1 Arctic Safety 2018 Petroleum Safety Authority Kjell-Gunnar Dørum Petroleum Safety Authority Stavanger, Norway Sigurd R Jacobsen Petroleum Safety Authority Stavanger, Norway

2 Contents Background Projects SINTEF Challenges, measures and solutions Proactima Develop evaluation method, phase 1 Apply evaluation method, phase 2 Results Conclusion

3 Background White Paper, Meld. St. 36, Opening of Barents Sea South East NORTH projects PSA Knowledge and awareness Winterization Many solutions and measures Many guidelines and standards

4 Site Specific conditions Requirements - efficiency Temperature Solution Wind Solution Solution Operation envelope Precipitation Solution Solution

5 Objective Study winterization issues, measures and solutions and prevent harm to health, safety and the environment Provide an overview of known (applied) solutions and measures for the winterization of facilities operating in the Barents Sea Develop method to evaluate effect of winterization measures effectiveness, strengths or weaknesses of a solution or measure Apply method to all identified solutions and measures Limitations Covers areas opened for petroleum activities in the Norwegian sector of the Barents Sea

6 Winterization projects Identify issues and measures Efficiency of measures METHOD Evaluate efficiency RESULTS

7 SINTEF report - method Review of 7 winterization manuals from production and drilling operators Review of available standards, guidelines and publications Project team's experience of winterization of drilling and production units

8 Results - main challenges Main challenges Icing and snow on exposed surfaces Freezing of fluids and liquids in pipes and tanks Exposure of people to low temperatures Causes Icing Snow Low temperatures Main issue Specific issue (solutions/measures 186) Icing Snow Low temperatures A1 Icing/snow on structures/platform decks/laydown areas (15) A2 Icing/snow on general equipment (14) A3 Icing/snow on safety critical equipment (19) A4 Icing/snow on evacuation means (13) A5 Icing/snow in air intake/-exhaust and tank-vents (10) A6 Sea ice/slush seawater intakes (4) A7 Falling ice and snow (15) B1 Snow and ice on escape and transport (19) B2 Snow and ice on helideck (8) B3 Snow and ice in deck drainage (6) C1 Material and equipment characteristics (3) C2 Freezing of fluids in pipes and hoses (13) C3 Freezing of fluids in tanks and containers (12) C4 Freezing of lubrication oils/hydraulic oils/fuel (6) C5 Condensation in compressed air systems (4) C6 Condensation in HVAC systems (4) C7 Personnel exposure for low wind chill temperatures/ weather (21)

9 Results - issues and measures Main issue Specific issue (solutions/measures 186) A1 Icing/snow on structures/platform decks/laydown areas (15) Icing Snow Low temperatures A2 Icing/snow on general equipment (14) A3 Icing/snow on safety critical equipment (19) A4 Icing/snow on evacuation means (13) A5 Icing/snow in air intake/-exhaust and tank-vents (10) A6 Sea ice/slush seawater intakes (4) A7 Falling ice and snow (15) B1 Snow and ice on escape and transport (19) B2 Snow and ice on helideck (8) B3 Snow and ice in deck drainage (6) C1 Material and equipment characteristics (3) C2 Freezing of fluids in pipes and hoses (13) C3 Freezing of fluids in tanks and containers (12) C4 Freezing of lubrication oils/hydraulic oils/fuel (6) C5 Condensation in compressed air systems (4) C6 Condensation in HVAC systems (4) C7 Personnel exposure for low wind chill temperatures/ weather (21) A1 Icing, snow on Solutions/Measures structures, platform decks/ laydown areas A1-1 Plattform orientation/layout A1-2 Manual removal with mechanical equipment A1-3 Steam (Stationary or portable units) A1-4 Ice-phobic coatings A1-5 Heating medium (WHRU) A1-6 Heat tracing A1-7 De-icing chemicals (environmental friendly) A1-8 Periodic inspection A1-9 Electric fans A1-10 Heat generators A1-11 Diesel heaters A1-12 Flushing/high pressure flushing with hot water A1-13 Snow removal with truck A1-14 Salting A1-15 Flushing with seawater (south in the Barents Sea) A1 - Known solutions and measures for icing/snow on structures/ platform decks/ laydown areas

10 Proactima (phase 1) Develop method for evaluation «One pager» evaluation for each measure Effect of the measure given temperature, wind and precipitation Effect of the measure on energy consumption given temperature, wind and precipitation Effect of the measure on cost investment and operating cost Vulnerability of the measure operational and organisational Tiltak B2-4 Avisingsutstyr, varmekabler/tråder Kategori Beredskap Hovedproblem B Is/snø akkumulering på strukturer og flater Sårbarhet for operasjonelle og organisatoriske forho 1 Delproblem B2 Ising og snø på helikopterdekk KM Virkning > 20 m/s 5 God effekt Brukbar effekt Noe effekt Ingen/liten effekt Ingen/liten effekt Noe effekt >20 mm/døgn Svært god effekt Brukbar effekt Noe effekt Ingen/liten effekt Ingen/liten effekt Brukbar effekt Svært god effekt Brukbar effekt Brukbar effekt Noe effekt Noe effekt God effekt Svært god effekt God effekt Brukbar effekt Noe effekt Noe effekt God effekt Svært god effekt God effekt God effekt Brukbar effekt Brukbar effekt Svært god effekt (-5) (-5) - (-10) (-10) - (-20) < (-20) Nedbør (mm/døgn) Temperatur (grader C) Effekt på energiforbruk Vind m/s Vind m/s > 20 m/s 5 Noe påvirkning Høy påvirkning Svært høy påvirkning Svært høy påvirkning Svært høy påvirkning Noe påvirkning Moderat påvirkning Moderat påvirkning Svært høy påvirkning Svært høy påvirkning Noe påvirkning Moderat påvirkning Moderat påvirkning Moderat påvirkning Høy påvirkning Noe påvirkning Moderat påvirkning Moderat påvirkning Moderat påvirkning Høy påvirkning 0 1 Noe påvirkning Moderat påvirkning Moderat påvirkning Moderat påvirkning Høy påvirkning (-5) (-5) - (-10) (-10) - (-20) < (-20) Temperatur (grader C) Tiltakskost - Kategori Investering Drift Høy Høy Kommentar, fritekst Mye nedbør kan kreve f.eks manuell fjerning i tillegg til varmetråder

