Document 6.2. Four Ashes Ltd

Like dokumenter
REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

Start Here USB *CC * *CC * USB USB

KAMPANJE APK : APK-5: Skifte pakninger mellom turbo og CCDPF

Justeringsanvisninger finnes på de to siste sidene.

Hva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

1 BANESTRØMFORSYNING TOGVARMEANLEGG KONTAKTLEDNINGSANLEGG... 5

Slope-Intercept Formula

229 SONATA Manual NO_ENG 1.04

Naturdata Nordområdene

Speed Racer Theme. Theme Music: Cartoon: Charles Schultz / Jef Mallett Peanuts / Frazz. September 9, 2011 Physics 131 Prof. E. F.

Kalibrering. Hvordan sikrer Norsonic sporbarhet av måleresultatene. Ole-Herman Bjor

MÅLING AV LYD FRA MOTOCROSS- OG ENDURO MOTORSYKLER 2 meter MAX 115db

Astro Calendar 2001 v 1.03 by Yasuji Yamanaka

Bytte til split Collin Lanyard RSL. Obligatorisk - alle rigger skal ha dette montert ved hopping etter

Astro Calendar 2002 v 1.00 by Yasuji Yamanaka

Uninterruptible Power Supply On-line Double Conversion 7.5KVA - 600KVA

Astro Calendar '99 v 1.08 by Yasuji Yamanaka

DM6814/DM5814 User s Manual

Exercise 1: Phase Splitter DC Operation

MCP-16RC, luftrenertårn

Environmental sensitivity. Assessment by MOIRA PLUS Lakes Øvre Heimdalsvatn (Norway) Bracciano (Italy)

SENSORS. HAIN An Integrated Acoustic Positioning and Inertial Navigation System

Windlass Control Panel

PSi Apollo. Technical Presentation

Accuracy of Alternative Baseline Methods

Utøver går med feil lårnummer (og riktig startnummmer/brikke).

Data Sheet for Joysticks

Instruksjons manual Instruction manual

Quantitative Spectroscopy Chapter 3 Software

Salting of dry-cured ham

STANDARD IEC :2006

bondura Multi Tool 200 Hydraulic Ø200mm - Ø320mm user manual - for disassembly

Monteringsprosedyre for Soundstop - lydmatte

SafeRing / SafePlus Retrofit of auxiliary switch S10 for position indication of earthing switch De module

Energy Calibration for the Forward Detector at WASA-at-COSY

Note 39 - Investments in owner interests

Hegel H4A High End Power Amplifier

NORM PRICE FOR CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1 st QUARTER 2015

FOLLOBANEN STØYKARTLEGGING ANLEGGSAKTIVITET VED KLYPEN - OSLO S

Improvement in HSE / Operational Performance

SafeRing / SafePlus Retrofit of auxiliary switch S7 & S10 for position indication of load break switch and earthing switch C, F and SI modules

Estimating Peer Similarity using. Yuval Shavitt, Ela Weinsberg, Udi Weinsberg Tel-Aviv University

KALIBRERINGSBEVIS Certificate of calibration

BenchTop avtrekksarm FX2 75 ESD/EX

Subsea-Muligheter for virksomhet i den maritime klyngen. Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019

Flomnivåer er beregnet for forskjellige gjentaksintervaller og er presentert i tabellen nedenfor:

INSTALLATION GUIDE FTR Cargo Rack Regular Ford Transit 130" Wheelbase ( Aluminum )

BenchTop Extraction Arm FX2

Metodisk kvalitetsvurdering av systematisk oversikt. Rigmor C Berg Kurs H, mars 2019

De unges seervaner? Analyse, NRK 2

Norwegian s erfaringer med dagens rutetilbud på Vigra, og nye muligheter i fremtiden. Lars Sande Sales direktør lars@norwegian.no

Berøringsfritt eksosavtrekkssystem

Hvordan gjennomføre store seismiske innsamlinger. Gunhild Myhr, PGS Fisk og Seismikk 5-6 April Tromsø 2017

