1 Railway bridge Fidjetun Norway First project with FFU synthetic sleepers in Scandinavia Jernbanebrua Fidjetun Norge Første prosjekt med FFU syntetiske sviller i Skandinavia RAILWAY TECHNOLOGY State of the Art
2 In November 2016, Jernbaeverket used FFU synthetic wood for the first time in Norway and in Scandinavia. The single-track bridge, which is equipped with FFU synthetic sleepers, is located on the route Kristiansand - Oslo. From the Fidjetun station, this is about 200 meters away and crosses a body of water. I november 2016 bruker Jernbaneverket FFU syntetiske tre i hovedspor for første gang i Norge,og i Skandinavia. Den enkeltsporede broen, som er utstyrt med FFU syntetiske sviller, ligger på ruten Kristiansand - Oslo. På Fidjetun stasjon, dette er ca 200 meter unna, og krysser en elv. 2
3 The exchange of the existing wooden sleepers against the FFU synthetic sleepers took place during the regular railway operation. This is preferably on weekends, since here rail traffic is much lower than on workdays. 60 synthetic sleepers with dimensions B/H/L = 230/230/2,500 mm and further 2 sleepers with B/H/L = 190/230 / 2,500 mm were installed. After the overhead line was earthed and the line for the installation was released, the vertical holes for the hook bolts were drilled in FFU to finally secure the sleepers at the bridge. Parallel to this, the rails were released in the connection area to the bridge and in the bridge, where the sleepers had to be replaced. Now the existing pavement could be rebuilt and the existing sleepers removed from the bridge construction. Exchange of the sleepers has always been carried out on a field-by-case basis. About 12 sleepers per field were to be changed This allowed the train operation to travel safely at 30km/h the route in the construction area. Bytte av de eksisterende tresvillene mot FFU syntetiske sviller fant sted under den ordinære togtrafikken. Og da fortrinnsvis i helgene, siden togtrafikken er mye lavere da enn på hverdager. 60 syntetiske sviller med dimensjonene B / H / L = 230/230/2500 mm og ytterligere 2 sviller med B / H / L = 190/230 / 2500 mm ble installert. Etter at kjøreledning ble jordet,og linjen for installasjonen ble frigjort, ble de vertikale hull til hakeboltene borret i FFU svillene for sikre svillene på broen. Parallelt med dette ble skinnene løsnet i tilkoblingsområdet til broen,og i broen, hvor sviller skulle erstattes. Nå kunne eksisterende gangbaner bli demontert, og eksisterende sviller fjernet fra brokonstruksjonen. Utveksling av sviller har alltid blitt utført på et felt-av-gangen basis. Om 12 sviller per felt skulle endres Dette gjorde saktekjøring nødvendig for å ferdes trygt på 40km / h rute i anleggsområdet. 3
4 Now, with the help of a small excavator with a rubber chain drive and a very movable telescopic head, the existing wooden sleepers were gripped and collapsed so that they could be twisted and lifted between the rails. The installation of the FFU synthetic sleepers took place in the opposite direction. The old bridge sleepers were removed and stored on the side of the track. 4
5 Nå, med hjelp av en liten gravemaskin med en gummibelter og en meget bevegelig teleskopisk hode, ble de eksisterende tresviller grepet,og slik at de kunne bli vridd og løftet mellom skinnene. Installasjonen av FFU syntetiske sviller fant sted i motsatt retning. Gamle sviller ble fjernet,og lagret på siden av sporet i enden av broen. 5
6 After the new bridge sleepers were placed on the steel beams, they were placed in their correct position and secured to the bridge longitudinal beams with the aid of the hook bolts. The ribbed plates with the rail are brought into the correct position, pre-drilled, furnished, the geometry controlled and finally securely screwed. Etter at de nye brosvillene ble plassert på stålbjelker, ble de plassert i riktig posisjon,og festet til broens langsgående bjelker med hjelp av hakebolter. Da ble festeplater med klemmer brakt inn i riktig posisjon, pre-boret, montert, geometri kontrollert,og endelig skrudd fast. 6
