Review of the IO valuation cases on the NCS
|
|
- Therese Viken
- 8 år siden
- Visninger:
Transkript
1 Review of the IO valuation cases on the NCS Torsten H. Bertelsen Dr. lic. oec. NPD Arbeidsområder: Gassperspektivanalysen / Fusjon StatoilHydro / PÌAF / IO
2 Agenda NPD and E-Drift /Integrated Operations Integrating Integrated Operations into our Benchmarking Toolbox (PIAF) Challenges and Further improvement
3 NPD and Integrated Operations - Background Studies (OLF, Petoro and other) indicating a significant value added through IO 2 Measures: Carrying out Edriftsforum / Spreading information about IO Integrating IO in our organisation / annual benchmarking process
4 Integrating IO in Benchmarking Process IAF 2007 Performance Indicator Analysis for Fields
5 Data Sources Revised National Budget Quantitative data Annual Status Report Qualitative data Annual reporting of resources, production data and economic data Results Plans 2007, and long term ambitions The Status Report forms a basis for the authorities assessment of whether the field is operated in accordance with the preconditions in regulations, cf section 4-1 of the Petroleum Act. Results 2007, plans
6 Measures on prioritised fields A Measures at high level (MPE) Field report B Measures now NPD study C D Awaiting new measures No measures at present Follow-up Disseminate best practise
7 Main indicators and level 2 indicators RESOURCE GROWTH (RES) Reserve growth Projects Exploration ECONOMY (PLAN/AMB) Investments Operating costs Unit costs Lifetime IMPROVEMENTS (PLAN) Operations Capacity Tie-in Recovery strategy 100 % 75 % 50 % 25 % 0 % RECOVERY (RES) Production Injection Development wells IMPROVEMENTS (RES) Operations Capacity Tie-in Recovery strategy RECOVERY (PLAN) Production Injection Development wells RESOURCE GROWTH (PLAN) Reserve growth Projects Exploration Approx 100 indicators on level 3 ECONOMY (RES) Investments Operation costs Unit costs
8 IO and PIAF Describe planned implementation of integrated operations and state planned investments in integrated operations ECONOMY (PLAN/AMB) RESOURCE GROWTH (RES) 100 % 75 % 50 % RECOVERY (RES) Describe implementation of integrated operations and state investments made in integrated operations 25 % IMPROVEMENTS (PLAN) Drift 0 % IMPROVEMENTS (RES) Drift RECOVERY (PLAN) ECONOMY (RES) RESOURCE GROWTH (PLAN) Integrated operations are described by two indicators last year Consequences of e-operations will influence other indicators
9 IO and PIAF Results last year High level of activity observed/reported Inaccurate reporting Worst Score 40 Antall felt 30 As expected " Top Score 0 - IO Investments 2006 IO Investments Planned
10 Further Improvements Observations: A clear IO/Edrift/E-field. definition is still not in place. and will not occur Without definition measuring and analyzing is challenging: a) Level of IO b) Effects of IO or at least time-consuming With the PIAF-toolbox NPD has a full/good KPI coverage of all fields on the NCS in place Ambitions: Linking IO and PIAF Mapping IO status on all fields on the NCS in an time efficient way Analyzing correlation between IO-Status and KPI
11 IO PIAF Ongoing process Process Stripping IO into the key functionalities/capabilities Developing a questionnair Mapping IO status for all producing fields on the NCS Integrating in PIAF Field x has. (enablers) Field x can. (functions/capabilities) Field x is achieving. (KPI) = > Extracting IO related performance Side-effects => IO/Efield definition (?) Questioning exisisting /new functionalities (Innovations at the edge)
12 Ongoing process Key functionalities in key processes Reservoir Management Drilling and Well Production Optimalization Operations Maintenance and Modifications
13 Thank you!
14 E.g. Reservoir management Langsiktig utviklingsarbeid; Hvilke plandokumenter foreligger (reservoarstyringsplan, datainnsamlingsplan og/eller langtidsplan)? Hvor ofte oppdateres disse og hvem er involvert? Hvilken status har disse og hva brukes de til? Reservoarstyring; Hvordan og hvor ofte bidrar reservoarmiljøet i kortsiktig produksjons- og reservoarstyring? Hvilke arbeidsprosesser benyttes for å modne boremål, hvem er involvert? Datainnsamling; Verdisettes reservoardata på en realistisk måte og i hvilken sammenheng? Hvilke strategier og hovedtiltak benyttes for å bedre reservoarforståelsen? Hvor ofte gjøres ulike kampanjer? I hvilken grad benyttes smarte løsninger i brønner for datainnsamling/styring? Samhandlingsteknologi; Hvordan sikres tverrfaglig samhandling i arbeidsprosessene? Benyttes særskilt visualiseringsutstyr eller samhandlingsprosedyrer i tverrfaglig integrering Hvilke data kvalitetssikres i sanntid fra land?
