Name of Division No. of DTs damaged DTs damaged with Capacity, location and Sub-Division. No. of damaged DTs yet to be replaced in system as on 22nd & 23rd April 2018 Location Name of Sub-Division Capacity (KVA) Date of damage ED-I, Jammu 4 100 KVA, JKTDC Nagrota, SD-IV, Nagrota 0 25 KVA, Chaini, SD-IV, Nagrota 63 KVA, Panjgrain, SD-IV, Nagrota 63 KVA, NHAI Khanpur Nagrota, SD-Nagrota ED-II, Jammu 11 630 KVA, Bombay Wala N. Nagar, SDGreen Belt 0 250 KVA, Rahim Nagar, SD-Green Belt 100 KVA, Mamka, SD-Bishnah 100 KVA, Chatha, SD-Shastri Nagar 100 KVA, Rangpur Mohalla, SD-Miran Sahib 63 KVA, Channi SOS, SD-Green Belt 250 KVA, Bazigar Basti Bawa, SD-Green Belt 250 KVA, Ajit Nagar, SD-Shastri Nagar 250 KVA, JIC Miran Sahib, SD-Miran Sahib 250 KVA, Kotli Shah Dulah, SD-Green Belt 100 KVA, Bishnah, SD-Bishnah ED-III, Jammu 0 0 16 Kah SD-Akhnoor 63 25.12.2017 Nai Basti Khour SD-Jourian 25 11.01.2018 Chajwal SD-Akhnoor 25 31.01.2018 Jourian SD-Jourian 25 28.02.2018 Cheekhani SD-Akhnoor 25 28.03.2018 Patoli Brahmana SD-Canal 250 15.04.2018 Rakh Malal SD-Jourian 100 16.04.2018 Ramnagar SD-Akhnoor 100 16.04.2018
Tanda SD-Jourian 100 17.04.2018 Gaita SD-Janipur 63 17.04.2018 Beri Chapri SD-Janipur 63 18.04.2018 Taroti SD-Jourian 63 18.04.2018 Panjtoot SD-Jourian 63 18.04.2018 Sungal Chatri SD-Akhnoor 63 19.04.2018 Dhakar SD-Jourian 25 18.04.2018 Lohara SD-Akhnoor 25 19.04.2018 ED-Vijaypur 10 100 KVA, Chataka Chak, SD-Vijaypur 10 Raipur Camp SD-Samba 63 16.04.2018 100 KVA, Salmeri, SD-Vijaypur Mangolian Rait SD-Vijaypur 25 16.04.2018 25 KVA, Rajinderpura, SD-Vijaypur Garh Mandi SD-Vijaypur 100 17.04.2018 63 KVA, Kamila, SD-Vijaypur Beliyan SD-Samba 25 21.04.2018 63 KVA, Dagore, SD-Samba Chataka Chak SD-Vijaypur 100 22.04.2018 100 KVA, Buchhadi, SD-Bari Brahmana Rajinderpura SD-Vijaypur 25 22.04.2018 100 KVA, Railway Stn, SD-Bari Brahmana Kamila SD-Vijaypur 63 22.04.2018 25 KVA, Gowal, SD-Bari Brahmana Dagore SD-Samba 63 23.04.2018 63 KVA, Chang, SD-Vijaypur Buchhadi SD-Bari Brahmana 100 23.04.2018 63 KVA, Sadyali, SD-Samba Railway Stn SD-Bari Brahmana 100 23.04.2018 ED-Kathua 6 63 KVA, Prani, SD-Hiranagar 6 Prani SD-Hiranagar 63 22.04.2018 100 KVA, Bakrwal, SD-Hiranagar Bakrwal, SD-Hiranagar 100 22.04.2018 250 KVA, Daral, SD-Kathua Daral SD-Kathua 250 22.04.2018 63 KVA, Paca Kotha, SD-Hiranagar Paca Kotha SD-Hiranagar 63 23.04.2018 100 KVA, Packho Chack, SD-Hiranagar Packho Chack SD-Hiranagar 100 23.04.2018 63 KVA, Jatha, SD-Ramkot Jatha SD-Ramkot 63 23.04.2018 ED-Rajouri 5 100 KVA, Nerojail, SD-II, Rajouri 4 Chitti bakri SD-I, Rajouri 25 09.04.2018 63 KVA, Behrote, SD-II, Rajouri Tundi Trar SD-I, Rajouri 25 10.04.2018 63 KVA, Debrote, SD-I, Rajouri Behrote SD-II, Rajouri 63 22.04.2018 25 KVA, Kote Pangha, SD-SD-II, Rajouri Debrote SD-I, Rajouri 63 23.04.2018 25 KVA, Muradpur Petrol Pump, SD-I, Rajouri