7 Under these circumstances and in winter weather conditions it was possible to finish the exchange of bridge sleepers and to release the railway track for the undisturbed operation at the end of November Under disse omstendigheter, og i vinterlige værforhold var det mulig å fullføre bytte av bro sviller,og å frigjøre jernbanesporet for uforstyrret drift i slutten av november
8 Jernbaneverket Ingar Uldal Senioringeniør Prosjektleder Prosjektavdeling Område Sør Vestre Strandgate Kristiansand.S. 3. Etasje Postboks Kristiansand Telefon: (+47) Mobil: (+47) E-post: SEKISUI CHEMICAL GmbH Yoshihiro Nakao Senior Sales Manager Engineer Königsallee Düsseldorf Germany Tel: +49 (0) mobil: +49 (0)
Slope-Intercept Formula
LESSON 7 Slope Intercept Formula LESSON 7 Slope-Intercept Formula Here are two new words that describe lines slope and intercept. The slope is given by m (a mountain has slope and starts with m), and intercept
DetaljerMONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE
MONTASJEANVISNING INSTRUCTIONS FOR ASSEMBLY AND USE Småvarereol R 3000 Shelving unit R 3000 ZERTIFIZIER T 1. Gavl / Upright frame 2. Hylle / Dividing shelf 3. Krysstag / Back braces 4. Gitter bakvegg /
DetaljerExamples and experience from restorations along Tana river on the norwegian side. Knut Aune Hoseth Head of northern region
Examples and experience from restorations along Tana river on the norwegian side Knut Aune Hoseth Head of northern region Mapping of migration barriers 1998-2000 Interreg project Better understanding of
DetaljerExisting Relay-based Interlocking System Upgrades (NSI-63) Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42
Ombygging av relebasert sikringsanlegg (NSI-63) Entreprise UBF 42 / Contract UBF 42 Existing Relay-based Interlocking System Upgrades (NSI-63) Jostein Heimark Project Manager Signalling Innhold Introduksjon
DetaljerHONSEL process monitoring
6 DMSD has stood for process monitoring in fastening technology for more than 25 years. HONSEL re- rivet processing back in 990. DMSD 2G has been continuously improved and optimised since this time. All
DetaljerPARABOLSPEIL. Still deg bak krysset
PARABOLSPEIL Stå foran krysset på gulvet og se inn i parabolen. Hvordan ser du ut? Still deg bak krysset på gulvet. Hva skjer? Hva skjer når du stiller deg på krysset? Still deg bak krysset Det krumme
DetaljerWindlass Control Panel
SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e
DetaljerEGENSKAPER. Tre-tre skjøt: Tre-betong skjøt: ANVENDELSE. Technical data sheet ABR - VINKELBESLAG TIL MONTAGE AF LETFACADER
Vinkelbeslag ABR170 og ABR220 brukes til skjøter i bærende trekonstruksjoner og stålløsninger, samt trebetong skjøter. Beslaget er utstyrt med kraftige ribbeforsterkninger. UK-DoP-e060106, SE-DoP-e060106,
DetaljerSafeRing / SafePlus Retrofit of under voltage coil V Module
SafeRing / SafePlus Retrofit of under voltage coil V Module Installation Instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS 2008-12-15 BJGU/GUSO Checked
Detaljer1 BANESTRØMFORSYNING TOGVARMEANLEGG KONTAKTLEDNINGSANLEGG... 5
Infrastruktur Elkraft / Energy Side / Page: 1 av/of 5 1 BANESTRØMFORSYNING... 3 2 TOGVARMEANLEGG...4 3 KONTAKTLEDNINGSANLEGG... 5 Infrastruktur Elkraft / Energy Side / Page: 2 av/of 5 1... 3 TRACTION POWER
DetaljerINSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
DetaljerC13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward
C13 Kokstad Svar på spørsmål til kvalifikasjonsfasen Answers to question in the pre-qualification phase For English: See page 4 and forward Norsk Innhold 1. Innledning... 2 2. Spørsmål mottatt per 28.11.12...
