Passenger Terminal World Expo 2011 Copenhagen, Denmark. Steven B. Cornell Assoc. Vice President

Like dokumenter
Accuracy of Alternative Baseline Methods

FirstEnergy s Ohio Utilities. Energy Efficiency Programs for Business

System. Issues ACHD ACHD. Transportation-Land Use Integration Plan (TLIP) The Current. Current Outcomes & Stakeholder Workshop Agenda

SUPPLIER UPDATE. September 23, 2015

HONSEL process monitoring

Little Mountain Housing

Invitation to Tender FSP FLO-IKT /2013/001 MILS OS

SHORE POWER CONVERTER LIST 2018

2018 ANNUAL SPONSORSHIP OPPORTUNITIES

JIM BARKER ?????????? ????? ??????????

Level Set methods. Sandra Allaart-Bruin. Level Set methods p.1/24

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Cylindrical roller bearings

EN Skriving for kommunikasjon og tenkning

ATO program for Renewal of IR, Class or Type-rating

Complete tank expertise

Windows Server 2008 Hyper-V, Windows Server 2008 Server Core Installation Notes

CTGA Meeting February 2, 2012

TriCOM XL / L. Energy. Endurance. Performance.

Hvordan føre reiseregninger i Unit4 Business World Forfatter:

Capturing the value of new technology How technology Qualification supports innovation

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET.

Databases 1. Extended Relational Algebra

CONNECTING NORWAY STEG-FOR-STEG

Q2 Results July 17, Hans Stråberg President and CEO. Fredrik Rystedt CFO

INFO TAXI REMOTE. Taxi Management CONTROL SYSTEM (TMCS)

Kundetilfredshetsundersøkelse FHI/SMAP

The Follo Line Project

Confidence-based Data Management for Personal Area Sensor Nets

Independent Inspection

Public roadmap for information management, governance and exchange SINTEF

Trust in the Personal Data Economy. Nina Chung Mathiesen Digital Consulting

Virginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr.

Slope-Intercept Formula

Passasjerer med psykiske lidelser Hvem kan fly? Grunnprinsipper ved behandling av flyfobi

Smart High-Side Power Switch BTS730

En praktisk anvendelse av ITIL rammeverket

Gir vi de resterende 2 oppgavene til én prosess vil alle sitte å vente på de to potensielt tidskrevende prosessene.

Exercise 1: Phase Splitter DC Operation

HOW TO GET TO TØI By subway (T-bane) By tram By bus By car Fra flyplassen

SeaWalk No 1 i Skjolden

Software applications developed for the maritime service at the Danish Meteorological Institute

Edge Of Dock Leveler. Size: Widths 66, 72, 78, 84. Lengths 15, 17 Lips. Capacities: 20,000 25,000 30,000 35,000 NEVERLIFT NL

Frode Endresen. Installasjonskrav ved fiskal gassmåling Hvorfor anbefales stadig de mest konservative løsningene?

Sascha Schubert Product Manager Data Mining SAS International Copyright 2006, SAS Institute Inc. All rights reserved.

PrO-ASTM Centrifuges. Centurion. C1015 Micro Prime Centrifuge. A Micro that offers: Oil testing. Petroleum testing, ASTM methods

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

Cavity BPM for Spectromety: progress and plans. S. Malton,, D. Miller, M. Slater, D. Ward, M. Wing, M. Thompson

Innhold. Instruks for melding av hærverk. ID1743-a- hærverk. IE76286-b- Trafikkdetektor Leggebeskrivelse E og E

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities

TUNNEL LIGHTING. LED Lighting Technology

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo,

Cylindrical roller bearings

Elektronisk innlevering/electronic solution for submission:

EHF more than invoice En brukerhistorie What, why and how? Asgeir Eliassen EDI Man Visma

Skiskole side 2. Pr. pers. 3 dager/3 days dager/4 days NY/NEW dager/5 days NY/NEW 1090

Guidance. CBEST, CSET, Middle Level Credential

Marmi Plus One. Sleek, Essential, Stunning

Prosjekt Nye tog November 2010

Smart $aver Non-Residential Programs. Cory Gordon Custom Incentives Energy Assessments

BPS TESTING REPORT. December, 2009

Justeringsanvisninger finnes på de to siste sidene.

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

Metrobuss-konseptet i Trondheim - et kollektivtilbud for fremtiden?

Speed Racer Theme. Theme Music: Cartoon: Charles Schultz / Jef Mallett Peanuts / Frazz. September 9, 2011 Physics 131 Prof. E. F.

Kartleggingsskjema / Survey

INNKALLING TIL ORDINÆR GENERALFORSAMLING I TELIO HOLDING ASA NOTICE OF ANNUAL SHAREHOLDERS MEETING IN TELIO HOLDING ASA

EG-leder konferanse 2017

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

1 VALG AV MØTELEDER 1 ELECTION OF A PERSON TO CHAIR THE MEETING 2 GODKJENNELSE AV INNKALLING OG DAGSORDEN 2 APPROVAL OF THE NOTICE AND THE AGENDA

Estimating Peer Similarity using. Yuval Shavitt, Ela Weinsberg, Udi Weinsberg Tel-Aviv University

CYBER SECURITY AUTONOME SYSTEMER. Marie Moe, forskningsleder for Cyber Security,

Statens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.

