Review of the IO valuation cases on the NCS

Størrelse: px
Begynne med side:

Download "Review of the IO valuation cases on the NCS"

Transkript

1 Review of the IO valuation cases on the NCS Torsten H. Bertelsen Dr. lic. oec. NPD Arbeidsområder: Gassperspektivanalysen / Fusjon StatoilHydro / PÌAF / IO

2 Agenda NPD and E-Drift /Integrated Operations Integrating Integrated Operations into our Benchmarking Toolbox (PIAF) Challenges and Further improvement

3 NPD and Integrated Operations - Background Studies (OLF, Petoro and other) indicating a significant value added through IO 2 Measures: Carrying out Edriftsforum / Spreading information about IO Integrating IO in our organisation / annual benchmarking process

4 Integrating IO in Benchmarking Process IAF 2007 Performance Indicator Analysis for Fields

5 Data Sources Revised National Budget Quantitative data Annual Status Report Qualitative data Annual reporting of resources, production data and economic data Results Plans 2007, and long term ambitions The Status Report forms a basis for the authorities assessment of whether the field is operated in accordance with the preconditions in regulations, cf section 4-1 of the Petroleum Act. Results 2007, plans

6 Measures on prioritised fields A Measures at high level (MPE) Field report B Measures now NPD study C D Awaiting new measures No measures at present Follow-up Disseminate best practise

7 Main indicators and level 2 indicators RESOURCE GROWTH (RES) Reserve growth Projects Exploration ECONOMY (PLAN/AMB) Investments Operating costs Unit costs Lifetime IMPROVEMENTS (PLAN) Operations Capacity Tie-in Recovery strategy 100 % 75 % 50 % 25 % 0 % RECOVERY (RES) Production Injection Development wells IMPROVEMENTS (RES) Operations Capacity Tie-in Recovery strategy RECOVERY (PLAN) Production Injection Development wells RESOURCE GROWTH (PLAN) Reserve growth Projects Exploration Approx 100 indicators on level 3 ECONOMY (RES) Investments Operation costs Unit costs

8 IO and PIAF Describe planned implementation of integrated operations and state planned investments in integrated operations ECONOMY (PLAN/AMB) RESOURCE GROWTH (RES) 100 % 75 % 50 % RECOVERY (RES) Describe implementation of integrated operations and state investments made in integrated operations 25 % IMPROVEMENTS (PLAN) Drift 0 % IMPROVEMENTS (RES) Drift RECOVERY (PLAN) ECONOMY (RES) RESOURCE GROWTH (PLAN) Integrated operations are described by two indicators last year Consequences of e-operations will influence other indicators

9 IO and PIAF Results last year High level of activity observed/reported Inaccurate reporting Worst Score 40 Antall felt 30 As expected " Top Score 0 - IO Investments 2006 IO Investments Planned

10 Further Improvements Observations: A clear IO/Edrift/E-field. definition is still not in place. and will not occur Without definition measuring and analyzing is challenging: a) Level of IO b) Effects of IO or at least time-consuming With the PIAF-toolbox NPD has a full/good KPI coverage of all fields on the NCS in place Ambitions: Linking IO and PIAF Mapping IO status on all fields on the NCS in an time efficient way Analyzing correlation between IO-Status and KPI

11 IO PIAF Ongoing process Process Stripping IO into the key functionalities/capabilities Developing a questionnair Mapping IO status for all producing fields on the NCS Integrating in PIAF Field x has. (enablers) Field x can. (functions/capabilities) Field x is achieving. (KPI) = > Extracting IO related performance Side-effects => IO/Efield definition (?) Questioning exisisting /new functionalities (Innovations at the edge)

12 Ongoing process Key functionalities in key processes Reservoir Management Drilling and Well Production Optimalization Operations Maintenance and Modifications