15 BACK UP
16 Verdi- og ressurspotensialet Verdipotensialet Produksjonsøkning (økt nåverdi) - Samhandling sanntid, samhandlingsrom, simulering, styring og støtte Kostnadsreduksjoner - Reduserte driftskostnader offshore - Vedlikeholdssystemer, flytting av oppgaver på land, fjernstyring, mindre utreise - Reduserte B&B kostnader - Treffsikker boring, sanntidsoptimalisering, mindre offshoreutsendelser - Økte kostnader onshore Ressurspotensialet Økte reserver (i nær fremtid, med høy NV) - Brønnplassering, reservoarmonitoring og styring Økt utvinning (i nær fremtid, med høy NV) Økte reserver (i fremtiden, men med lav/ingen NV)
17 PIAF Indikatorforslag fra møteserie Innspill til indikatorer: Digital infrastruktur Datastandarder, informasjonssikkerhet, overføringsformater med mer Indikatorer og endringer i organisasjon og prosess Regularitet produksjonsoptimalisering Boreeffektivitet og akselerert produksjon Økt produksjon Måling av e-driftsinvesteringer HMS (slår ut på etablerte KPIer) Innsigelser/utfordringer: E-drift er det samme som effektiv drift (kan ikke isoleres og måles) Hvordan isolere e-driftseffekter (produksjon, reserverøkning, HMS.)? Hvordan isolere e-driftsinvesteringer? Repetitive målinger lar det seg gjøre?
Rapporterer norske selskaper integrert?
Advisory DnR Rapporterer norske selskaper integrert? Hvordan ligger norske selskaper an? Integrert rapportering er å synliggjøre bedre hvordan virksomheten skaper verdi 3 Norske selskaper har en lang vei
DetaljerPETROMAKS & Integrerte Operasjoner. Rådgiver Tor-Petter Johnsen, PETROMAKS
PETROMAKS & Integrerte Operasjoner Rådgiver Tor-Petter Johnsen, PETROMAKS Agenda for presentasjonen Porteføljen IO i PETROMAKS Prosjekter Aktører Penger Utfordringer Tematiske satsingsområder TTA1: Fremtidens
DetaljerSøknadsskjema Strategiske Partnerskap. Anne Kloster Holst Seniorrådgiver SIU Oslo
Søknadsskjema Strategiske Partnerskap Anne Kloster Holst Seniorrådgiver SIU Oslo 29. 1.2016 Hva skal beskrives i søknaden? A. General Information B. Context C. Priorities D. Participating Organisations
DetaljerClimate change and adaptation: Linking. stakeholder engagement- a case study from
Climate change and adaptation: Linking science and policy through active stakeholder engagement- a case study from two provinces in India 29 September, 2011 Seminar, Involvering ved miljøprosjekter Udaya
DetaljerOpportunities and challenges for the Norwegian Petroleum sector. ABB 08.03.07 Sveinung Sletten, vice president external affairs, Petoro
Opportunities and challenges for the Norwegian Petroleum sector ABB 08.03.07 Sveinung Sletten, vice president external affairs, Petoro Petoro Opportunities and challenges for the NCS Petoro s strategy
DetaljerThe building blocks of a biogas strategy
The building blocks of a biogas strategy Presentation of the report «Background report for a biogas strategy» («Underlagsmateriale til tverrsektoriell biogass-strategi») Christine Maass, Norwegian Environment
DetaljerTEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING
TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene
DetaljerWestern Alaska CDQ Program. State of Alaska Department of Community & Economic Development
Western Alaska State of Alaska Department of Community & Economic Development The CDQ program was formally approved in 1992 by the North Pacific Fishery Management Council and implemented by Governor
DetaljerTEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:
TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør
DetaljerHva er IO? Offshore logistikkonferanse 2011. Kristiansund. Bjørnar Aas Ph.D in logistics. Molde University College, 2011
Hva er IO? Offshore logistikkonferanse 2011 Kristiansund Bjørnar Aas Ph.D in logistics Molde University College, 2011 Historien bak IO Innhold Definisjonen av konseptet 2 Bakgrunn Vi må utvinne mer: Nye
DetaljerSIU Retningslinjer for VET mobilitet
SIU Retningslinjer for VET mobilitet Gardermoen, 16.09.2014 Oppstart- og erfaringsseminar Tore Kjærgård Carl Endre Espeland 2 Kort om Erasmus+ EUs utdanningsprogram for perioden 2014 2020 Budsjett: 14,7
DetaljerHvordan sikre god utvikling av nordlig Nordsjø? Line Geheb, Asset Manager, Petoro A/S
Hvordan sikre god utvikling av nordlig Nordsjø? Line Geheb, Asset Manager, Petoro A/S Innhold Litt om Petoro Petoros strategi Hovedutfordringene i modne felt Petoros portefølje i den nordlige Nordsjø Snorre
DetaljerVirginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr.