11 Apply method (phase 2) Evaluation of all identified measures and solutions will be performed Qualitative evaluation by work group comprising experienced proffessionals «One pager» for all identified measures and solutions Document result of evaluations Report expected 3Q 2018 Plan to publish report on PSA website 4Q 2018

12 Conclusion Work so far indicates that: a large variety of solutions and measures are available for each winterization issue there may be a challenge to find the optimal combination of solutions and measures for different conditions at specific locations It appears that identified measures and solutions, technical, operational and organizational, ensure safe and efficient operations in the Barents Sea

13 Report (SINTEF) can be downloaded from: Thank you for your attention

14 Results - Operational and organisational measures Competence and training education and training in proper use of winter technology defensive behaviour with respect to falling ice and slippery surfaces Stop work Essential equipment out of order, slippery work areas or potential for falling ice and snow work should only be performed when safe and normal working conditions are in place Power and heating Ensure sufficient power and heat for winterization measures, e.g. heating, HVAC, process heat, etc. Inventories of consumables Ensure sufficient inventories of consumer articles related to winterization and operation before each winter season Checklists for inspections before and during winter season, secure areas and equipment when temperature drops towards freezing when low temperatures are expected, the platform management should go through planned measures for inspection and action. Responsibility for various activities, areas and checklist should be clear.

15 Results - relevant standards and guidelines Publication DNVGL-OS-A201 (2015) Title Winterization for cold climate operations IMO Polar Code (2016) ISO 19906:2010 Lloyd s (2015) ABS (2016) NORSOK S-002:2004 (Draft ed. 5, Sept 2015) ISO/DIS (2016) International code for ships operating in polar waters Petroleum and natural gas industries - Arctic Offshore Structures Provisional Rules for the Winterisation of Ships Guide for vessels operating in low temperature environments Working environment Two year multi client industry project (2013) Arctic Operations Handbook Petroleum and natural gas industries Arctic operations Working environment

Internasjonal standardisering av HMS i arktiske strøk

Internasjonal standardisering av HMS i arktiske strøk Internasjonal standardisering av HMS i arktiske strøk Arctic Operations (ISO TC67 SC8) Arne Haugan Advisor WET ISO standards Arctic Operations 2 Arctic Operations (ISO TC67 SC8) Barents 2020 prosjektet

Detaljer

Konstruksjonsstål for arktiske forhold krav til sveisbarhet og egenskaper. Norsk Korrosjonsteknisk forening Mons Hauge, Statoil

Konstruksjonsstål for arktiske forhold krav til sveisbarhet og egenskaper. Norsk Korrosjonsteknisk forening Mons Hauge, Statoil Konstruksjonsstål for arktiske forhold krav til sveisbarhet og egenskaper Norsk Korrosjonsteknisk forening 2016-06-02 Mons Hauge, Statoil The Arctic Materials Project Goals: Safe and cost-effective application

Detaljer

Climate change and adaptation: Linking. stakeholder engagement- a case study from

Climate change and adaptation: Linking. stakeholder engagement- a case study from Climate change and adaptation: Linking science and policy through active stakeholder engagement- a case study from two provinces in India 29 September, 2011 Seminar, Involvering ved miljøprosjekter Udaya

Detaljer

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no Public roadmap for information management, governance and exchange 2015-09-15 SINTEF david.norheim@brreg.no Skate Skate (governance and coordination of services in egovernment) is a strategic cooperation

Detaljer

Godkjenning av hydrogen som drivstoff på skip

Godkjenning av hydrogen som drivstoff på skip Godkjenning av hydrogen som drivstoff på skip Kolbjørn Berge Sjøfartsdirektoratet Innhold Nasjonalt regelverk Internasjonalt regelverk IGF Alternativt design MSC.1/Circ.1455 - Guidelines for the approval

Detaljer

CYBER SECURITY AUTONOME SYSTEMER. Marie Moe, forskningsleder for Cyber Security,

CYBER SECURITY AUTONOME SYSTEMER. Marie Moe, forskningsleder for Cyber Security, CYBER SECURITY AUTONOME SYSTEMER Marie Moe, forskningsleder for Cyber Security, SINTEF Digital @MarieGMoe @SINTEF_Infosec 2 Noen av våre prosjekter 3 SoS-Agile Secure software development IRIS Evolution

Detaljer

EURES - en tjeneste i Nav. Hjelp til rekruttering av europeisk arbeidskraft

EURES - en tjeneste i Nav. Hjelp til rekruttering av europeisk arbeidskraft EURES - en tjeneste i Nav Hjelp til rekruttering av europeisk arbeidskraft HVA ER EURES? EURES (European Employment Services) er NAV sin europeiske avdeling Samarbeid mellom EU-kommisjonen og arbeidsmarkedsmyndighetene

Detaljer

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo,

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo, Den europeiske byggenæringen blir digital hva skjer i Europa? Steen Sunesen Oslo, 30.04.2019 Agenda 1. 2. CEN-veileder til ISO 19650 del 1 og 2 3. EFCA Guide Oppdragsgivers krav til BIMleveranser og prosess.