13 Thank you!

14 E.g. Reservoir management Langsiktig utviklingsarbeid; Hvilke plandokumenter foreligger (reservoarstyringsplan, datainnsamlingsplan og/eller langtidsplan)? Hvor ofte oppdateres disse og hvem er involvert? Hvilken status har disse og hva brukes de til? Reservoarstyring; Hvordan og hvor ofte bidrar reservoarmiljøet i kortsiktig produksjons- og reservoarstyring? Hvilke arbeidsprosesser benyttes for å modne boremål, hvem er involvert? Datainnsamling; Verdisettes reservoardata på en realistisk måte og i hvilken sammenheng? Hvilke strategier og hovedtiltak benyttes for å bedre reservoarforståelsen? Hvor ofte gjøres ulike kampanjer? I hvilken grad benyttes smarte løsninger i brønner for datainnsamling/styring? Samhandlingsteknologi; Hvordan sikres tverrfaglig samhandling i arbeidsprosessene? Benyttes særskilt visualiseringsutstyr eller samhandlingsprosedyrer i tverrfaglig integrering Hvilke data kvalitetssikres i sanntid fra land?

15 BACK UP

16 Verdi- og ressurspotensialet Verdipotensialet Produksjonsøkning (økt nåverdi) - Samhandling sanntid, samhandlingsrom, simulering, styring og støtte Kostnadsreduksjoner - Reduserte driftskostnader offshore - Vedlikeholdssystemer, flytting av oppgaver på land, fjernstyring, mindre utreise - Reduserte B&B kostnader - Treffsikker boring, sanntidsoptimalisering, mindre offshoreutsendelser - Økte kostnader onshore Ressurspotensialet Økte reserver (i nær fremtid, med høy NV) - Brønnplassering, reservoarmonitoring og styring Økt utvinning (i nær fremtid, med høy NV) Økte reserver (i fremtiden, men med lav/ingen NV)

17 PIAF Indikatorforslag fra møteserie Innspill til indikatorer: Digital infrastruktur Datastandarder, informasjonssikkerhet, overføringsformater med mer Indikatorer og endringer i organisasjon og prosess Regularitet produksjonsoptimalisering Boreeffektivitet og akselerert produksjon Økt produksjon Måling av e-driftsinvesteringer HMS (slår ut på etablerte KPIer) Innsigelser/utfordringer: E-drift er det samme som effektiv drift (kan ikke isoleres og måles) Hvordan isolere e-driftseffekter (produksjon, reserverøkning, HMS.)? Hvordan isolere e-driftsinvesteringer? Repetitive målinger lar det seg gjøre?

Rapporterer norske selskaper integrert?

Rapporterer norske selskaper integrert? Advisory DnR Rapporterer norske selskaper integrert? Hvordan ligger norske selskaper an? Integrert rapportering er å synliggjøre bedre hvordan virksomheten skaper verdi 3 Norske selskaper har en lang vei

Detaljer

PETROMAKS & Integrerte Operasjoner. Rådgiver Tor-Petter Johnsen, PETROMAKS

PETROMAKS & Integrerte Operasjoner. Rådgiver Tor-Petter Johnsen, PETROMAKS PETROMAKS & Integrerte Operasjoner Rådgiver Tor-Petter Johnsen, PETROMAKS Agenda for presentasjonen Porteføljen IO i PETROMAKS Prosjekter Aktører Penger Utfordringer Tematiske satsingsområder TTA1: Fremtidens

Detaljer

Søknadsskjema Strategiske Partnerskap. Anne Kloster Holst Seniorrådgiver SIU Oslo

Søknadsskjema Strategiske Partnerskap. Anne Kloster Holst Seniorrådgiver SIU Oslo Søknadsskjema Strategiske Partnerskap Anne Kloster Holst Seniorrådgiver SIU Oslo 29. 1.2016 Hva skal beskrives i søknaden? A. General Information B. Context C. Priorities D. Participating Organisations

Detaljer

Climate change and adaptation: Linking. stakeholder engagement- a case study from