DetaljerSafering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules
Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared
Detaljer5 E Lesson: Solving Monohybrid Punnett Squares with Coding
5 E Lesson: Solving Monohybrid Punnett Squares with Coding Genetics Fill in the Brown colour Blank Options Hair texture A field of biology that studies heredity, or the passing of traits from parents to
DetaljerREMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION
2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm
DetaljerINSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )
INSTALLATION GUIDE 1505-FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Cargo Rack Assembly... 3-4 5-6 Phase 2 - Installation q
DetaljerAdministrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6.
Administrasjon av postnummersystemet i Norge Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 Postnumrene i Norge ble opprettet 18.3.1968 The postal codes in Norway was established in
DetaljerSafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for relay trip indication V module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
DetaljerSafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module
SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared NODIS
DetaljerFIRST LEGO League. Härnösand 2012
FIRST LEGO League Härnösand 2012 Presentasjon av laget IES Dragons Vi kommer fra Härnosänd Snittalderen på våre deltakere er 11 år Laget består av 4 jenter og 4 gutter. Vi representerer IES i Sundsvall
DetaljerSamferdsel i Follo-Ikke bare Follobanen og E 18?
Samferdsel i Follo-Ikke bare Follobanen og E 18? Senior Rådgiver Tom Granquist, Akershus fylkeskommune 4. Februar 2016 Utfordringer innenfor samferdsel InterCity-utbyggingen Mer godstransport med bane
DetaljerInnhold. Instruks for melding av hærverk. ID1743-a- hærverk. IE76286-b- Trafikkdetektor Leggebeskrivelse E og E
Statens vegvesen Region Midt Elektrokontrakt Nordmøre og Romsdal Innhold Mappe I - Omfatter aktuelle drifts-/vedlikeholdsinstrukser og annen supplerende og utdypende grunnlagsinformasjon og/eller kravspesifikasjon
DetaljerBuilding conservation in practice
Building conservation in practice Aadne Gunnar Sollid Cultural heritage leader in Aust- Agder county. Aust-Agder fylkeskommune 2 Synagogen er blant de eldste eksisterende tresynagogen i Øst-Europa. Den
DetaljerCylindrical roller bearings
Cylindrical roller bearings Cylindrical roller bearings 292 Definition and capabilities 292 Series 292 Variants 293 Tolerances and clearances 294 Design criteria 296 Installation/assembly criteria 297
DetaljerTRÅL-, SNURPE- OG SNURREVADVINSJER
TRÅL-, SNURPE- OG SNURREVADVINSJER Som et konkurransefortrinn ved bygging av båter til kystfiskeflåten startet MBH først på 80 tallet å lage lette fiskerivinsjer i aluminium og rustfritt stål til egne
DetaljerHandicare Emineo Ledsagerbrems Basic / Drum brake Basic
Monteringsanvisning Assembly instructions Handicare Emineo Ledsagerbrems Basic / Drum brake Basic Beskrivelse/Description Art. nr / Item no. 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 22 Flexel/Compact
DetaljerKAMPANJE APK : APK-8: Bytte bakaksel bolter
KAMPANJE APK-8 20160222: APK-8: Bytte bakaksel bolter Berørte modeller for APK-8: Vitara APK, S-cross AKK, og Swift AZG. Totalt 454 biler på det norske markedet. Liste med chassisnummer legges ikke ved,
DetaljerExercise 1: Phase Splitter DC Operation
Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your
DetaljerThe North-South Corridor - showing progress
The North-South Corridor - showing progress Euro-Asian Transport Links Expert Group meeting Tashkent, Uzbekistan November 1-3.2010 Stig Nerdal, Senior Adviser, UIC The initial founders of The International
DetaljerJusteringsanvisninger finnes på de to siste sidene.
d Montering av popup spredere Justeringsanvisninger finnes på de to siste sidene. Link til monteringsfilm på youtube: http://youtu.be/bjamctz_kx4 Hver spreder har montert på en "svinkobling", det vil si
DetaljerIMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM!