Detaljer

Software applications developed for the maritime service at the Danish Meteorological Institute

Software applications developed for the maritime service at the Danish Meteorological Institute Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological

Detaljer

Utfordringer og samarbeid i nordområdene

Utfordringer og samarbeid i nordområdene Utfordringer og samarbeid i nordområdene Lill H. Brusdal, Manager Safety and Sustainability, Operations North 2014-04-06 Agenda Hva er arktis? Erfaring fra operasjoner i Barentshavet Utfordringer i nord

Detaljer

Complete tank expertise

Complete tank expertise Complete tank expertise See your opportunities unfold Damcos VRC systems deliver safety and reliability in a com act cost effective desi n Widespread solutions; in-depth competence understanding of the

Detaljer

FirstEnergy s Ohio Utilities. Energy Efficiency Programs for Business

FirstEnergy s Ohio Utilities. Energy Efficiency Programs for Business FirstEnergy s Ohio Utilities Energy Efficiency Programs for Business 2018 PROGRAM SUMMARY Lighting Program Traffic Signal Lighting HVAC Program Food Service Program Appliances Program Consumer Electronics

Detaljer

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3 Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL

Detaljer

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.

The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers

Detaljer

Naturdata Nordområdene

Naturdata Nordområdene Naturdata Nordområdene Gerhard Ersdal Petroleumstilsynet Generelt Petroleumstilsynet deltar i arbeidet med å utvikle NORSOK N-003, som blant annet inkluderer informasjon om værdata og naturdata for nordområdene

Detaljer

Bruk av vinteriseringsstandard og tilgjengelig satellittkapasitet

Bruk av vinteriseringsstandard og tilgjengelig satellittkapasitet Bruk av vinteriseringsstandard og tilgjengelig satellittkapasitet Barents Sea Exploration Collaboration (BaSEC) er et industrisamarbeid for å forberede leteoperasjoner i Barentshavet. BaSECs siktemål er

Detaljer

What's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid

What's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid Pris kr. 490,- Påmelding til Tone på tj@kph.no Frist: 10. januar 2019 DET ER UTFORDRENDE Å FÅ AVGRENSET OG SATT MÅL FOR DIGITALISERINGSPROSJEKTER SOM GIR VERDI FOR VIRKSOMHETEN. SINTEF HELGELAND OG ARCTIC

Detaljer

Tor Haakon Bakken. SINTEF Energi og NTNU

Tor Haakon Bakken. SINTEF Energi og NTNU Tor Haakon Bakken SINTEF Energi og NTNU Plan for lynforedrag Energi-indikatorer Vannforbruk Sammenligning stort, smått og vind Multi-kriterieanalyse Sammenligning mellom prosjekter og teknologier Verktøy

Detaljer

Bærekraftig FM til tiden/ Bærekraftig FM på tid

Bærekraftig FM til tiden/ Bærekraftig FM på tid Downloaded from orbit.dtu.dk on: Sep 28, 2019 Bærekraftig FM til tiden/ Bærekraftig FM på tid Nielsen, Susanne Balslev Publication date: 2015 Document Version Peer reviewed version Link back to DTU Orbit

Detaljer

Effektstudien Oppfølging i 2009? Kort presentasjon (1) DØ,

Effektstudien Oppfølging i 2009? Kort presentasjon (1) DØ, Effektstudien 1990-94 Oppfølging i 2009? Kort presentasjon (1) DØ, 2008-10-14 Mål: Effektstudien ble gjennomført for å bestemme virkningen av utslipp på omgivelsene rundt smelteverkene i Norge. Hovedmål

Detaljer

Kjønnsperspektiv I MNT utdanning og forskning

Kjønnsperspektiv I MNT utdanning og forskning Kjønnsperspektiv I MNT utdanning og forskning Lise Christensen, Nasjonalt råd for teknologisk utdanning og Det nasjonale fakultetsmøtet for realfag, Tromsø 13.11.2015 Det som er velkjent, er at IKT-fagevalueringa

Detaljer

Hva slags AAR-krav i framtida? Begrunnelse for Felt/Lab Performance. COIN fagdag 20. mai 2008 Terje F. Rønning, Norcem AS

Hva slags AAR-krav i framtida? Begrunnelse for Felt/Lab Performance. COIN fagdag 20. mai 2008 Terje F. Rønning, Norcem AS Hva slags AAR-krav i framtida? Begrunnelse for Felt/Lab Performance COIN fagdag 20. mai 2008 Terje F. Rønning, Norcem AS Rilem forslag til CEN Level of Precaution P2: A normal level of precaution against

Detaljer

Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives

Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives Norsk mal: Startside Baltic Sea Region CCS Forum. Nordic energy cooperation perspectives Johan Vetlesen. Senior Energy Committe of the Nordic Council of Ministers 22-23. april 2015 Nordic Council of Ministers.