ED-Poonch 10 25 KVA, Bunugam, SD-Mandi 5 Bunugam SD-Mandi 25 22.04.2018 100 KVA, mandi, SD-Mandi Mandi SD-Mandi 100 22.04.2018 63 KVA, Skindra, SD-Poonch Skindara SD-Poonch 63 23.04.2018 25 KVA, Bara Char, SD-Mandi Bara Char SD-Mandi 25 23.04.2018 63 KVA, Hari, SD-Surankote Hari SD-Surankote 63 23.04.2018 25 KVA, Dara, SD-Mandi 25 KVA, Loran, SD-Mandi 250 KVA, Poonch Main, SD-Poonch 25 KVA, Shindara, SD-Poonch 63 KVA, Bastidara, SD-Surankote ED-Udhampur 3 25 KVA, Charat, SD-Chenani 8 Plateer SD-II, Udhampur 25 29.01.2018 25 KVA, Laddana, SD-Ramnagar Jakhani SD-Chenani 25 25.02.2018 63 KVA, Loudhra, SD-Ramnagar Khartara SD-II, Udhampur 25 21.03.2018 Channi Manwal SD-II, Udhampur 25 22.03.2018 Lal Mitti SD-Chenani 25 14.04.2018 Champedi SD-Chenani 63 16.04.2018 Thanoa SD-II, Udhampur 25 20.04.2018 Loudhra SD-Ramnagar 25 23.04.2018 ED-Reasi 0 0 32 Jalan SD-Reasi 63 18-12-2016. Seela Bagla SD-Dharmari 25 09-01-2016. Lower Dubri RGGVY SD-Dharmari 25 14-07-2016. Nawal SD-Pouni 25 09-08-2016. Bamaliya SD-Pouni 25 09-08-2016. Banthal SD-Dharmari 25 22-11-2016. PHE Salai SD-Dharmari 25 16-12-2016. Lamsora Pattian SD-Reasi 63 18-01-2017. Karka Panchi SD-Dharmari 63 30.01.2017 Dhanour Gosal SD-Dharmari 25 05.02.2017 Fakori SD-Reasi 25 28-02-2017. Jamslan SD-Dharmari 63 06.03.2017 Haroge Mamankote SD-Dharmari 25 08.04.2017 Bansi Kanikote SD-Dharmari 25 08.04.2017 Lamsora SD-Reasi 25 12.04.2017
Fari SD-Dharmari 63 24.04.2017 Talwara Zeromorh SD-Pouni 63 19.06.2017 Hariwala SD-Dharmari 25 19.06.2017 Judda Tansal SD-Dharmari 25 21.06.2017 Marie Pouni SD-Pouni 63 30.07.2017 Chatwal SD-Pouni 63 29.08.2017 Pattian SD-Dharmari 25 18.03.2018 Lar SD-Dharmari 25 18.03.2018 Chirala SD-Dharmari 25 19.03.2018 Salal Devta SD-Dharmari 63 19.03.2018 Batir Kanthan SD-Dharmari 25 19.03.2018 Upper Kassi SD-Dharmari 25 29.03.2018 Larh Jamslan SD-Dharmari 25 30.03.2018 Blada SD-Dharmari 25 31.03.2018 Budhan SD-Dharmari 25 12.04.2018 Lalasa SD-Reasi 25 13.04.2018 Harotekote-II SD-Reasi 25 13.04.2018 ED-Batote 0 0 16 Fagmuta SD-Banihal 63 29.03.2018 Summer SD-Banihal 25 11.04.2018 Kowdhar SD-Banihal 25 12.04.2018 Gugwani SD-Banihal 25 13.04.2018 Madnihal SD-Banihal 25 14.04.2018 Chidoos SD-Banihal 25 14.04.2018 Zaradi SD-Banihal 25 15.04.2018 Tungali SD-Ramban 25 15.04.2018 Maswa SD-Ramban 25 16.04.2018 Grattan SD-Ramban 25 16.04.2018 Famrote-I SD-Ramban 63 17.04.2018 Salbala SD-Ramban 100 17.04.2018 Kanthi SD-Ramban 63 18.04.2018 Chachal Mohalla SD-Ramban 25 18.04.2018 Poni SD-Ramban 25 19.04.2018 Bilwat SD-Ramban 25 19.04.2018