GB IMPORTANT! HOLD ON THIS DOCUMENT FOR LATER REFERENCE! READ CAREFULLY! NOR VIKTIG! BEHOLD DETTE DOKUMENTET FOR FREMTIDIG BRUK! LES NØYE IGJENNOM! Produktmål, materiale: 135x77x72 cm Furu Proper use This
DetaljerEGENSKAPER ANVENDELSE. Technical data sheet ESCR - KONSTRUKSJONSSKRUE TIL TRE
ESCR er en skrue med diameter 8 eller 10 mm. Den har et skivehode som er designet til å sammenføye to eller flere trebjelker. ESCRskruene har en type 17 spiss, som griper raskt, og en freseribbe som sikrer
DetaljerRAPPORT ENGLISH SUMMARY INCLUDED
RAPPORT ENGLISH SUMMARY INCLUDED Statens Havarikommisjon for Transport Postboks 213 2001 Lillestrøm Telefon: 63 89 63 00 Faks: 63 89 63 01 http://www.aibn.no E-post: post@aibn.no Avgitt dato: 26.04.2007
DetaljerKROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal.
KROPPEN LEDER STRØM Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal. Hva forteller dette signalet? Gå flere sammen. Ta hverandre i hendene, og la de to ytterste personene
DetaljerADDENDUM SHAREHOLDERS AGREEMENT. by and between. Aker ASA ( Aker ) and. Investor Investments Holding AB ( Investor ) and. SAAB AB (publ.
ADDENDUM SHAREHOLDERS AGREEMENT by between Aker ASA ( Aker ) Investor Investments Holding AB ( Investor ) SAAB AB (publ.) ( SAAB ) The Kingdom of Norway acting by the Ministry of Trade Industry ( Ministry
DetaljerMØTEPROTOKOLL. Internasjonalt Utvalg. Dato: kl. 9:00 Sted: Skype Arkivsak: 15/01544
MØTEPROTOKOLL Internasjonalt Utvalg Dato: 07.02.2018 kl. 9:00 Sted: Skype Arkivsak: 15/01544 Tilstede: Hanne Solheim Hansen, Hugo Nordseth, Grete Ingemann Knudsen, Kaja Skårdal Hegstad, Margarita Novoa-Garrido,
DetaljerStatens vegvesen. Godkjenning av StalPro Rail su vegrekkverk. Stalprodukt S.A ul. Wygoda 69, Bochnia. Polen. Dawid Barnaś
Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
DetaljerFitting instruction. devi-pipeheat / devi-flexheat Assembly between cold tail and selflimiting. Montering av tilledning på selvbegrensende varmekabel
GB/NO Fitting instruction devi-pipeheat / devi-flexheat Assembly between cold tail and selflimiting heating cable Item no. 19806415 Montering av tilledning på selvbegrensende varmekabel Art. nr. 19806415
DetaljerCylindrical roller bearings
Cylindrical roller bearings Cylindrical roller bearings 292 Definition and capabilities 292 Series 292 Variants 293 Tolerances and clearances 294 Design criteria 296 Installation/assembly criteria 297
DetaljerStatens vegvesen. Godkjenning av LT 103 vegrekkverk. Linetech GmbH & Co. KG Von-Hünefeld-Straße Köln Tyskland
Statens vegvesen Linetech GmbH & Co. KG Von-Hünefeld-Straße 99 50829 Köln Tyskland Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
DetaljerSafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module
SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date
DetaljerOf all the places in the world, I love to stay at Grandma Genia and
Of all the places in the world, I love to stay at Grandma Genia and Grandpa Yuda s house. I spend all my vacations there away from my nagging sister, away from my parents without ever having to wake up
DetaljerHow Bridges Work Sgrad 2001
How Bridges Work Sgrad 2001 The Basic s There are three major types of bridges: The beam bridge The arch bridge The suspension bridge prepared by Mr.S.Grad 2 The biggest difference between the three is
DetaljerLast ned Marianne Heier - Marianne (ART) Heier. Last ned
Last ned Marianne Heier - Marianne (ART) Heier Last ned Forfatter: Marianne (ART) Heier ISBN: 9788275477444 Antall sider: 155 Format: PDF Filstørrelse: 19.21 Mb "Mirage" is an installation by Norwegian
DetaljerForecast Methodology September LightCounting Market Research Notes
Forecast Methodology September 2015 LightCounting Market Research Notes Vladimir Market Kozlov Forecast Methodology, September, September, 2015 2015 1 Summary In summary, the key assump=on of our forecast
DetaljerHOW TO GET TO TØI By subway (T-bane) By tram By bus By car Fra flyplassen
HOW TO GET TO TØI TØI s offices are located on the 5th and 6th floors of the CIENS building in the Oslo Research Park (Forskningsparken). We recommend that one uses the subway (T-bane), tram or bus to
DetaljerStatens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.
Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
DetaljerStatens vegvesen. Rekkverket med føringsskinne av type A er i utgangspunktet samme egenskaper som det som var fullskalatestet, type B.
Statens vegvesen Stalprodukt S.A ul. Wygoda 69, 32-700 Bochnia Polen Dawid Barnaś Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi /
DetaljerTrigonometric Substitution
Trigonometric Substitution Alvin Lin Calculus II: August 06 - December 06 Trigonometric Substitution sin 4 (x) cos (x) dx When you have a product of sin and cos of different powers, you have three different
DetaljerBRANDANGERSUNDET BRO. Entreprenørens utfordringer ved bygging av broa Presentasjon på Brodagen 10.november 2009 Ved Torbjørn Kjoberg, Skanska
BRANDANGERSUNDET BRO Entreprenørens utfordringer ved bygging av broa Presentasjon på Brodagen 10.november 2009 Ved Torbjørn Kjoberg, Skanska Brandangersundet network arch bridge Free span: 220 meter Skanska
DetaljerGoOpen 2008 Oslo 8. april. Jernbaneverket Fri programvare i driftskritiske systemer. Ole Morten Killi ole.morten.killi@bouvet.
GoOpen 2008 Oslo 8. april Jernbaneverket Fri programvare i driftskritiske systemer Ole Morten Killi ole.morten.killi@bouvet.no Bouvet ASA Bouvet ASA Ca. 400 ansatte 8 kontorer Bouvets ambisjon er å være
DetaljerUtøver går med feil lårnummer (og riktig startnummmer/brikke).
CASER Utøver går med feil lårnummer (og riktig startnummmer/brikke). - Arrangørfeil ingen konsekvens Utøver har ikke meldt seg på i rett tid og har reist med fly for å delta på Norges Cup. Hva skal TD
DetaljerBerøringsfritt eksosavtrekkssystem
Stasjonært systemet for biler med alle typer eksosrør Letthåndterlig system for alle typer verksteder. Består av et grunnleggende skinnesystem som er ferdig med et berøringsfritt eksosavtrekkssett. Svært
DetaljerSafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock type EL11AP C, De, F and Sl modules
We reserve all rights in this document and in the information contained therein: Reproduction, use or disclosure to third parties SafeRing / SafePlus Retrofit of Ronis key for earthing switch Interlock
DetaljerMonteringsanvisning. Assembly instructions. Ledsagerbrems / Drum brake. Artikkelnummer/ Item no.