Detaljer

Kurskategori 2: Læring og undervisning i et IKT-miljø. vår

Kurskategori 2: Læring og undervisning i et IKT-miljø. vår Kurskategori 2: Læring og undervisning i et IKT-miljø vår Kurs i denne kategorien skal gi pedagogisk og didaktisk kompetanse for å arbeide kritisk og konstruktivt med IKT-baserte, spesielt nettbaserte,

Detaljer

The TrAM-project Transport Advanced & Modular

The TrAM-project Transport Advanced & Modular The TrAM-project Transport Advanced & Modular WORK PROGRAMME 2016 2017 11. Smart, green and integrated transport: MG-2.4-2017. Complex and value-added specialised vessels MG-2.4-2017. Complex and value-added

Detaljer

FM kompetanseutvikling i Statoil

FM kompetanseutvikling i Statoil FM kompetanseutvikling i Statoil Erick Beltran Business developer Statoil FM FM konferansen Oslo, 13 Oktober 2011 Classification: Internal (Restricted Distribution) 2010-06-06 Erick Beltran Ingenierio

Detaljer

Project manager of the MSG6-model (Leading computable general equilibrium model of the Norwegian economy).

Project manager of the MSG6-model (Leading computable general equilibrium model of the Norwegian economy). Curriculum vitae Geir H M Bjertnæs Statistics Norway Akersveien 26 0177 Oslo Pb. 8131 Dep. 0033 Oslo Telephone: 40902511 Telephone, private: 92049443 e-mail: ghb@ssb.no Date of birth: 28. Aug 1971 Nationality:

Detaljer

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser. TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene

Detaljer

Multimedia in Teacher Training (and Education)

Multimedia in Teacher Training (and Education) Multimedia in Teacher Training (and Education) Bodo Eckert, Stefan Altherr, Hans-Jörg Jodl Second International GIREP Seminar 1-6 September 2003 University of Udine, Italy Content Training courses for

Detaljer

Norsk Olje og Gass arbeidsseminar

Norsk Olje og Gass arbeidsseminar Norsk Olje og Gass arbeidsseminar Filosofi desgn/bygging/installasjon, spesielle krav til løsninger - Goliat www.eninorge.com Innholdet i presentasjonen Data- og erfaringsinnhenting Vinteriseringsløsninger

Detaljer

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions

Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Requirements regarding Safety, Health and the Working Environment (SHWE), and pay and working conditions Vigdis Bjørlo 2016-02-05 Suppliers' obligations in relation to the Construction Client Regulations

Detaljer

SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE

SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE SYNERGIES BETWEEN MEASURES FOR ADAPTATION, EMISSIONS TO AIR AND WATER QUALITY IN AGRICULTURE Marianne Bechmann and Lillian Øygarden NIBIO Trondheim, EVALUATION OF SYNERGIES AND CONFLICTS Environmental

Detaljer

Exploration Challenges forward. Sissel H Eriksen Director Exploration

Exploration Challenges forward. Sissel H Eriksen Director Exploration Exploration Challenges forward Sissel H Eriksen Director Exploration Exploration challenges Exploration history Acreage - awards and opening of new areas Seismic acquisition and coexistence 09.03. 2 Area

Detaljer

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser. TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene

Detaljer

Fjerning av offshore-konstruksjoner - Hva kan vi lære (JIP)? Anette Pedersen, Ingar Scherf, Gudfinnur Sigurdsson

Fjerning av offshore-konstruksjoner - Hva kan vi lære (JIP)? Anette Pedersen, Ingar Scherf, Gudfinnur Sigurdsson Fjerning av offshore-konstruksjoner - Hva kan vi lære (JIP)? Anette Pedersen, Ingar Scherf, Gudfinnur Sigurdsson Background Several structures will be decommissioned in the coming years and other structures

Detaljer

Ole Isak Eira Masters student Arctic agriculture and environmental management. University of Tromsø Sami University College

Ole Isak Eira Masters student Arctic agriculture and environmental management. University of Tromsø Sami University College The behavior of the reindeer herd - the role of the males Ole Isak Eira Masters student Arctic agriculture and environmental management University of Tromsø Sami University College Masters student at Department

Detaljer

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6.

Administrasjon av postnummersystemet i Norge Post code administration in Norway. Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. Administrasjon av postnummersystemet i Norge Frode Wold, Norway Post Nordic Address Forum, Iceland 5-6. may 2015 Postnumrene i Norge ble opprettet 18.3.1968 The postal codes in Norway was established in

Detaljer

Virginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr.

Virginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr. A New Paradigm for Health Management of Bridges Presentation Overview Introduction AASHTO Grand Challenges SAFETEA-LU LTBP Is the Problem Unique? RCM A New Paradigm Design, Build, Maintain---Asset Management

Detaljer

The Proactima way PREPARED. Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap

The Proactima way PREPARED. Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap The Proactima way Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap Tekna Beredskapsdagene 2014 Espen Hoell og Jared Eckroth PREPARED. Proactima

Detaljer

Research on Low Carbon Emissions - Road Transport in Norway

Research on Low Carbon Emissions - Road Transport in Norway Research on Low Carbon Emissions - Road Transport in Norway, Berlin 14.03.2016 Gina Ytteborg, Head of R&D and Innovation NPRA GHG Emissions from transport 2014 Emissions to air (mill. tonnes Co 2 eqv.)

Detaljer

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser.