EFFICIENCY, SAFETY, ECONOMY AND HEALTH

Bedriftenes møteplass. Thina Margrethe Saltvedt, 02 April 2019

Innhold. Instruks for melding av hærverk. ID1743-a- hærverk. IE76286-b- Trafikkdetektor Leggebeskrivelse E og E

International Match U 18 CZE - HUN - SLO - SVK

Capstan type HC03 Capstan type HC03

Note 39 - Investments in owner interests

Note 38 - Investments in owner interests

DNB Health Care. Helsesektoren En investors drøm. September Knut Bakkemyr (Forvalter, DNB Health Care)

Luftlekkasjetest -Differansetrykkmetoden

PARABOLSPEIL. Still deg bak krysset

XUSL4E3BB081L ( ) Typ 4 3 stråler kropaft 810mm

ER TV DØDT ELLER GJENFØDT? TV-SEING I DEN NYE MEDIEVERDENEN. Norsk Forening for Opphavsrett, 7. desember 2015.

Forecast Methodology September LightCounting Market Research Notes

Statens vegvesen. Testene tilfredsstiller kravene til styrkeklasse T3 med en målt arbeidsbredden på 0,7m.

RE ( ) Tidsrelé plugg multi V

Method validation for NO (10 ppm to 1000 ppm) in nitrogen using the Fischer Rosemount chemiluminescence analyser NOMPUMELELO LESHABANE

RESIDENT PROGRAM DIRECTOMENTOR ADVISOR PROJECT ADVISOR STAFFING PRECEPTOR Lauren Caruso Kate Schaafsma Cal Van Epern Mindy Waggoner Jordan Spillane

Tema Fusion Monteringsanvisning

BenchTop Extraction Arm FX2

SafeRing / SafePlus Retrofit of auxiliary switch S9 for fuse blown indication F module

Case 9:12-cv DMM Document 4-5 Entered on FLSD Docket 12/06/2012 Page 1 of 62

Kjell Arne Mork, Francisco Rey, Henrik Søiland

Engelsk gruppe 2 høsten 2015

HONSEL process monitoring

Right Triangle Trigonometry

bondura Multi Tool 200

Endringer i neste revisjon av EHF / Changes in the next revision of EHF 1. October 2015

Dokumentasjon. Prosjektdagbok Timelister. Rolled Up Task. Rolled Up Milestone. Rolled Up Progress. Split. Page 1

bondura dual 36 Ø50mm - Ø200mm assembly & inspection manual art rev A

PETROLEUM PRICE BOARD

SERVICE BULLETINE

PETROLEUM PRICE BOARD

Kysten rundt. Gjennomgang av offshore byggeprosjekter på norske verft sist år. Thor Dahl, NFS

ESTABLISHING A EUROPEAN HIGH POWER CHARGING NETWORK JAN HAUGEN IHLE, REGIONSDIREKTØR NORTHERN EUROPE, IONITY. IONITY Präsentation October 2018

BenchTop Extraction Arm FX2

Narvik Havn KF anno Rune Johan Arnøy Havnedirektør

Nåværende EU-rett Dir 96/3/EC

Hungary, 1st quarter 2019

Modellering av lyd fra seismikk i forhold til havbunnstopografi

Merak Un-glazed Porcelain Wall and Floor Tiles

6350 Månedstabell / Month table Klasse / Class 1 Tax deduction table (tax to be withheld) 2012

Andrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen

Interaction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction

Transkript:

Document 6.2 West Midlands Rail Freight Interchange Order 201X Technical Appendix 13.3 - Full Survey Results Regulation 5(2)(a) Resound - July 2018 Four Ashes Ltd