A New Paradigm for Health Management of Bridges Presentation Overview Introduction AASHTO Grand Challenges SAFETEA-LU LTBP Is the Problem Unique? RCM A New Paradigm Design, Build, Maintain---Asset Management
DetaljerUNIVERSITETET I OSLO ØKONOMISK INSTITUTT
1 UNIVERSITETET I OSLO ØKONOMISK INSTITUTT BOKMÅL Utsatt eksamen i: ECON2915 Vekst og næringsstruktur Eksamensdag: 07.12.2012 Tid for eksamen: kl. 09:00-12:00 Oppgavesettet er på 5 sider Tillatte hjelpemidler:
DetaljerEn praktisk anvendelse av ITIL rammeverket
NIRF 17. april 2012 En praktisk anvendelse av ITIL rammeverket Haakon Faanes, CIA,CISA, CISM Internrevisjonen NAV NAVs ITIL-tilnærming - SMILI NAV, 18.04.2012 Side 2 Styring av tjenestenivå Prosessen omfatter
DetaljerSoftware applications developed for the maritime service at the Danish Meteorological Institute
Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological
DetaljerTips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt. Wenche Koldingsnes
Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt Wenche Koldingsnes Skåring av sykdomsaktivitet og skade I oppfølging av pasienter med vaskulitt er vurdering og konklusjon vedr. sykdomsaktivitet
DetaljerErfaringer fra en Prosjektleder som fikk «overflow»
Erfaringer fra en Prosjektleder som fikk «overflow» Per Franzén, Project Manager August 30 th, 2017 ERFARINGER FRA EN PROSJEKTLEDER SOM FIKK «OVERFLOW» AV GDPR BEGREPER OG INSTRUKSER Purpose limitation
DetaljerWhat's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid
Pris kr. 490,- Påmelding til Tone på tj@kph.no Frist: 10. januar 2019 DET ER UTFORDRENDE Å FÅ AVGRENSET OG SATT MÅL FOR DIGITALISERINGSPROSJEKTER SOM GIR VERDI FOR VIRKSOMHETEN. SINTEF HELGELAND OG ARCTIC
Detaljer5 E Lesson: Solving Monohybrid Punnett Squares with Coding
5 E Lesson: Solving Monohybrid Punnett Squares with Coding Genetics Fill in the Brown colour Blank Options Hair texture A field of biology that studies heredity, or the passing of traits from parents to
DetaljerFAMILY MEMBERS EXPERIENCES WITH IN-HOSPITAL CARE AFTER SEVERE TRAUMATIC BRAIN INJURY
FAMILY MEMBERS EXPERIENCES WITH IN-HOSPITAL CARE AFTER SEVERE TRAUMATIC BRAIN INJURY Audny Anke and Unn Sollid Manskow Trondheim 4. Mai 2017 Unn Sollid Manskow, RN, MPH, PhD Audny Anke, MD, professor Department
DetaljerMidler til innovativ utdanning
Midler til innovativ utdanning Hva ser jeg etter når jeg vurderer et prosjekt? Utdanningsseminar Onsdag 10 Januari 2018 Reidar Lyng Førsteamanuensis Institutt for pedagogikk og livslang læring, NTNU/ Leder
DetaljerExercise 1: Phase Splitter DC Operation
Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your
DetaljerNotat. Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne. Dato:
Notat Emne: Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne Dato: 23.3.2011 Som en del av grunnlagsmaterialet for Midtveisevalueringen har brukerpartnere i de 14 sentrene som ble evaluert,
DetaljerAgenda Registration/Refreshments Sponsor Slot Mark Reeve, Chalcroft Construction
Sponsored by: Agenda 10.00 Registration/Refreshments 10.30 Sponsor Slot Mark Reeve, Chalcroft Construction 10.35 Host Slot, Stephenson Harwood 10.40 Economic Review James Walton, IGD 11.10 Brexit Adrian
DetaljerWORLD CLASS INTEGRITY SOLUTIONS. Børge Gjeldvik Axess
WORLD CLASS INTEGRITY SOLUTIONS Børge Gjeldvik Axess Slik ser vi ut i juli 2014 Employees: 357 Revenues: 100 mill USD 2014 Per June 2014: 30% of revenues and 40% of EBIT from international offices World
DetaljerRevision of hydropower licenses - prioritisation of rivers for environmental improvement Nordic WFD Conference Reykjavik 27.