TUSEN TAKK! BUTIKKEN MIN! ...alt jeg ber om er.. Maren Finn dette og mer i. ... finn meg på nett! Grafiske lisenser. TUSEN TAKK! Det at du velger å bruke mitt materiell for å spare tid og ha det kjekt sammen med elevene betyr mye for meg! Min lidenskap er å hjelpe flotte lærere i en travel hverdag, og å motivere elevene

Detaljer

Barents 2020 Implementering av resultater fra prosjektet. Jan G. Eriksson Standard Norge

Barents 2020 Implementering av resultater fra prosjektet. Jan G. Eriksson Standard Norge Barents 2020 Implementering av resultater fra prosjektet Jan G. Eriksson Standard Norge Disposisjon Om prosjektet, bakgrunn og hensikt Hvordan det ble gjennomført Noen resultater Bruk av resultatene Barents

Detaljer

IEA PVPS. Trond Moengen. Global co-operation towards sustainable deployment of photovoltaic power systems

IEA PVPS. Trond Moengen. Global co-operation towards sustainable deployment of photovoltaic power systems IEA PVPS Global co-operation towards sustainable deployment of photovoltaic power systems Trond Moengen PVPS general presentation, date, place The IEA PVPS Mission To enhance the international collaboration

Detaljer

BioCarb+ NFR KPN prosjekt MNOK. Enabling the biocarbon value chain for energy

BioCarb+ NFR KPN prosjekt MNOK. Enabling the biocarbon value chain for energy Enabling the biocarbon value chain for energy BioCarb+ Dr. Ing. Øyvind Skreiberg Sjefforsker, SINTEF Energi AS BioCarb+ prosjektleder oyvind.skreiberg@sintef.no http://www.sintef.no/biocarb NFR KPN prosjekt

Detaljer

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau.

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau. CAMES Overskrift 27pt i to eller flere linjer Technical Skills Leizl Joy Nayahangan, RN, MHCM Leizl.joy.nayahangan@regionh.dk IMPORTANCE Challenges Brødtekst 22pt of patient skrives her care Increasing

Detaljer

Understanding Social and Environmental Conflicts in Mining Exploration Simexmin May 18, 2016 Alan Dabbs Social Capital Group. Tia Maria Conflict

Understanding Social and Environmental Conflicts in Mining Exploration Simexmin May 18, 2016 Alan Dabbs Social Capital Group. Tia Maria Conflict Understanding Social and Environmental Conflicts in Mining Exploration Simexmin May 18, 2016 Alan Dabbs Social Capital Group Tia Maria Conflict Agenda Perspective Drivers of social conflict Points of Interaction

Detaljer

WORLD CLASS INTEGRITY SOLUTIONS. Børge Gjeldvik Axess

WORLD CLASS INTEGRITY SOLUTIONS. Børge Gjeldvik Axess WORLD CLASS INTEGRITY SOLUTIONS Børge Gjeldvik Axess Slik ser vi ut i juli 2014 Employees: 357 Revenues: 100 mill USD 2014 Per June 2014: 30% of revenues and 40% of EBIT from international offices World

Detaljer

Windlass Control Panel

Windlass Control Panel SIDE-POWER 86-08955 Windlass Control Panel v1.0.2 Windlass Systems Installasjon manual SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 w w w. s i d e

Detaljer

KROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal.

KROPPEN LEDER STRØM. Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal. KROPPEN LEDER STRØM Sett en finger på hvert av kontaktpunktene på modellen. Da får du et lydsignal. Hva forteller dette signalet? Gå flere sammen. Ta hverandre i hendene, og la de to ytterste personene

Detaljer

Aldrende innretninger status fra prosjektarbeid

Aldrende innretninger status fra prosjektarbeid Aldrende innretninger status fra prosjektarbeid Gerhard Ersdal 13 juni 2008 Prosjektets formål Sikre at aktørene tar ansvar for sine aldrende innretninger. Sikre at industrien har utarbeidet gode standarder

Detaljer

Information search for the research protocol in IIC/IID

Information search for the research protocol in IIC/IID Information search for the research protocol in IIC/IID 1 Medical Library, 2013 Library services for students working with the research protocol and thesis (hovedoppgaven) Open library courses: http://www.ntnu.no/ub/fagside/medisin/medbiblkurs

Detaljer

EG-leder konferanse 2017

EG-leder konferanse 2017 09.11. 2017 EG-leder konferanse 2017 PER-ARNE RØSTADSAND, LEDER SEKTORSTYRET PETROLEUM I STANDARD NORGE Sektorstyret petroleum i Standard Norge -Leder -Nestleder 2 Standard Norge NORSOK OG INTERNASJONAL

Detaljer

Goliat - The Concept Solution

Goliat - The Concept Solution Goliat - The Concept Solution Odd Vårdal Deputy Development Project Manager Oslo - 4 th of June 2010 www.goliatinfo.com Main topics for presentation Arctic challenges Development concept Oil spill preparedness

Detaljer

ROS analyse for samfunnskritiske IKT systemer. Utfordringer og muligheter 24/11-05

ROS analyse for samfunnskritiske IKT systemer. Utfordringer og muligheter 24/11-05 ROS analyse for samfunnskritiske IKT systemer Utfordringer og muligheter 24/11-05 Hermann Steen Wiencke Proactima/Universitetet i Stavanger 1 Et samarbeid mellom Universitetet i Stavanger og Rogalandsforskning

Detaljer

EGR System Fouling Control

EGR System Fouling Control EGR System Fouling Control Dr. Gordon Bartley for Reggie Zhan, Scott Eakle, John Miller, Joseph Anthony Southwest Research Institute R Outline EGR System Fouling Control Introduction Objective Technical

Detaljer

E-Learning Design. Speaker Duy Hai Nguyen, HUE Online Lecture

E-Learning Design. Speaker Duy Hai Nguyen, HUE Online Lecture E-Learning Design Speaker Duy Hai Nguyen, HUE Online Lecture Design Educational Design Navigation Design Educational Design Some Important Considerations: 1. Authentic learning environment: For effective