Technical Appendix 13.3: Full Survey Results (2) Table A13.3.1: Noise monitoring equipment August 2016 Survey Position Model Serial Number Calibration Certificate Issue Date Larson Davis 820 Type 1 SLM 1350 N1 Larson Davis PRM 828 Pre-amplifier 1568 2 June 2016 GRAS 40AE Microphone 37024 Larson Davis 824 Type 1 SLM 824A1419 N2 Larson Davis PRM902 Pre-amplifier 2732 4 August 2016 GRAS 40AE Microphone 31817 N3 01dB Cube Type 1 SLM 10692 GRAS 40CD Microphone 224253 18 February 2015 01dB Black Solo Type 1 SLM 65682 N5 01dB PRE21S Pre-amplifier 16310 28 April 2016 MCE212 Microphone 153491 N6 (1) Larson Davis PRM902 Pre-amplifier 1924 2 June 2016 Larson Davis 824 Type 1 SLM 824A1309 GRAS 40AE Microphone 28488 Larson Davis 820 Type 1 SLM A1144 N7 Larson Davis PRM 828 Pre-amplifier 2054 2 June 2016 GRAS 40AE Microphone 31825 N8 01dB Cube Type 1 SLM 10694 GRAS 40CD Microphone 224223 12 March 2015 NH-25 Pre-amplifier 21005 9 November 2015 Rion NL52 SLM 00620964 N9 UC-59 Microphone 03884 N5 01dB Cal21 calibrator 34134139 28 April 2016 N3, N8 01dB Cal21 calibrator 51030984 6 June 2016 N1, N7 Larson Davis CAL200 calibrator 3055 8 April 2016 N2, N6 Larson Davis CAL200 calibrator 3724 2 June 2016 V1 Rion VM-54 Vibration Meter 01150116 PV-83CW Tri-axial accelerometer 28068 22 June 2016 V2 Rion VM-54 Vibration Meter 00360140 PV-83CW Tri-axial accelerometer 85802 23 June 2016 Notes: (1) data not used. No calibration certificate included. (2) sound level meter has internal electrical calibration system, no external acoustic calibrator was used. Table A13.3.2: Noise monitoring equipment October 2016 Survey Position Model Serial Number Calibration Certificate Issue Date N6 01dB Fusion Type 1 sound level meter 10919 12 January 2016 GRAS 40CE Microphone 226375 01dB Cal21 Calibrator 35183004 23 February 2016

Table A13.3.3: Noise monitoring equipment January 2017 Survey Position Equipment Serial Number Calibration Certificate Issue Date Larson Davis 824 Type 1 sound level meter 824A1309 N1 Larson Davis PRM902 pre-amplifier 1924 2 June 2016 GRAS 40AE microphone 28488 Larson Davis 824 Type 1 sound level meter 824A1419 N2 Larson Davis PRM902 pre-amplifier 2732 4 August 2016 GRAS 40AE microphone 31817 N4 01dB Fusion Type 1 sound level meter 10919 GRAS 40CE microphone 226375 12 January 2016 01dB Blue Solo Type 1 sound level meter 60582 N5 01dB PRE21S pre-amplifier 13510 8 January 2016 01dB MCE 212 microphone 90416 N6 01dB Fusion Type 1 sound level meter 10325 GRAS 40CE microphone 207533 6 May 2016 01dB Black Solo Type 1 SLM 65682 N7 01dB PRE21S Pre-amplifier 16310 28 April 2016 MCE212 Microphone 153491 01dB Duo Type 1 sound level meter 10522 N8 01dB PRE22 pre-amplifier 10271 19 May 2016 GRAS 40CD microphone 136978 01dB Duo Type 1 sound level meter 10507 N9 01dB PRE22 pre-amplifier 10211 9 May 2016 GRAS 40CD microphone 161946 N4, N6, N8, N9 01dB Cal21 calibrator 51030984 6 June 2016 N5 01dB Cal01 calibrator 980058 5 January 2017 N7 01dB Cal21 calibrator 34134139 28 April 2016 N2 Larson Davis CAL200 calibrator 3055 8 April 2016 N1 Larson Davis CAL200 calibrator 3723 2 June 2016

Figure A13.3.17: L A90 distribution, daytime, August 2016, Position N1 Figure A13.3.18: L A90 distribution, night-time, August 2016, Position N1