Revision of hydropower licenses - prioritisation of rivers for environmental improvement Nordic WFD Conference Reykjavik 27. September 2012 Jan Sørensen, Senior Engineer (NVE) Revision of licenses 420
DetaljerSAMMENDRAG.
SAMMENDRAG Om undersøkelsen KS ønsker å bidra til økt kunnskap og bevissthet rundt kommunesektorens bruk av sosiale medier 1 gjennom en grundig kartlegging av dagens bruk og erfaringer, samt en vurdering
DetaljerEr IO målene nådd innen Drift og Vedlikehold? Ivar Sløveren, rådgiver teknologi
Er IO målene nådd innen Drift og Vedlikehold? Ivar Sløveren, rådgiver teknologi Petoro undersøkelse fra 2007 viser betydelig fremgang i operatørenes satsing på IO Business as Usual Value Delivery Building
DetaljerInternationalization in Praxis INTERPRAX
Internationalization in Praxis The way forward internationalization (vt) : to make international; also: to place under international control praxis (n) : action, practice: as exercise or practice of an
DetaljerUnit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3
Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL
DetaljerMØTEPROTOKOLL. Forfall: Navn Funksjon Representerer Håvard Olsen MEDL STU Tina Reppe MEDL STU. Andre: Navn Funksjon Representerer
MØTEPROTOKOLL Utvalg: Fakultetsstyret ved Fakultet for biovitenskap og akvakultur Møte nr: 03/12 Møtested: Møterom 3003, Hovedbygget Dato: 06.06.2012 Tidspunkt: 09:00 15:15 Til stede: Navn Funksjon Representerer
DetaljerInnovasjon og kommersialisering på IFE
Innovasjon og kommersialisering på IFE Østfold Nyskapingsnettverk, september 2014 Presentert av Terje Johnsen Avdelingssjef Programvareteknologi Institutt for energiteknikk IFEs Innovasjonsprosess Innovasjon
DetaljerPublic roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no
Public roadmap for information management, governance and exchange 2015-09-15 SINTEF david.norheim@brreg.no Skate Skate (governance and coordination of services in egovernment) is a strategic cooperation
DetaljerGOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS
GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS Projects: 1. Microbial Selective Plugging MSP (Sandstone - reservoirs) 2. Particle Fracture Blocking PFB (Karbonat - reservoirs) 3. Upscaling/Meso
DetaljerHONSEL process monitoring
6 DMSD has stood for process monitoring in fastening technology for more than 25 years. HONSEL re- rivet processing back in 990. DMSD 2G has been continuously improved and optimised since this time. All
DetaljerSUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP)
SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP) Subsea dag - Sogn og Fjordane - 15.09.2016 Jørn Loug Hansen Subsea Manager, Snorre Expansion Project 1 Classification: Open 4 august 2016 Statoil ASA Snorre-area
DetaljerHybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS)
Hybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS) Varighet: 5 Days Kurskode: M10996 Version: A Opplæringsmetoder: Virtuell opplæring Beskrivelse: This five-day course will provide
DetaljerErfaringer med smidige metoder på store prosjekter i Telenor. Kristoffer Kvam, Strategic Project Manager, Portfolio & Projects, Telenor Norway
Erfaringer med smidige metoder på store prosjekter i Telenor Kristoffer Kvam, Strategic Project Manager, Portfolio & Projects, Telenor Norway Smidig metodikk brukt riktig kan gi store effekter. Her >30%
