisning

Instruksjons manual Instruction manual

MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE

2. Sett pa ny laseplate og skru inn skruene. Merk at skruen under lasebolten er lenger enn de andre. Bruk Locktite 243 pa hver skrue.

Endelig ikke-røyker for Kvinner! (Norwegian Edition)

KROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal.

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

EMS 1. Music Streamer. Owner's Manual

Norsk (English below): Guide til anbefalt måte å printe gjennom plotter (Akropolis)

Independent Inspection

Dynamic Programming Longest Common Subsequence. Class 27

JBV DSB godkjenninger

Monteringsanvisning Assembly Instructions Monteringsanvisning. Søve Lekemiljø AS 3830 Ulefoss - Norway Tlf:

GIMOTA AG. Assembly Instructions Dataconnectors D-SUB. Datenstecker Katalog Gimota AG 04/14 3

Safety a t t h e f A c t o r y

Vedlegg 2 Dokumentasjon fra TVM leverandør

Trådløsnett med Windows XP. Wireless network with Windows XP

Tema Fusion Monteringsanvisning

bondura Multi Tool 200

Exercise 1: Phase Splitter DC Operation

Information search for the research protocol in IIC/IID

Product Facts. Product code example

Purus Line Vinyl Plus

Midnight BBQ Light USER MANUAL

BRUKERMANUAL for Exerfit 240 Rower

Christmas in the round A Holiday Prism for Band. Preview Only

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

EcoNordic. Flexit GO ART.NR , MONTERINGSVEILEDNING Spjeld. MONTERINGANVISNING Spjäll

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

ALUMINUM TWIN STACK PORTABLE AIR COMPRESSOR OL50135AL OPERATOR S MANUAL

Bruksanvisning Modell I-440 Spesialutgave. for brukere med vekt opp til 200 kg

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

Montering av Lian Skyvedør Installation of Lian Sliding Door

HONSEL process monitoring

- Vennlig hilsen gründerne bak retyre

En praktisk innføring i team-basert læring

AC10. Brukermanual Brugsanvisning Bruksanvisning User Manual. Spenningsdetektor Voltage Detector. English Norsk

Certificates of Release to Service(CRS)

GIMOTA AG. Assembly Instructions Dataconnectors DIN F. Datenstecker Katalog Gimota AG 04/14

Existing Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42

Elektronisk innlevering/electronic solution for submission:

Trigonometric Substitution

Utøver går med feil lårnummer (og riktig startnummmer/brikke).

Institutt for biovitenskap

KAMPANJE AKK : Skifte setetrekk forseter

EPIC MODELL A. INR guarantees product function if the industry regulations and the installation instruction are followed.

2. DRIVING GEAR COMP 3. SIDE COVER COMP 4. RIGHT COVER COMP 5. FAN / WIND GUIDE COVER 6. ELECTRIC START SYSTEM

Slope-Intercept Formula

Den som gjør godt, er av Gud (Multilingual Edition)

CSR Harvesting Final Meeting September, 2015 Brest, France. Anne Che-Bohnenstengel & Matthias Pramme, BSH

KAMPANJE APK : APK-4: Kontroll montering EGT-2

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

229 SONATA Manual NO_ENG 1.04

MCP-16RC, luftrenertårn

Windows Server 2008 Hyper-V, Windows Server 2008 Server Core Installation Notes

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

Bærekraftig FM til tiden/ Bærekraftig FM på tid

Quality audit of aircraft i Part-M og Part-145

User manual English Svenska Norsk

Transkript:

We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties without SafeRing / SafePlus Retrofit capacitive voltage indication type VDS C, F, De and V Modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-11 BJGU/GUSO Checked NODIS 2008-12-16 MARE Approved NODIS 2008-12-16 OLGR Title SAFERING / SAFEPLUS RETROFIT OF CAPACITIVE VOLTAGE INDICATION TYPE VDS C, F AND De MODULE Language EN/NO 1/14