Figure A13.3.19: L A90 distribution, daytime, August 2016, Position N2 Figure A13.3.20: L A90 distribution, night-time, August 2016, Position N2

Figure A13.3.21: L A90 distribution, daytime, August 2016, Position N3 Figure A13.3.22: L A90 distribution, night-time, August 2016, Position N3

Figure A13.3.23: L A90 distribution, daytime, August 2016, Position N5 Figure A13.3.24: L A90 distribution, night-time, August 2016, Position N5

Figure A13.3.25: L A90 distribution, daytime, October 2016, Position N6 Figure A13.3.26: L A90 distribution, night-time, October 2016, Position N6

Figure A13.3.27: L A90 distribution, daytime, August 2016, Position N7 Figure A13.3.28: L A90 distribution, night-time, August 2016, Position N7

Figure A13.3.29: L A90 distribution, daytime, August 2016, Position N8 Figure A13.3.30: L A90 distribution, night-time, August 2016, Position N8

Figure A13.3.31: L A90 distribution, daytime, August 2016, Position N9 Figure A13.3.32: L A90 distribution, night-time, August 2016, Position N9

Figure A13.3.33: L Aeq distribution, daytime, August 2016, Position N1 Figure A13.3.34: L Aeq distribution, night-time, August 2016, Position N1

Figure A13.3.35: L Aeq distribution, daytime, August 2016, Position N2 Figure A13.3.36: L Aeq distribution, night-time, August 2016, Position N2

Figure A13.3.37: L Aeq distribution, daytime, August 2016, Position N3 Figure A13.3.38: L Aeq distribution, night-time, August 2016, Position N3

Figure A13.3.39: L Aeq distribution, daytime, August 2016, Position N5 Figure A13.3.40: L Aeq distribution, night-time, August 2016, Position N5

Figure A13.3.41: L Aeq distribution, daytime, October 2016, Position N6 Figure A13.3.42: L Aeq distribution, night-time, October 2016, Position N6

Figure A13.3.43: L Aeq distribution, daytime, August 2016, Position N7 Figure A13.3.44: L Aeq distribution, night-time, August 2016, Position N7

Figure A13.3.45: L Aeq distribution, daytime, August 2016, Position N8 Figure A13.3.46: L Aeq distribution, night-time, August 2016, Position N8

Figure A13.3.47: L Aeq distribution, daytime, August 2016, Position N9 Figure A13.3.48: L Aeq distribution, night-time, August 2016, Position N9

Figure A13.3.49: L A90 distribution, daytime, January 2017, Position N1 Figure A13.3.50: L A90 distribution, night-time, January 2017, Position N1

Figure A13.3.51: L A90 distribution, daytime, January 2017, Position N2 Figure A13.3.52: L A90 distribution, night-time, January 2017, Position N2

Figure A13.3.53: L A90 distribution, daytime, January 2017, Position N4 Figure A13.3.54: L A90 distribution, night-time, January 2017, Position N4

Figure A13.3.55: L A90 distribution, daytime, January 2017, Position N5 Figure A13.3.56: L A90 distribution, night-time, January 2017, Position N5

Figure A13.3.57: L A90 distribution, daytime, January 2017, Position N6 Figure A13.3.58: L A90 distribution, night-time, January 2017, Position N6

Figure A13.3.59: L A90 distribution, daytime, January 2017, Position N7 Figure A13.3.60: L A90 distribution, night-time, January 2017, Position N7

Figure A13.3.61: L A90 distribution, daytime, January 2017, Position N8 Figure A13.3.62: L A90 distribution, night-time, January 2017, Position N8

Figure A13.3.63: L A90 distribution, daytime, January 2017, Position N9 Figure A13.3.64: L A90 distribution, night-time, January 2017, Position N9

Figure A13.3.65: L Aeq distribution, daytime, January 2017, Position N1 Figure A13.3.66: L Aeq distribution, night-time, January 2017, Position N1

Figure A13.3.67: L Aeq distribution, daytime, January 2017, Position N2 Figure A13.3.68: L Aeq distribution, night-time, January 2017, Position N2