Detaljer

The building blocks of a biogas strategy

The building blocks of a biogas strategy The building blocks of a biogas strategy Presentation of the report «Background report for a biogas strategy» («Underlagsmateriale til tverrsektoriell biogass-strategi») Christine Maass, Norwegian Environment

Detaljer

Oppdatert NORSOK N-005

Oppdatert NORSOK N-005 Oppdatert NORSOK N-005 Gerhard Ersdal Ptil Medvirkende Leder: Nils-Christian Hellevik, AkerSolutions Deltakere: Michael E Hall, ConnocoPhillips Tor Inge Fossan, Statoil Terje Nybø, Statoil Jørunn Osnes,

Detaljer

TUNNEL LIGHTING. LED Lighting Technology

TUNNEL LIGHTING. LED Lighting Technology TUNNEL LIGHTING TunLite Linear Designed LED Tunnel & Underpass Light The TunLite is an LED linear luminaire providing reliable solutions to cover the lighting requirements of tunnels and underpasses. It

Detaljer

Improving Customer Relationships

Improving Customer Relationships Plain Language Association International s 11 th conference Improving Customer Relationships September 21-23, 2017 University of Graz, Austria hosted by Klarsprache.at Copyright of this presentation belongs

Detaljer

IMO - POLARKODEN. hva, hvem, hvordan og når. v/ Kjersti Høgestøl, Norges Rederiforbund. HMS i Nord, arbeidsseminar 6 16-17 Juni 2014

IMO - POLARKODEN. hva, hvem, hvordan og når. v/ Kjersti Høgestøl, Norges Rederiforbund. HMS i Nord, arbeidsseminar 6 16-17 Juni 2014 IMO - POLARKODEN hva, hvem, hvordan og når v/ Kjersti Høgestøl, Norges Rederiforbund HMS i Nord, arbeidsseminar 6 16-17 Juni 2014 KLIMAENDRINGENE; EN TRUSSEL OG EN MULIGHET Isen trekker seg tilbake, nytt

Detaljer

Aldring av konstruksjoner og betydning av robusthet

Aldring av konstruksjoner og betydning av robusthet Aldring av konstruksjoner og betydning av robusthet Egentlig robusthet og hva betyr det ifm aldring Gerhard Ersdal Principal Engineer, Petroleum Safety Authority Norway Robusthet i Ptil regelverket Innretninger

Detaljer

PIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER

PIM ProsjektInformasjonsManual Tittel: REDUKSJON AV FLUORIDEKSPONERING I ALUMINIUMINDUSTRIEN INKLUDERT GRUNNLAG FOR KORTTIDSNORM FOR FLUORIDER SLUTTRAPPORT Innhold 1. Innledning 1.1 Deltakere 1.2 Bakgrunn 1.3 Mål 1.4 Organisasjon 2. Oppsummering 3. Summary in English 4. Referanser/References 1. INNLEDNING 1.1 Deltakere Alcan á Ísland Alcoa Fjarðaál

Detaljer

FM kompetanseutvikling i Statoil

FM kompetanseutvikling i Statoil FM kompetanseutvikling i Statoil Erick Beltran Business developer Statoil FM Kompetanse for bedre eiendomsforvaltning Trondheim, 6 Januar 2010 Classification: Internal (Restricted Distribution) 2010-06-06

Detaljer

Tripartite. The regulations also create a general duty for employees to help shape, implement and follow up systematic HSE efforts in the industry.

Tripartite. The regulations also create a general duty for employees to help shape, implement and follow up systematic HSE efforts in the industry. Tripartite Collaboration between employers, unions and government is not only enshrined in Norwegian petroleum policy, but also essential for progress on HSE. That puts Norway in a unique position. Trepartssamarbeid

Detaljer

HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment)

HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment) HMS ved montering, vedlikehold og bruk av hydrauliske anlegg (HSE at Installation, Maintenance and Use of Hydraulic Equipment) Revision: A3 Page: 2 of 5 ADVARSEL! Operatøren må lese og forstå HMS kapittelet

Detaljer

Hvordan komme i kontakt med de store

Hvordan komme i kontakt med de store Hvordan komme i kontakt med de store Willy Holdahl, direktør Personal og Organisasjonsutvikling Kongstanken, 15 oktober 2010 The information contained in this document is Volvo Aero Connecticut Proprietary

Detaljer

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019

Vekstkonferansen: Vekst gjennom verdibaserte investeringer. Thina Margrethe Saltvedt, 09 April 2019 Vekstkonferansen: Vekst gjennom verdibaserte investeringer Thina Margrethe Saltvedt, 09 April 2019 Finanssektoren har en sentral rolle i samfunnet ved at den skal finansiere økonomiske aktiviteter for

Detaljer

Arctic projects: Risks and implications Norwegian perspective

Arctic projects: Risks and implications Norwegian perspective Arctic projects: Risks and implications Norwegian perspective Sigurd Enge Bellona Foundation Kirkenes, 24. October 2012 Journalist-seminar «Shtokman and other oil and gas projects on the Arctic shelf»

Detaljer

Smart High-Side Power Switch BTS730

Smart High-Side Power Switch BTS730 PG-DSO20 RoHS compliant (green product) AEC qualified 1 Ω Ω µ Data Sheet 1 V1.0, 2007-12-17 Data Sheet 2 V1.0, 2007-12-17 Ω µ µ Data Sheet 3 V1.0, 2007-12-17 µ µ Data Sheet 4 V1.0, 2007-12-17 Data Sheet