ED-Doda 2 25 KVA, Lonepura Bagla, SD-I, Doda 6 Sanool SD-I, Doda 25 20.04.2018 25 KVA, Rehnote, SD-I, Doda Gadan SD-I, Doda 25 20.04.2018 Gagla SD-II, Doda 25 21.04.2018 Dherna SD-II, Doda 25 21.04.2018 Lonepura Bagla SD-I, Doda 25 22.04.2018 Rehnote SD-I, Doda 25 23.04.2018 ED-Kishtwar 4 25 KVA,Dabranoo, SD-Thathri 18 Loharna SD-Chatroo 25 18.03.2018 25 KVA, Bhandekhra, SD-Thathri Phatas SD-Kishtwar 25 19.03.2018 25 KVA, Sharak, SD-Thathri Tilogra-C SD-Bhalessa 25 29.03.2018 25 KVA, Kuchhan, SD-Chatroo Dajji Bagwana SD-Chatroo 25 07.04.2018 Brami SD-Thathri 25 07.04.2018 Daground SD-Bhalessa 63 08.04.2018 Bhatni SD-Bhalessa 25 11.04.2018 Kuti SD-Bhalessa 25 12.04.2018 Sanwara Bunjwar SD-Bhalessa 63 13.04.2018 Chandra SD-Thathri 25 14.04.2018 Phulgowari SD-Thathri 25 15.04.2018 Charwah SD-Thathri 25 15.04.2018 HRT Hasti SD-Kishtwar 250 16.04.2018 Noose SD-Kishtwar 25 20.04.2018 Pinjraie SD-Chatroo 25 20.04.2018 Uppr Tender SD-Chatroo 25 20.04.2018 Champara Trigam SD-Kishtwar 25 21.04.2018 Dharanji Sarthal SD-Kishtwar 25 21.04.2018 Total 55 121 Chief Engineer, EM&RE Wing, PDD, Jammu
Name of the Division Daily status (Division-wise) of transformers damaged, replaced and balance to be replaced as on 22nd & 23rd April 2018 in respect of Elect. M&RE Wing, Jammu Total no. of DTs in the Div. Transformers Damaged Total DTs damaged in system as on date during 2018-19 Transformers replaced Total DTs replaced in system as on date during 2018-19 During April During April 2018 During April 2018 upto During April 2018 2018 as on 22nd & 21st April upto 21st April as on 22nd & 23rd April 23rd April ED-I, Jammu 1504 12 4 16 12 4 16 0 ED-II, Jammu 4603 54 11 65 54 11 65 0 ED-III, Jammu 3203 38 0 38 27 0 27 11 ED-Vijaypur 3406 31 10 41 24 7 31 10 ED-Kathua 3873 21 6 27 14 7 21 6 ED-Rajouri 2705 48 5 53 46 3 49 4 ED-Poonch 1948 0 10 10 0 5 5 5 ED-Udhampur 2075 28 3 31 23 4 27 4 ED-Reasi 1495 18 0 18 15 0 15 3 ED-Batote 1071 16 0 16 1 0 1 15 ED-Doda 1204 39 2 41 35 0 35 6 No.of damaged DTs yet to be replaced in system as on date ED-Kishtwar 1294 28 4 32 13 4 17 15 Total 28381 333 55 388 264 45 309 79 Name of Division Opening Balance for the year Daily replacement as on date 2018-19 ED-III, Jammu 5 0 ED-Rajouri 2 2 ED-Udhampur 4 0 ED-Reasi 29 0 ED-Batote 1 0 ED-Kishtwar 3 0 Total 44 2 Balance =44-2= 42 Note:- Total no. of X-mers yet to be repaired as on 23-04-2018 for the year (2018-19) = 42+ 79= 121 Chief Engineer, EM&RE Wing, PDD, Jammu