DetaljerLang lønnsom levetid på norsk sokkel. ODV 2013, Bergen Grethe Moen, adm.dir. Petoro AS
Lang lønnsom levetid på norsk sokkel ODV 2013, Bergen Grethe Moen, adm.dir. Petoro AS Stor aktivitet NKS: Leting, utbygging, drift 2 Kilde: Oljedirektoratet Høy aktivitet et gode og en utfordring Ti prosent
DetaljerPETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016
1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER
DetaljerInfrastructure investments on NCS
Infrastructure investments on NCS Kurt Georgsen, CEO, Silex Gas Norway AS Oslo, 21 January 2014 Today s topics Gassled Role of infrastructure companies on the NCS Governance model Framework conditions
DetaljerHMS og IKT-sikkerhet i integrerte operasjoner
HMS og IKT-sikkerhet i integrerte operasjoner Uønskede hendelser, oppfølging mot indikatorer og planer videre Randi Røisli CISO (Statoil) Leder arbeidsgruppe informasjonssikkerhet (OLF IO) 2 Eller historien
Detaljer2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS
2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS SPECIAL SECTION TO IN BUSINESS LAS VEGAS 3A September 23, 2005 SEE, PAGE 8A Businesses seek flexibility. It helps them compete in a fast-paced,
DetaljerForecast Methodology September LightCounting Market Research Notes
Forecast Methodology September 2015 LightCounting Market Research Notes Vladimir Market Kozlov Forecast Methodology, September, September, 2015 2015 1 Summary In summary, the key assump=on of our forecast
DetaljerMarsh Loss and Tidal Habitat Degradation
Marsh Loss and Tidal Habitat Degradation Alternative 2: New Ocean Inlet Data: PWA Alternative 3: Highway 1 Sill Data: PWA Alternative 4: Parsons Slough Data: PWA Alternative 2 Detailed Cost Subtotal: $69,600,000
DetaljerCOUNTRY REPORT- NORWAY
COUNTRY REPORT- NORWAY EUFRIN BOARD - NOV. 2015 Mekjell Meland Nibio Ullensvang JULY 1, 2015 2 23.11.2015 NIBIO KNOWLEDGE FOR LIFE Our future well-being depends on sustainable use of our natural resources.
DetaljerModel Description. Portfolio Performance
Model Description Market timing results from 2000 to 2019 are based on our Market Allocation Algorithm holding the top two (2) ranked assets each month. Risk control is added to keep asset(s) in cash if
DetaljerIssues and challenges in compilation of activity accounts
1 Issues and challenges in compilation of activity accounts London Group on environmental accounting 21st meeting 2-4 November 2015 Statistics Netherlands The Hague Kristine E. Kolshus kre@ssb.no Statistics
DetaljerWÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET.
INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INGVE SØRFONN 1 THE FUTURE IS NOW! 2 FROM PRODUCT TO ECOSYSTEM 3 READY
DetaljerSarepta Energi AS Projects and Ambitions
Sarepta Energi AS Projects and Ambitions A major windpower region under developement Potential:1885MW installed capasity - 5205 TWh production Sarepta s vision The vision Is to generate values from Mid
DetaljerProgramseminar for Olje og Gass i Norges forskningsråd Integrert produksjonsstyring; utstyrsbehov og teknologiske nyvinninger
Integrert produksjonsstyring: Integrert styring fra reservoar til marked (E-Felt) - OG21 beskrivelse: Et viktig grunnlag for optimale beslutninger er å integrere dynamiske reservoar-, utstyr- og forretningsmodeller.