Monteringsanvisning Assembly instructions Exigo 30 Emineo Ledsagerbrems / Drum brake Beskrivelse/Description 20 Flexel/Compact 84417 20 Luft/Pneumatic 84416 20 Pur 84419 22 Flexel/Compact 84437 22 Luft/Pneumatic
DetaljerUnit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3
Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL
DetaljerTHE MONTH THE DISCIPLINE OF PRESSING
THE MONTH THE DISCIPLINE OF PRESSING Nehemiah 4:1-9 NIV 1 [a ] When Sanballat heard that we were rebuilding the wall, he became angry and was greatly incensed. He ridiculed the Jews, 2 and in the presence
Detaljer05/08/2002 Bugøynes. 16/08/2002 Bugøynes
FANGSTSEKSJONEN SENTER FOR MARINE RESSURSER TOKTRAPPORT Fartøy F/F Fangst Toktnummer 22 9 Prosjekttittel Seleksjon Konge krabbe Delprosjektnr. 627 Avgangsdato og sted Ankomststed og dato /8/22 Bugøynes
DetaljerBostøttesamling
Bostøttesamling 2016 Teresebjerke@husbankenno 04112016 2 09112016 https://wwwyoutubecom/watch?v=khjy5lwf3tg&feature=youtube 3 09112016 Hva skjer fremover? 4 09112016 «Gode selvbetjeningsløsninger» Kilde:
DetaljerNeural Network. Sensors Sorter
CSC 302 1.5 Neural Networks Simple Neural Nets for Pattern Recognition 1 Apple-Banana Sorter Neural Network Sensors Sorter Apples Bananas 2 Prototype Vectors Measurement vector p = [shape, texture, weight]
DetaljerProduct Facts. Product code example
ESAM Smoke control damper for multi Rectangular smoke control damper ESAM is specifically designed for use in multi fire compartment applications as a closing or as an opening damper for smoke extract
DetaljerPIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER
SLUTTRAPPORT Innhold 1. Innledning 1.1 Deltakere 1.2 Bakgrunn 1.3 Mål 1.4 Organisasjon 2. Oppsummering 3. Summary in English 4. Referanser/References 1. INNLEDNING 1.1 Deltakere Alcan á Ísland Alcoa Fjarðaál
DetaljerFYSMEK1110 Eksamensverksted 23. Mai :15-18:00 Oppgave 1 (maks. 45 minutt)
FYSMEK1110 Eksamensverksted 23. Mai 2018 14:15-18:00 Oppgave 1 (maks. 45 minutt) Page 1 of 9 Svar, eksempler, diskusjon og gode råd fra studenter (30 min) Hva får dere poeng for? Gode råd fra forelesere
DetaljerBedre Jernbaneforbindelse mellom Oslo og Stockholm. Tom Granquist,Selvstendig Konsulent. TEG AS
Bedre Jernbaneforbindelse mellom Oslo og Stockholm Arbeid i Grensekomiteen Värmland-Østfold. Tom Granquist,Selvstendig Konsulent. TEG AS The Osloregion - an integrated area of a common Nordic region The
DetaljerJBV DSB godkjenninger
JBV DSB godkjenninger Leverandørmøte 2015-02-03 Willy Karlsen Sakkyndig driftsleder Electrical operation manager Eier av JBVs elektriske anlegg Alle jernbaneverkets elektriske anlegg er delt opp på de
DetaljerVekeplan 4. Trinn. Måndag Tysdag Onsdag Torsdag Fredag AB CD AB CD AB CD AB CD AB CD. Norsk Matte Symjing Ute Norsk Matte M&H Norsk
Vekeplan 4. Trinn Veke 39 40 Namn: Måndag Tysdag Onsdag Torsdag Fredag AB CD AB CD AB CD AB CD AB CD Norsk Engelsk M& Mitt val Engelsk Matte Norsk Matte felles Engelsk M& Mitt val Engelsk Norsk M& Matte
DetaljerOle Isak Eira Masters student Arctic agriculture and environmental management. University of Tromsø Sami University College
The behavior of the reindeer herd - the role of the males Ole Isak Eira Masters student Arctic agriculture and environmental management University of Tromsø Sami University College Masters student at Department
DetaljerStatens vegvesen. Rekkverket har en totalbredde på 0,54m og høyde på 0,90m (uten kantdrager).
Statens vegvesen Likelydende brev - se vedlagt liste Behandlende enhet: Saksbehandler/telefon: Vår referanse: Deres referanse: Vår dato: Vegdirektoratet Matteo Pezzucchi / 22073246 15/212577-15 07.12.2015
DetaljerSafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules
SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules Installation instructions www.abb.com Document status Responsible
DetaljerUkebrevet BARNEHAGEN. Velkommen til Damenes Aften - 8.februar kl se vedlegg i forrige ukebrev for mer info om denne dagen!
Ukebrevet Uke 6 (5/2-11/2) BARNEHAGEN Velkommen til Damenes Aften i Barnas Hus 3-6: 3 Velkommen til Damenes Aften - 8.februar kl 16.00-18.00 - se vedlegg i forrige ukebrev for mer info om denne dagen!
DetaljerEMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post:
EMPIC MEDICAL Etterutdanningskurs flyleger 21. april 2017 Lars (Lasse) Holm Prosjektleder Telefon: +47 976 90 799 E-post: Lrh@caa.no it-vakt@caa.no Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50
DetaljerBytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter 01.01.2015.
S e r v i c e o r d r e M a t e r i e l l Materiellsjef F/NLF kommuniserer pålegg omkring forhold som ansees som vesentlige for å oppnå de målsettinger som er satt for materiellarbeidet via denne Service
DetaljerWhat's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid
Pris kr. 490,- Påmelding til Tone på tj@kph.no Frist: 10. januar 2019 DET ER UTFORDRENDE Å FÅ AVGRENSET OG SATT MÅL FOR DIGITALISERINGSPROSJEKTER SOM GIR VERDI FOR VIRKSOMHETEN. SINTEF HELGELAND OG ARCTIC
DetaljerPSi Apollo. Technical Presentation
PSi Apollo Spreader Control & Mapping System Technical Presentation Part 1 System Architecture PSi Apollo System Architecture PSi Customer label On/Off switch Integral SD card reader/writer MENU key Typical
DetaljerEiendomsverdi. The housing market Update September 2013
Eiendomsverdi The housing market Update September 2013 Executive summary September is usually a weak month but this was the weakest since 2008. Prices fell by 1.4 percent Volumes were slightly lower than
DetaljerBaltic Sea Region CCS Forum. Nordic energy cooperation perspectives
Norsk mal: Startside Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives Johan Vetlesen. Senior Energy Committe of the Nordic Council of Ministers 22-23. april 2015 Nordic Council of Ministers.
DetaljerTUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.
TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene
DetaljerSoftware applications developed for the maritime service at the Danish Meteorological Institute
Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological
DetaljerHvor mye teoretisk kunnskap har du tilegnet deg på dette emnet? (1 = ingen, 5 = mye)
Emneevaluering GEOV325 Vår 2016 Kommentarer til GEOV325 VÅR 2016 (emneansvarlig) Forelesingsrommet inneholdt ikke gode nok muligheter for å kunne skrive på tavle og samtidig ha mulighet for bruk av power
DetaljerTZERO HID-AS-IN / TZERO HID-S-IN FOR GJENNOMGÅENDE KOBLING. Monteringsanvisning. TZERO HID_IN_IM_ENG - Rev.03 of 17/12/13 Pag. 1 of 4. Pic. 1. Pic.
TZERO HID-S-I / TZERO HID-S-I FOR GJEOMGÅEDE KOIG TUE EYSIG TZERO HID_I_IM_EG - Rev.03 of 17/12/13 Pag. 1 of 4 MOTERIGSVISIG rmaturen må festes til armaturbraketten med fire M10mm skruer () og fire låsemutre
DetaljerEmneevaluering GEOV272 V17
Emneevaluering GEOV272 V17 Studentenes evaluering av kurset Svarprosent: 36 % (5 av 14 studenter) Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet PhD Candidate Samsvaret mellom
DetaljerTUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.
TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene
DetaljerIndependent Inspection
Independent Inspection Odd Ivar Johnsen Vidar Nystad Independent Inspection Mål: Felles forståelse og utøvelse av "Independent Inspection" i forbindelse med "Critical Maintenance Task". Independent Inspection
DetaljerMidnight BBQ Light USER MANUAL
Midnight BBQ Light USER MANUAL Instructions The Midnight BBQ Light uses 4 x LR44 / AG13 batteries, included in the package. Unscrew the bottom cover and insert the included batteries and align the battery
DetaljerTUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.
TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene
DetaljerSERVICE BULLETINE 2008-4
S e r v i c e b u l l e t i n e M a t e r i e l l Materiellsjef F/NLF kommuniserer påminnelse omkring forhold som ansees som vesentlige for å orientere om viktige materiellforhold. Målgruppen for Servicbulletinen
DetaljerMontering av Lian Skyvedør Installation of Lian Sliding Door
Montering av Lian Skyvedør Installation of Lian Sliding Door Les dette før du starter monteringen! Read these instructions carefully before installation. Sjekk nøye at produktet stemmer med bestilling
DetaljerTRAPPETA RN MONTERINGSANVISNING
[Skriv inn tekst] TRAPPETA RN MONTERINGSANVISNING 3 x 1,6 m Trappetårn Monteringsveiledningen er laget for å gi en beskrivelse på monteringen av Delta TRAPPETÅRN. Delta TRAPPETÅRN er typegodkjent under
DetaljerLUFTDYKTIGHETSP ABUD
MERK! For at angjeldende flymateriell skal være luftdyktig må påbudet være utført til rett tid og notat om utførelsen ført inn i vedkommende iournal med henvisniniz til denne LDPs nummer. Luftartstilsynet
DetaljerGEOV219. Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet postbachelor phd
GEOV219 Hvilket semester er du på? Hva er ditt kjønn? Er du...? Er du...? - Annet postbachelor phd Mener du at de anbefalte forkunnskaper var nødvendig? Er det forkunnskaper du har savnet? Er det forkunnskaper
DetaljerSTILLAS - STANDARD FORSLAG FRA SEF TIL NY STILLAS - STANDARD
FORSLAG FRA SEF TIL NY STILLAS - STANDARD 1 Bakgrunnen for dette initiativet fra SEF, er ønsket om å gjøre arbeid i høyden tryggere / sikrere. Både for stillasmontører og brukere av stillaser. 2 Reviderte
DetaljerCommon profiles on wooden buildings in the old town of Kuldiga, Latvia. Vanlige profiler på trebygninger i gamlebyen i Kuldiga, Latvia
Common profiles on wooden buildings in the old town of Kuldiga, Latvia Vanlige profiler på trebygninger i gamlebyen i Kuldiga, Latvia Honorable Mayor of Kuldiga Inga Berzina During the last few years I
DetaljerKAMPANJE APK : APK-4: Kontroll montering EGT-2
KAMPANJE APK-4 20150722: APK-4: Kontroll montering EGT-2 Berørte modeller for APK-4: Vitara APK416D, totalt 58 biler. Liste med chassisnummer legges ikke ved, bruk Forhandlerweb til å sjekke om bilen er
DetaljerLast ned Bergen - Trond Indahl. Last ned. Last ned e-bok ny norsk Bergen Gratis boken Pdf, ibook, Kindle, Txt, Doc, Mobi
Last ned Bergen - Trond Indahl Last ned Forfatter: Trond Indahl ISBN: 9788271288051 Antall sider: 241 Format: PDF Filstørrelse: 17.18 Mb Bergen's old wooden architecture has a magical attraction. It makes
DetaljerPerpetuum (im)mobile
Perpetuum (im)mobile Sett hjulet i bevegelse og se hva som skjer! Hva tror du er hensikten med armene som slår ut når hjulet snurrer mot høyre? Hva tror du ordet Perpetuum mobile betyr? Modell 170, Rev.
DetaljerVelkommen om bord i F/F Gunnerus. Welcome on board R/V Gunnerus. Introduksjon F/F Gunnerus
1 Velkommen om bord i F/F Gunnerus Welcome on board R/V Gunnerus 2 Forberedelse til tokt. Preparation for cruise. Helse miljø og sikkerhet ved NTNU. http://www.ntnu.no/adm/hms Health, safety and environmental
DetaljerZero Emission Neighborhoods Hva skal til?
Zero Emission Neighborhoods Hva skal til? Futurebuilt-konferansen 09.06.2017 Inger Andresen Professor NTNU 1 Innhold Smart målsetning Smart prosess Smarte løsninger Smarte brukere Smarte energisamfunn
DetaljerMonteringsprosedyre for Soundstop - lydmatte
NORSOK STANDARD PIPING AND EQUIPMENT INSULATION R-004 5.7 Guidelines for acoustic insulation The acoustic pipe insulation classes can be met by various combinations of insulation materials and jacketing
Detaljer