Figure A13.3.69: L Aeq distribution, daytime, January 2017, Position N4 Figure A13.3.70: L Aeq distribution, night-time, January 2017, Position N4

Figure A13.3.71: L Aeq distribution, daytime, January 2017, Position N5 Figure A13.3.72: L Aeq distribution, night-time, January 2017, Position N5

Figure A13.3.73: L Aeq distribution, daytime, January 2017, Position N6 Figure A13.3.74: L Aeq distribution, night-time, January 2017, Position N6

Figure A13.3.75: L Aeq distribution, daytime, January 2017, Position N7 Figure A13.3.76: L Aeq distribution, night-time, January 2017, Position N7

Figure A13.3.77: L Aeq distribution, daytime, January 2017, Position N8 Figure A13.3.78: L Aeq distribution, night-time, January 2017, Position N8

Figure A13.3.79: L Aeq distribution, daytime, January 2017, Position N9 Figure A13.3.80: L Aeq distribution, night-time, January 2017, Position N9

Table A13.3.4: Vibration monitoring equipment August 2016 Survey Position Model Serial Number Calibration Date V1 Rion VM-54 Tri-axial Vibration Meter 01150116 PV-83CW Accelerometer 28068 22 June 2016 V2 Rion VM-54 Tri-axial Vibration Meter 00360140 PV-83CW Accelerometer 85802 23 June 2016 Table A13.3.5: Noise monitoring equipment Widnes Terminal Survey Position Model Serial Number Calibration Date 01dB Blue Solo Type 1 SLM 60582 Widnes 01dB PRE21S Pre-amplifier 13510 8 January 2016 Terminal MCE212 Microphone 90416 01dB Cal01 Calibrator 950058 7 January 2016 Table A13.3.6: Survey Results Start Duration Time (Secs) LAeq,T LAFmax Source Distance (metres) 11:54 41.4 62.2 (1) 73.3 Train backing into holding 3.15 12:09 8 74.1 (1) 79.5 HGV passing 1.5 12:09 10 75.6 (1) 82.4 HGV passing 1.5 12:12 17.8 78.9 (1) 83.3 HGV idling 1.5 12:12 17.2 79.7 (1) 89.8 Idling HGV pulling away 1.5 12:14 25.2 67.9 (1) 71.4 Crane lowering container on to HGV in Bay 12:15 28.4 75.2 (1) 90.4 Container down on to HGV trailer 6.7 12:15 2.6 73.7 (1) 79.6 Crane disconnecting from container 6.7 12:15 2.8 68.6 (1) 70.5 Crane moving 13.5 12:18 1.7 69.9 (1) 73.2 HGV starting up 6.7 12:18 10 67.9 (1) 69.5 HGV idling 6.7 12:19 8.7 71.4 (1) 74.0 HGV pulling away 6.7 12:19 7.5 71.3 (1) 74.9 HGV pulling up 6.7 12:20 1 74.4 (1) 76.1 HGV air brakes 6.7 12:20 23.2 70.7 (1) 73.4 HGV idling 6.7 12:22 8 76.7 (1) 85.8 Container being loaded onto trailer 20 12:27 70 73.9 (1) 87.3 HGV passing 1.5 12:28 8.6 77.4 (1) 82.1 HGV passing 1.5 12:30 34 71.4 (1) 75.2 Crane lowering container on to HGV in Bay 13.5 12:30 6.4 79.4 (1) 89.4 Container down on to HGV trailer 13.5 12:31 12 69.9 (1) 74.4 Crane grab releasing container and moving up 12:31 33 68.0 (1) 79.2 Crane moving without container 13.5 13:01 3 82.4 (1) 91.6 Crane grab connecting to container 11.5 13:01 1.6 72.9 (1) 78.6 Crane lifting container from trailer 11.5 13:09 17.2 75.5 (1) 83 HGV passing 1.5 13:12 13.2 71.1 (1) 76.0 HGV passing 6.7 13:13 40.6 85.3 (1) 95.1 Reach Stacker drive past 2 14:06 163.4 92.9 (2) 107.8 Train pulling away 4.4 14:12 1.8 79.0 (2) 85.5 Crane connecting to container 3.7 6.7 13.5