DetaljerBærekraftig FM til tiden/ Bærekraftig FM på tid
Downloaded from orbit.dtu.dk on: Sep 28, 2019 Bærekraftig FM til tiden/ Bærekraftig FM på tid Nielsen, Susanne Balslev Publication date: 2015 Document Version Peer reviewed version Link back to DTU Orbit
DetaljerISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning
ISO 41001:2018 «Den nye læreboka for FM» Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 Kvalitetsverktøy i utvikling og forandring Krav - kapittel 4 til
DetaljerRisikofokus - også på de områdene du er ekspert
Risikofokus - også på de områdene du er ekspert - hvordan kan dette se ut i praksis? - Ingen er for gammel til å begå nye dumheter Nytt i ISO 9001:2015 Vokabular Kontekst Dokumentasjonskrav Lederskap Stategi-politikk-mål
DetaljerIntegritetsstyring Et verktøy for økt ytelse
Integritetsstyring Et verktøy for økt ytelse Stig Brudeseth, MsC. Manager, Inspection Management Mye kontroll og lite ytelse? Vi utfører utstrakt kontroll av tilstand på utstyret vårt Kan vi få en merverdi
DetaljerAker Drilling ASA. Ordinær generalforsamling Oslo, 16. mars The preferred partner. part of the Aker group
Aker Drilling ASA Ordinær generalforsamling Oslo, 16. mars 2006 Dagsorden 1. Åpning og konstituering 2. Ordinære saker 2.1 Orientering om virksomheten 2.2 Godkjennelse av regnskap og årsberetning 2.3 Fastsettelse
DetaljerDen europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo,
Den europeiske byggenæringen blir digital hva skjer i Europa? Steen Sunesen Oslo, 30.04.2019 Agenda 1. 2. CEN-veileder til ISO 19650 del 1 og 2 3. EFCA Guide Oppdragsgivers krav til BIMleveranser og prosess.
DetaljerEMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post:
EMPIC MEDICAL Etterutdanningskurs flyleger 21. april 2017 Lars (Lasse) Holm Prosjektleder Telefon: +47 976 90 799 E-post: Lrh@caa.no it-vakt@caa.no Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50
DetaljerTor Haakon Bakken. SINTEF Energi og NTNU
Tor Haakon Bakken SINTEF Energi og NTNU Plan for lynforedrag Energi-indikatorer Vannforbruk Sammenligning stort, smått og vind Multi-kriterieanalyse Sammenligning mellom prosjekter og teknologier Verktøy
DetaljerGreen Corridors - EUs arbeid for bærekraftig godstransport
Green Corridors - EUs arbeid for bærekraftig godstransport Hva er det og hvilke muligheter og utfordringer gir det for Norge? Transport- og Logistikkdagen 2010 Bergen, 20. september 2010 Atle Minsaas,
DetaljerYork Central Hospital. Vascular Camp 2007
York Central Hospital Vascular Camp 2007 Our Hemodialysis Program Regional Dialysis Program 40 stations at YCH 25 stations main unit 15 stations in CCC unit 18 stations at Oak Ridges Satellite Unit Southlake/SLED
DetaljerImplementation of Integrated Operations in Hydro. SPE Bergen 18.04.07 2006-12-14
Implementation of Integrated Operations in Hydro SPE Bergen 18.04.07 20061214 Integrated Operations in Hydro focus and approach Dato: 20061214 Side: 2 IO is advanced technologies and increasing data volumes,
DetaljerKontinuerlig og effektiv boreoperasjon for flere selskaper
Kontinuerlig og effektiv boreoperasjon for flere selskaper Sjur Talstad, EVP Norge og Russland Kontinuerlig og effektiv boreoperasjon for flere selskaper Introduksjon AGR Riggmarkedet norsk sokkel Operatørmarkedet
DetaljerTEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING
E-postmaler til bruk ved utsendelse av fremdriftsrapportering ph.d.- kandidater og veiledere TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: Kjære
DetaljerUtvikling av skills for å møte fremtidens behov. Janicke Rasmussen, PhD Dean Master Tel
Utvikling av skills for å møte fremtidens behov Janicke Rasmussen, PhD Dean Master janicke.rasmussen@bi.no Tel 46410433 Skills project results Background for the project: A clear candidate profile is defined
DetaljerKlimatiltaket, Elkem Solar. Ressurseffektiv produksjon av solcellemetall ENOVA- støtte til økt ressursutnyttelse
Klimatiltaket, Elkem Solar Ressurseffektiv produksjon av solcellemetall ENOVA- støtte til økt ressursutnyttelse Hvorfor Solar? Per i dag er solenergi en av få løsninger som allerede fra nå kan betydelig
DetaljerExploration Challenges forward. Sissel H Eriksen Director Exploration
Exploration Challenges forward Sissel H Eriksen Director Exploration Exploration challenges Exploration history Acreage - awards and opening of new areas Seismic acquisition and coexistence 09.03. 2 Area
DetaljerStatoils erfaringer fra CO 2 -lagring
Statoils erfaringer fra CO 2 -lagring Presentert av Ola Eiken Tekna kursdager 7. januar 2011 Offshore Sleipner Onshore In Salah Sub-sea Snøhvit 1 - Classification: External 2011-01-07 Snøhvit Sleipner
DetaljerStatus Aker Verdal Mai 2010
part of Aker Status Aker Verdal Mai 2010 Verdal Formannskap 6. mai 2010 Nina Udnes Tronstad President, Aker Solutions, Verdal 2010 Aker Solutions Financials AKSO total - Q1/2010 ED&S Subsea P&T P&C Revenue
DetaljerThe North-South Corridor - showing progress
The North-South Corridor - showing progress Euro-Asian Transport Links Expert Group meeting Tashkent, Uzbekistan November 1-3.2010 Stig Nerdal, Senior Adviser, UIC The initial founders of The International
DetaljerLEAN PLANNING I PROSJEKTBASERT INDUSTRI. NIMA SCM Gabriele Hofinger Jünge
LEAN PLANNING I PROSJEKTBASERT INDUSTRI NIMA SCM Gabriele Hofinger Jünge 26.11.2015 I LØPET AV DE NESTE 20 MINUTTENE SKAL JEG FORTELLE OM Livet som forsker Forskningsprosjektet VALUE TANK LEAN planning
Detaljer- En essensiell katalysator i næringsklyngene? Forskningsrådets miniseminar 12. april Mer bioteknologi i næringslivet hvordan?