General Safety Instructions! - Check that the installation, putting into service and maintenance of this apparatus is carried out by qualified personnel with knowledge of the apparatus to be installed. All the procedures as laid out in this installation and service instruction manual must be known. - To perform the following installation requires a vocational training (electrician, electrical engineer) and some years of experience. - Make sure the standard and legal prescriptions are adhered to during the installation, putting into service and maintenance. All procedures must be carried out in strict compliance to the rules of good working practice and safety at the work site. - Please read this instruction manual and plan the work before starting the installation. - Strictly follow the information given in this instruction manual. - Pay special attention to the danger notes as indicated in this manual by the following symbol: - Check and ensure that the personnel operating the apparatus have the instruction manual at hand, as well as the necessary information for correct installation. - Before starting the retrofit upgrade the switchgear must be de-energized. The switchgear is de-energized by operating the switches to disconnected position. - Check that all mechanism springs are discharged. If in doubt, close and open the switch. 2/14

Sikkerhetsinstruks! - Sørg for at installasjon, idriftsettelse og vedlikehold er utført av kvalifisert personell som har kjennskap til utstyret som blir installert. Vedkommende må også kjenne til prosedyrer som er beskrevet i dette installasjonsheftet. - For å utføre følgende installasjon kreves yrkesfaglig erfaring som elektriker, elektroingeniør eller liknende. - Sørg for at sikkerheten rundt installasjonsarbeidet er ivaretatt i henhold til nasjonale normer og forskrifter. Arbeidet utføres av en fagperson. - Les manualen nøye før arbeidet påbegynnes. - Utfør installasjonen nøyaktig som beskrevet i denne manualen. - Vær spesielt nøye med å lese og følge anvisninger når det er indikert med fare symbolet: - Sørg for at betjeningspersonell har dette installasjonsheftet og har fått nødvendig informasjon når de betjener det installerte utstyret. - Før installasjonen påbegynnes, sørg for at avgangen det skal jobbes på er strømløs og at bryterne er utkoblet. - Alle fjærer på mekanismene må være avspent. For å forsikre seg om dette kan bryteren lukkes og åpnes. 3/14

Installation procedure NB! Before starting the retrofit upgrade the switchgear must be de-energized Earthing switch must be in closed position and the other switches in open position OBS! Sørg for at avgangen det skal jobbes på er strømløs Jordslutter skal være innkoblet mens de andre bryterne skal være utkoblet 1. Unscrew the fixing screws and remove the cable compartment cover. If the module is arc proof, the arc absorber must be unscrewed Løsne festeskruene og fjern kabelavdekningen Dersom feltet er lysbuesikkert, må brennplaten skrues av If the module is equipped with capacitive voltage indication, move on to appendix A Dersom feltet har kapasitiv spenningsindikering fra før av, gå til appendix A 4/14

Existing front covers Dagens frontdeksler Used until May 2007 Brukt inntil mai 2007 2. Unscrew the dummy cover Skru av blinddekselet 3 3. Unscrew both ends of the earth conductor connected to each cable bushing Løsne begge endene av jordledningene som er tilkoblet kabelgjennomføringene 5/14

4 Special spanner is needed Spesialfastnøkkel må benyttes 4. Fix 1 piece of special brass screw in each cable bushing NB! Do not fix the screws too tight, as it is easy to damage the threads! Skru 1 stk spesialskrue i messing i hver av kabelgjennomføringene OBS! Skruene må ikke tiltrekkes for hardt, da det er lett å overdra gjengene i gjennomføringingene! 5. Unscrew the fixing screw and remove the upper front cover Open the lower front cover Løsne festeskruen og fjern det øvre fontdekselet Åpne nedre frontdeksel 6. Guide the coaxial cables through the hole in the horizontal partition wall Press the sealing plug into the hole. Før koaksialkablene gjennom hullet i den horisontale deleveggen Trykk tetningspluggen fast i hullet 6 IEC 61243-5 VDS L1 L2 L3 A- A 6/14

Toothed washer Tannskive Spring washer Fjærskive Do not loosen! Ikke løsne! 7 7. Fix the earth conductor to existing bolt Consult the figure for the sequence of the parts Fest jordledningen til eksisterende bolt Se figur for delenes rekkefølge 8. Insert the o-ring into the connection piece of the coaxial cable NB! Check that the conductor is visible Plasser o-ringen inni koaksialkabelens tilkoblingshylse OBS! Pass på at lederen er synlig 9. Screw the coaxial cables to the special brass screws on the cable bushings NB! Make sure that the phase sequence is correct! L1 9 L2 L3 B B Skru koaksialkablene på messingskruene på gjennomføringene NB! Påse at faserekkefølgen er riktig! B - B 7/14