By Bioforsk RECOCA Team Per Stålnacke Csilla Farkas Johannes Deelstra

SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP)

LUFTDYKTIGHETSP ABUD

Satellite Stereo Imagery. Synthetic Aperture Radar. Johnson et al., Geosphere (2014)

Jeroen Stil Institute for Space Imaging Science. University of Calgary

Hybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS)

IPTV Forum. January 2007

Statens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland

Vi skaper tilgjengelighet

Certificates of Release to Service(CRS)

Neural Network. Sensors Sorter

Emneevaluering GEOV272 V17

The building blocks of a biogas strategy

1 VALG AV MØTELEDER 1 ELECTION OF A CHAIRMAN OF THE MEETING 4 STYREVALG 4 ELECTION TO THE BOARD OF DIRECTORS *** ***

Eksamensoppgave i GEOG1004 Geografi i praksis Tall, kart og bilder

UNIVERSITETET I OSLO

Smart Grid aktiviteter og FoU

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

The TrAM-project Transport Advanced & Modular

UNIVERSITY OF OSLO DEPARTMENT OF ECONOMICS

MID-TERM EXAM TDT4258 MICROCONTROLLER SYSTEM DESIGN. Wednesday 3 th Mars Time:

International Match U 18 CZE - HUN - SLO - SVK

The structure of the questionnaire in VTT study

Notat. Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne. Dato:

Norwegian s erfaringer med dagens rutetilbud på Vigra, og nye muligheter i fremtiden. Lars Sande Sales direktør lars@norwegian.no

Transkript:

Passenger Terminal World Expo 2011 Copenhagen, Denmark Steven B. Cornell Assoc. Vice President

Overview PRT Definition Planning Parameters for Airport Projects Speed Capacity Geometrics Costs New Airport Paradigms Enabled by PRT

PRT Definition Driverless Vehicles on a Guideway One to Six Seated Passengers plus Luggage Direct Origin to Destination Service No Need to Transfer or Stop Service On-Demand (NOT Scheduled) Very Short Headways (Seconds)

Planning Parameters for Airports Speed Speed Impacts Capacity - Choose Wisely Airport Distances are Short & PRT Trips are Non-Stop Lower speeds can provide high levels of service Consider desirable trip time then select speed Typical Airport Speeds 40 kph (25 mph) 20 kph (12 mph)

Planning Parameters for Airports Guideway Capacity Depends On: Vehicle Occupancy Minimum Headway Speed Available/desirable deceleration rate (0.25G 0.5G) Safety requirements (e.g. brick wall criterion) Vehicle length

Minimum Headways (Seconds) Recommend 3 Seconds for 40 kph (25 mph) 2 Seconds for 20 kph (12 mph) Meets brick wall Criterion

Theoretical Maximum Capacity Passengers per hour per direction Practical capacity = 80 95% of maximum Depends on duration and control system More than one guideway may be needed to meet demand May still cost less than alternatives

Capacity (cont.) Station Bay Capacity Depends on: Vehicle Dwell Time Time from one vehicle to the next Depends on: Boarding and alighting times Station geometrics» Amount of maneuvering required Dwell time varies from 15 to 40 seconds

Capacity (cont.) Theoretical Bay Capacity (assuming 4 passengers) Varies from 360 to 960 Passengers per Hour Requires Ready Vehicles Immediately Available Nearby storage and short headways

Geometrics Guideways Vehicle Clearance Envelope 2.5m x 2.5m (8 x 8 ) Includes structure for some systems but not others Minimum turning radius Varies from 10m to 5m (33 to 15 ) Maximum grade 10% Consider Using 8% for Walkway Handicap Compliance

Typical Station Layouts

Planning-Level PRT Costs Capital $10M - $15M per One-Way Kilometer All-Inclusive Except Right-of-Way & Utility Relocations Operating and Maintenance Dependent on the Passenger Ridership (similar to APM) Vehicle Maintenance (Less Complexity) Guideway Maintenance (Less Complexity) Aircraft Boarding Station w/boarding Bridges Control-Room Staffing and Maintenance

Conventional Airport Layout

PRT-Enhanced Airport Layout

Composite Layout

Conventional Layout

Conventional Layout

Modified Terminal Layout

PRT-Enhanced Layout

PRT-Enhanced Layout

PRT-Enhanced Layout

PRT-Enhanced Layout

Conventional Layout Terminal Processor (Check-in, Bag- Drop & Security) Four (4) Connected Concession Cores & Boarding Lounges Airside Secure PRT/GRT Landside Non-Secure PRT/GRT 77 PRT-Enhanced Contact Gates

PRT Guideway w/boarding Stations Patent Pending Six (6) Lane PRT Guideway w/ Aircraft Boarding Stations Multi-level Passenger Boarding Bridges 2011-02-22

Elevated Aircraft Boarding Station Patent Pending Elevated PRT Guideway w/ Aircraft Boarding Station Covered Boarding Station (Enclosed as Required) 2011-02-22

Aircraft Boarding Station Patent Pending 2011-02-22

Aircraft Boarding Station 2011-02-22 Patent Pending

QUESTIONS (Following Presentations) Steven B. Cornell Assoc. Vice President steven.cornell@tylin.com