Instituttsektoren - En essensiell katalysator i næringsklyngene? Forskningsrådets miniseminar 12. april 2011 Mer bioteknologi i næringslivet hvordan? Torstein Haarberg Konserndirektør SINTEF Materialer
DetaljerEr du nysgjerrig på om det er mulig...
BIMMER: Hvorfor ta steget over til Novapoint DCM og Quadri DCM? SOLVEIG FISKAA OG HEIDI BERG, VIANOVA SYSTEMS Er du nysgjerrig på om det er mulig......å dele alle infrastruktur data i en intelligent modell,
DetaljerA NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016,
OIL & GAS A NEW REALITY DNV GL Industry Outlook for 2016 Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, 1 2013 SAFER, SMARTER, GREENER 3 februar 2016
DetaljerCAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau.
CAMES Overskrift 27pt i to eller flere linjer Technical Skills Leizl Joy Nayahangan, RN, MHCM Leizl.joy.nayahangan@regionh.dk IMPORTANCE Challenges Brødtekst 22pt of patient skrives her care Increasing
DetaljerVedlikeholdsstyring og IO i Valhall REDevelopment. Steinar Bjugn BPN
Vedlikeholdsstyring og IO i Valhall REDevelopment Steinar Bjugn BPN Valhall Re-Development Prosjekt bakgrunn 5,8m innsynkning siden 1982 (per August 2007) Design Life 25 yrs. (1982-2007) 2 Valhall Re-Development
DetaljerNettverkene for kommunal og regional planlegging 12. nov Øyvind Aarvig Miljøverndepartementet
Nettverkene for kommunal og regional planlegging 12. nov 2010 Øyvind Aarvig Miljøverndepartementet Framtidens byer 2008-2014 Hovedmål er å redusere samlet klimagassutslipp fra vegtransport, energibruk
DetaljerOrganizational Project Management Maturity Model (OPM3)
Organizational Project Management Maturity Model (OPM3) Håvard O. Skaldebø, PMP, CCE, (haa-skal@online.no) Styreleder, PMI Norway Oslo Chapter (www.pmi-no.org) Prosjekt 2005, 12.oktober 2005, Hotel Rainbow,
DetaljerSFI-Norman presents Lean Product Development (LPD) adapted to Norwegian companies in a model consisting of six main components.
Hovedoppgave Masteroppgave ved ved IMM Høsten 2013 Lean Product Development Stability Drivers. Identifying Environmental Factors that Affect Performance. SFI-Norman presents Lean Product Development (LPD)
DetaljerInteraction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction
Interaction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction Ass Professor Lars Erik Kjekshus and Post doc Trond Tjerbo Department of Health Management and Health Economics
DetaljerHans Tømmervik, NINA Nikolai K. Winge, NMBU Inge E. Danielsen, Gåebrien Sijte, Røros
Project information Project title Environmental Impact Analyses (EIA) for reindeer herding. An evaluation. Year 2013-2016 Project leader Jan Åge Riseth Participants Hans Tømmervik, NINA Nikolai K. Winge,
DetaljerImplementeringen av ROP retningslinjen; er GAP analyser et
Implementeringen av ROP retningslinjen; er GAP analyser et effek/vt redskap? Lars Lien, leder Nasjonal kompetansetjeneste for sam
DetaljerProsjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities
Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Nordisk Adressemøte / Nordic Address Forum, Stockholm 9-10 May 2017 Elin Strandheim,
DetaljerUniversitet på dypt vann?