10. Fix the cables between cable bushings and sealing plug with cable ties and attachment Fest ledningene mellom gjennomføringene og tetningspluggen med strips og stripsfeste 11. Guide the voltage indicator to the rear side of the bracket, and fix it using 2 special screws Før spenningsindikatoren til baksiden av festebraketten og fest den med 2 spesialskruer 8/14

C, F and De module 12. Fix cables with cable ties Use attachment for cable ties if no holes are available Fest ledningene med strips Bruk stripsfeste hvis det ikke er noen tilgjengelige hull V module Gather the cables with cable ties Samle ledningene med strips 13. If the module is a V module, move on to the next step If not, gather the cables with cable ties Dersom feltet er et V-felt, gå videre til neste punkt Hvis ikke, samle ledningene med strips 14. Re-place and fix the front covers Sett tilbake og fest frontdekslene 9/14

Appendix A For modules equipped with capacitive voltage indication For felt utstyrt med kapasitiv spenningsindikering Existing front covers Dagens frontdeksler Used until May 2007 Brukt inntil mai 2007 2. Unscrew the fixing screw and remove the upper front cover Open the lower front cover Løsne festeskruen og fjern det øvre frontdekselet. Åpne nedre frontdeksel 10/14

Toothed washer Tannskive Spring washer Fjærskive Do not loosen! Ikke løsne! 3 3. Unscrew the outermost nut and remove the old earth conductor and any washers now loose Skru av den ytterste mutteren og fjern den gamle jordledningen og alle skiver som nå er løse 4. Unscrew the coaxial cables from the brass screws on the cable bushings Skru koaksialkablene av messingsskruene på gjennomføringene 4 5. Unscrew the 2 screws holding the voltage indicator Remove the old voltage indicator and its cables Skru av skruene som holder spenningindikatoren Fjern spenningsindikatoren og tilhørende ledninger 5 11/14

6. Guide the coaxial cables from the new voltage indicator through the hole in the horizontal partition wall Press the sealing plug into the hole Før koaksialkablene fra den nye spenningsindikatoren gjennom hullet i den horisontale deleveggen Trykk tetningspluggen fast i hullet Toothed washer Tannskive Spring washer Fjærskive Do not loosen! Ikke løsne! 7 7. Fix the earth conductor to existing bolt Consult the figure for the sequence of the parts Skru fast jordledning til eksisterende bolt Se på figuren for delenes rekkefølge 8. Insert the o-rings into the connection piece of the coaxial cables NB! Check that the conductor is visible Plasser o-ringene inni koaksialkablenes tilkoblingshylse OBS! Pass på at lederen er synlig 12/14

L1 L2 L3 9. Screw the coaxial cables onto the brass screws on the cable bushings NB! Make sure that the phase sequence is correct! Skru koaksialkablene på messingskruene på gjennomføringene OBS! Påse at faserekkefølgen er riktig! 10 9 B - B B B 10. Fix the cables between cable bushings and sealing plug with cable ties and attachment Fest ledningene mellom gjennomføringene og tetningspluggen med strips og stripsfeste VDS IEC 61243-5 L1 L2 L3 L1 L2 L3 VDS (HR) Voltage range: 6-12 kv C- C 11. Guide the voltage indicator to the rear side of the bracket, and fix it using 2 special screws Før spenningsindikeringen til baksiden av festebraketten og fest den med 2 spesialskruer 13/14

C, F and De module 12. Fix cables with cable ties Use attachment for cable ties if no holes are available Fest ledningene med strips Bruk stripsfeste hvis det ikke er noen tilgjengelige hull V module Gather the cables with cable ties Samle sammen ledningene med strips 13. If the module is a V module, move on to the next step If not, gather the cables with cable ties Dersom feltet er et V-felt, gå videre til neste punkt Hvis ikke, samle ledningene med strips 14. Re-place and fix the front covers Sett tilbake og fest de to frontdekslene 14/14