Detaljer

Clean North Sea Shipping

Clean North Sea Shipping Clean North Sea Shipping An Interreg IVB, North Sea Region Programme project Luftutslipp i havn Klimarådet fredag 8. juni 2012 Competitive Marine Transport Services and reduction of Emissions - A North

Detaljer

Marin Prosjektering. IMT linjevalg 2012

Marin Prosjektering. IMT linjevalg 2012 1 Marin Prosjektering IMT linjevalg 2012 2 Marin prosjektering er å; Skape morgendagens marine systemer, og Forbedre dagens marine systemer. 3 Sentrale ferdigheter Analysere 4 Prosjektere marine systemer

Detaljer

COUNTRY REPORT- NORWAY

COUNTRY REPORT- NORWAY COUNTRY REPORT- NORWAY EUFRIN BOARD - NOV. 2015 Mekjell Meland Nibio Ullensvang JULY 1, 2015 2 23.11.2015 NIBIO KNOWLEDGE FOR LIFE Our future well-being depends on sustainable use of our natural resources.

Detaljer

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules

Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Safering / Safeplus Retrofit of Ronis key for disconnector Interlock type EL11AP V and Sv modules Installation instructions www.abb.com Document status Responsible RELEASED NODIS Location Date Name Prepared

Detaljer

Kartleggingsskjema / Survey

Kartleggingsskjema / Survey Kartleggingsskjema / Survey 1. Informasjon om opphold i Norge / Information on resident permit in Norway Hvilken oppholdstillatelse har du i Norge? / What residence permit do you have in Norway? YES No

Detaljer

Capturing the value of new technology How technology Qualification supports innovation

Capturing the value of new technology How technology Qualification supports innovation Capturing the value of new technology How technology Qualification supports innovation Avanserte Marine Operasjoner - Fra operasjon til skip og utstyr Dag McGeorge Ålesund, 1 Contents Introduction - Cheaper,

Detaljer

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016,

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, OIL & GAS A NEW REALITY DNV GL Industry Outlook for 2016 Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, 1 2013 SAFER, SMARTER, GREENER 3 februar 2016

Detaljer

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION 2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm

Detaljer

European Crime Prevention Network (EUCPN)

European Crime Prevention Network (EUCPN) European Crime Prevention Network (EUCPN) The EUCPN was set up by Council Decision 2001/427/JHA in May 2001 to promote crime prevention activity in EU Member States. Its principal activity is information

Detaljer

Status Aker Verdal Mai 2010

Status Aker Verdal Mai 2010 part of Aker Status Aker Verdal Mai 2010 Verdal Formannskap 6. mai 2010 Nina Udnes Tronstad President, Aker Solutions, Verdal 2010 Aker Solutions Financials AKSO total - Q1/2010 ED&S Subsea P&T P&C Revenue

Detaljer

A-LEX Prosjektet Drivende Skip i Barentshavet

A-LEX Prosjektet Drivende Skip i Barentshavet A-LEX Prosjektet Drivende Skip i Barentshavet Arbeidsmøte Nødslep i Nordområdene, 25. november 2015 Ørjan Selvik Norsk Marinteknisk Forskningsinstitutt Oversikt presentasjon A-LEX prosjektbeskrivelse A-LEX

Detaljer

Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer

Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer Bruk av ALARP analyse for beslutningstaking på behovet for sikkerhetssystemer / barrierer Morten Sørum, Senior Advisor Safety, Statoil Classification: Internal 2014-11-16 ALARP prinsippet ALARP (As Low

Detaljer

Workshop 2 - Endringer i regelverket for droner - Hva? Når? Hvordan?

Workshop 2 - Endringer i regelverket for droner - Hva? Når? Hvordan? Workshop 2 - Endringer i regelverket for droner - Hva? Når? Hvordan? Tom Egil Herredsvela, LT Bente Heggedal, LT Anders Martinsen, UAS Norway Regelverket for droner - Hva? - Når? - Felleseuropeiske regler

Detaljer

E-navigasjon 12-13 Juni 2014

E-navigasjon 12-13 Juni 2014 E-navigasjon 12-13 Juni 2014 SIKKER NAVIGERING Classification: Internal 2014-06-11 E-NAVIGASJON Introduksjon, Tor Arne Tønnessen Statoil hvem er vi E-navigasjon, hvorfor er det viktig for Statoil ECDIS,

Detaljer

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET.

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INGVE SØRFONN 1 THE FUTURE IS NOW! 2 FROM PRODUCT TO ECOSYSTEM 3 READY

Detaljer

Bedriftenes møteplass. Thina Margrethe Saltvedt, 02 April 2019

Bedriftenes møteplass. Thina Margrethe Saltvedt, 02 April 2019 Bedriftenes møteplass Thina Margrethe Saltvedt, 02 April 2019 2 Investorer avskyr klimarisiko 3 NORDEA ENABLES TRANSITION TOWARDS A SUSTAINABLE FUTURE Kilde: Dagens Næringsliv, Financial Times, The Guardian

Detaljer

Utvikling av voksnes ferdigheter for optimal realisering av arbeidskraft (SkillsREAL)

Utvikling av voksnes ferdigheter for optimal realisering av arbeidskraft (SkillsREAL) Utvikling av voksnes ferdigheter for optimal realisering av arbeidskraft (SkillsREAL) Utvikling av voksnes ferdigheter for optimal realisering av arbeidskraft Tarja Tikkanen Hva betyr PIAAC-resultatene