Universitet på dypt vann? Professor Arnfinn Nergaard Masterstudiet i Offshoreteknologi Institutt for Konstruksjonsteknikk og Materialteknologi Marin- og undervannsteknikk Universitetet i Stavanger UiS
DetaljerThe Research Council of Norway, grants and levels of research
1 The Research Council of Norway, grants and levels of research Thomas Stang - Special adviser Department for Regional Innovation and Development, The Research Council of Norway Eye Care for the Future
DetaljerCONCURRENT DESIGN Effek0v prosjektering basert på BIM BUILDING SMART NORGE
CONCURRENT DESIGN Effek0v prosjektering basert på BIM BUILDING SMART NORGE - 25.11.15 Agenda: Kort om Epsis Concurrent Design hva er det og hvor kommer det fra? Prosjekteksempler Sesjonsplanlgging, roller
DetaljerKommentar til endringer
VEDLEGG 3 Oversikt over forskjellene mellom standard samarbeidsavtale og forslag til standard unitavtale: Tekst som står i [klamme] er ment å skulle være valgfri. Artikkel i forslag til unitavtale Nye
DetaljerSubsea-Muligheter for virksomhet i den maritime klyngen. Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø
Subsea-Muligheter for virksomhet i den maritime klyngen Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø Utbygging og vedlikehold av subsea anlegg Hensikt: Gi et lite innblikk
DetaljerGjenopprettingsplan DNBs erfaringer. Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017
Gjenopprettingsplan DNBs erfaringer Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017 Lik konkurranse krever full harmonisering av systemet Like definisjoner Konsistent bruk
DetaljerINSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011)
INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) 1 Oppgaver Valgkomiteens oppgaver er å avgi innstilling til - generalforsamlingen
DetaljerTriCOM XL / L. Energy. Endurance. Performance.
TriCOM XL / L Energy. Endurance. Performance. L and XL - the new generation Sample charging station with chargers TriCOM L / XL Innovative charging technology The new TriCOM L - XL chargers are controlled
DetaljerTOTAL - VEKST I VEST. 13. november 2014 DM
TOTAL - VEKST I VEST 13. november 2014 DM1030943 AGENDA TOTAL s portefølje Status aktiviteter Garantiana og Tannat Erfaringer med Saga Fjordbase A competitive position in Norway TOTAL E&P NORGE AS 2013
DetaljerOrganisering og prosess for innovasjon og designstyring. Motsetning eller nødvendighet?
Organisering og prosess for innovasjon og designstyring. Motsetning eller nødvendighet? Hilde Britt S.Mellbye Konserndirektør HÅG Noen innledende spørsmål: Kan man analysere deg frem til banebrytende ideer?
DetaljerThe CRM Accelerator. USUS February 2017
The CRM Accelerator USUS February 2017 The CRM Accelerator n To start conversations about CRM n To stimulate experiments with aspects of CRM n To share ideas n To learn and pass on experiences and knowledge
DetaljerROS analyse for samfunnskritiske IKT systemer. Utfordringer og muligheter 24/11-05
ROS analyse for samfunnskritiske IKT systemer Utfordringer og muligheter 24/11-05 Hermann Steen Wiencke Proactima/Universitetet i Stavanger 1 Et samarbeid mellom Universitetet i Stavanger og Rogalandsforskning
DetaljerAndrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen
Andrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen The Process Goal Definition Data Collection Data Preprocessing EDA Choice of Variables Choice of Method(s) Performance Evaluation
DetaljerREMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION
2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm
DetaljerStrategi med kunden i fokus
Strategi med kunden i fokus 4. November 2016 Trond Winther, Head of Department SAFER, SMARTER, GREENER Innhold 1 Bakgrunn og utfordring 2 Strategi 3 Læringer 2 Our vision: global impact for a safe and
DetaljerUke 5. Magnus Li INF /
Uke 5 Magnus Li magl@ifi.uio.no INF3290 26/27.09.2017 Repetisjon av begreper Diskusjonsoppgaver I første innlevering ønsker vi et brukerperspektiv i et informasjonssystem - Hva kan inngå i et slikt informasjonssystem?
Detaljer