Start Time Duration (Secs) LAeq,T LAFmax Source Distance (metres) 14:13 5.4 86.2 (2) 94.3 Crane drop and disconnect of container 3.7 14:13 3.8 81.3 (2) 88.4 Crane connecting to container 3.7 14:13 5.4 85.6 (2) 96.8 Crane drop and disconnect of container 14:13 2.8 82.4 (2) 91.7 Crane connecting to container 3.7 14:14 28.2 64.6 (2) 73.8 Crane moving with container 3.7 14:24 8.8 81.0 (3) 88.2 Reach stacker revving up 16 14:25 10.2 82.7 (3) 89.4 Reach stacker accelerating 16 14:25 1.2 93.3 (3) 99.3 Reach stacker connecting to container 16 14:25 7.4 83.4 (3) 89.6 Reach stacker reversing with container 16 14:25 6.4 83.5 (3) 86.1 Reach stacker moving forward with container 16 14:25 4 82.5 (3) 87.3 Reach stacker putting down container 9 14:26 5.8 80.5 (3) 84.4 Reach stack reversing and accelerating without container 9 14:27 13 84.7 (3) 95.0 Reach stacker connecting to container 16 14:27 1 89.8 (3) 95.0 Reach stacker putting down container 16 14:27 8.2 80.0 (3) 82.7 Reach stacker reversing with container 16 14:27 16.6 77.6 (3) 85.6 Reach stacker putting down container 16 14:27 10.6 80.5 (3) 84.2 Reach stacker reversing without container 16 14:28 8.6 81.4 (3) 85.0 Reach stacker accelerating without container 16 14:28 1.4 85.2 (3) 91.2 Reach stacker connecting to container 16 14:28 6.6 81.1 (3) 85.0 Reach stacker reversing with container 16 14:28 7.6 80.8 (3) 83.1 Reach stacker accelerating with container 16 14:28 1.2 86.8 (3) 90.4 Reach stacking putting down container 16 14:28 9.8 83.5 (3) 87.5 Reach stacker reversing without container 10 14:29 8.4 73.8 (3) 76.8 Reach stacker moving towards HGV 16 14:29 4.2 81.3 (3) 88.5 Reach stacker connecting to container 16 14:30 1.8 83.9 (3) 87.4 Reach stacker putting container down 10 14:46 12.4 66.7 (4) 69.9 Crane lower container down 11.5 14:46 8.8 88.0 (4) 103.1 Container onto HGV 11.5 14:46 21.4 68.8 (4) 79.4 crane grabber disconnect and back up 14:47 25 69.2 (4) 80.0 crane grabber lower 11.5 14:47 4.8 75.9 (4) 84.6 connect to container on trailer 11.5 14:47 17.6 69.2 (4) 75.5 crane lift up container 11.5 14:51 15.2 74.2 (4) 79.3 HGV pull away 2 3.7 11.5

Start Time Duration (Secs) LAeq,T LAFmax Source Distance (metres) 14:52 45.6 71.0 (4) 76.8 Crane lower container down 13.5 14:53 12.6 75.7 (4) 88.3 Container onto HGV 13.5 14:54 35.2 70.2 (4) 77.5 Grabber disconnect and back up 13.5 14:55 19 68.4 (4) 71.2 Crane moving 15 12:48 24 56.4 61.4 Residual 1-13:39 57 58.0 60.4 Residual 2-14:00 35 46.1 53.7 Residual 3-14:56 40 57.5 60.4 Residual 4 - Notes: (1) Stated L Aeq levels corrected from measured level by logarithmically subtracting Residual 1 (2) Stated L Aeq levels corrected from measured level by logarithmically subtracting Residual 2 (3) Stated L Aeq levels corrected from measured level by logarithmically subtracting Residual 3 (4) Stated L Aeq levels corrected from measured level by logarithmically subtracting Residual 4