Detaljer

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 «Den nye læreboka for FM» Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 Kvalitetsverktøy i utvikling og forandring Krav - kapittel 4 til

Detaljer

6 December 2011 DG CLIMA. Stakeholder meeting on LDV CO 2 emissions - Scene setter

6 December 2011 DG CLIMA. Stakeholder meeting on LDV CO 2 emissions - Scene setter 6 December 2011 DG CLIMA 1 Stakeholder meeting on LDV CO 2 emissions - Scene setter Context of 80-95% reduction 2 Keeping average global temperature increase below 2 C confirmed as global objective (UNFCCC-

Detaljer

Integrating Evidence into Nursing Practice Using a Standard Nursing Terminology

Integrating Evidence into Nursing Practice Using a Standard Nursing Terminology Integrating Evidence into Nursing Practice Using a Standard Nursing Terminology Kathryn Mølstad, RN, Norwegian Nurses Organisation Kay Jansen, MSN, PMHCNS-BC, DNPc, University of Wisconsin- Milwaukee,

Detaljer

LECO Energibruk i fem kontorbygg i Norge

LECO Energibruk i fem kontorbygg i Norge LECO sluttkonferanse Oslo, 4.11.2011 LECO Energibruk i fem kontorbygg i Norge CATHERINE GRINI, HANS-MARTIN MATHISEN, IGOR SARTORI, MATTHIAS HAASE, HELLE WØHLK JÆGER SØRENSEN, ARNKELL PETERSEN, IDA BRYN

Detaljer

Kjell Arne Mork, Francisco Rey, Henrik Søiland

Kjell Arne Mork, Francisco Rey, Henrik Søiland Argo data in the Norwegian Sea Kjell Arne Mork, Francisco Rey, Henrik Søiland Institute of Marine Research, Norway Euro-Argo User Workshop, Paris June 21 Outline Institute Marine Research s monitoring

Detaljer

Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode

Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode Bedriftenes Møteplass 2016 Nytt strømforbruk. Fra strøm til hydrogen, en ny lagringsmetode Magnus Thomassen, SINTEF Materialer og Kjemi Technology for a better society 1 Oversikt Hvorfor hydrogen Litt

Detaljer

Grønne obligasjoner- Et verktøy for klimafinansiering og miljømessig integritet. Klimamarin 2017, 7. desember 2017 Alexander Berg CICERO klimafinans

Grønne obligasjoner- Et verktøy for klimafinansiering og miljømessig integritet. Klimamarin 2017, 7. desember 2017 Alexander Berg CICERO klimafinans Grønne obligasjoner- Et verktøy for klimafinansiering og miljømessig integritet Klimamarin 2017, 7. desember 2017 Alexander Berg CICERO klimafinans We deliver new insight that help solve the climate challenge

Detaljer

Midler til innovativ utdanning

Midler til innovativ utdanning Midler til innovativ utdanning Hva ser jeg etter når jeg vurderer et prosjekt? Utdanningsseminar Onsdag 10 Januari 2018 Reidar Lyng Førsteamanuensis Institutt for pedagogikk og livslang læring, NTNU/ Leder

Detaljer

Safety a t t h e f A c t o r y

Safety a t t h e f A c t o r y Safety a t t h e f A c t o r y Sikkerhet på fabrikken Safety at the factory NÅ har du god tid til å lese denne brosjyren! I en krisesituasjon har du ikke like god tid You have plenty of time to read this

Detaljer

NO X -chemistry modeling for coal/biomass CFD

NO X -chemistry modeling for coal/biomass CFD NO X -chemistry modeling for coal/biomass CFD Jesper Møller Pedersen 1, Larry Baxter 2, Søren Knudsen Kær 3, Peter Glarborg 4, Søren Lovmand Hvid 1 1 DONG Energy, Denmark 2 BYU, USA 3 AAU, Denmark 4 DTU,

Detaljer

Hovedoppgave. ved IMM. våren Prosjektoppgave ved IPM. Vår 2011

Hovedoppgave. ved IMM. våren Prosjektoppgave ved IPM. Vår 2011 Hovedoppgave ved IMM Vår 2011 Modellering og testing av fotprotese av Signe S. Stølen og Cecilie J. L. Kjellevold Sofia Hussain (PhD) arbeider med å utvikle en ny fotprotese for barn i u- land, noe som

Detaljer

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward

C13 Kokstad. Svar på spørsmål til kvalifikasjonsfasen. Answers to question in the pre-qualification phase For English: See page 4 and forward C13 Kokstad Svar på spørsmål til kvalifikasjonsfasen Answers to question in the pre-qualification phase For English: See page 4 and forward Norsk Innhold 1. Innledning... 2 2. Spørsmål mottatt per 28.11.12...

Detaljer

Symphonic Suite From. Preview Only. Featuring STAR WARS (Main Title), REVENGE OF THE SITH A NEW HOPE and BATTLE OF THE HEROES

Symphonic Suite From. Preview Only. Featuring STAR WARS (Main Title), REVENGE OF THE SITH A NEW HOPE and BATTLE OF THE HEROES SYMPHONIC BAND Grade 4 Symphonic Suite From 1 Conductor 1 Piccolo 3 1st Flute 3 2nd Flute 2 Oboe 2 Bassoon 3 1st Bb Clarinet 3 2nd Bb Clarinet 3 3rd Bb Clarinet 2 Bb Bass Clarinet 1 Eb Contra Bass Clarinet

Detaljer