Climate change and adaptation: Linking. stakeholder engagement- a case study from Climate change and adaptation: Linking science and policy through active stakeholder engagement- a case study from two provinces in India 29 September, 2011 Seminar, Involvering ved miljøprosjekter Udaya

Detaljer

Opportunities and challenges for the Norwegian Petroleum sector. ABB 08.03.07 Sveinung Sletten, vice president external affairs, Petoro

Opportunities and challenges for the Norwegian Petroleum sector. ABB 08.03.07 Sveinung Sletten, vice president external affairs, Petoro Opportunities and challenges for the Norwegian Petroleum sector ABB 08.03.07 Sveinung Sletten, vice president external affairs, Petoro Petoro Opportunities and challenges for the NCS Petoro s strategy

Detaljer

The building blocks of a biogas strategy

The building blocks of a biogas strategy The building blocks of a biogas strategy Presentation of the report «Background report for a biogas strategy» («Underlagsmateriale til tverrsektoriell biogass-strategi») Christine Maass, Norwegian Environment

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: (Fornavn, etternavn) Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør instituttene og fakultetene

Detaljer

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development

Western Alaska CDQ Program. State of Alaska Department of Community & Economic Development Western Alaska State of Alaska Department of Community & Economic Development The CDQ program was formally approved in 1992 by the North Pacific Fishery Management Council and implemented by Governor

Detaljer

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE:

TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: TEKSTER PH.D.-VEILEDERE FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE AKTUELLE VEILEDERE: Kjære , hovedveileder for Den årlige fremdriftsrapporteringen er et viktig tiltak som gjør

Detaljer

Hva er IO? Offshore logistikkonferanse 2011. Kristiansund. Bjørnar Aas Ph.D in logistics. Molde University College, 2011

Hva er IO? Offshore logistikkonferanse 2011. Kristiansund. Bjørnar Aas Ph.D in logistics. Molde University College, 2011 Hva er IO? Offshore logistikkonferanse 2011 Kristiansund Bjørnar Aas Ph.D in logistics Molde University College, 2011 Historien bak IO Innhold Definisjonen av konseptet 2 Bakgrunn Vi må utvinne mer: Nye

Detaljer

SIU Retningslinjer for VET mobilitet

SIU Retningslinjer for VET mobilitet SIU Retningslinjer for VET mobilitet Gardermoen, 16.09.2014 Oppstart- og erfaringsseminar Tore Kjærgård Carl Endre Espeland 2 Kort om Erasmus+ EUs utdanningsprogram for perioden 2014 2020 Budsjett: 14,7

Detaljer

Hvordan sikre god utvikling av nordlig Nordsjø? Line Geheb, Asset Manager, Petoro A/S

Hvordan sikre god utvikling av nordlig Nordsjø? Line Geheb, Asset Manager, Petoro A/S Hvordan sikre god utvikling av nordlig Nordsjø? Line Geheb, Asset Manager, Petoro A/S Innhold Litt om Petoro Petoros strategi Hovedutfordringene i modne felt Petoros portefølje i den nordlige Nordsjø Snorre

Detaljer

Virginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr.

Virginia Tech. John C. Duke, Jr. Engineering Science & Mechanics. John C. Duke, Jr. A New Paradigm for Health Management of Bridges Presentation Overview Introduction AASHTO Grand Challenges SAFETEA-LU LTBP Is the Problem Unique? RCM A New Paradigm Design, Build, Maintain---Asset Management

Detaljer

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT

UNIVERSITETET I OSLO ØKONOMISK INSTITUTT 1 UNIVERSITETET I OSLO ØKONOMISK INSTITUTT BOKMÅL Utsatt eksamen i: ECON2915 Vekst og næringsstruktur Eksamensdag: 07.12.2012 Tid for eksamen: kl. 09:00-12:00 Oppgavesettet er på 5 sider Tillatte hjelpemidler:

Detaljer

En praktisk anvendelse av ITIL rammeverket

En praktisk anvendelse av ITIL rammeverket NIRF 17. april 2012 En praktisk anvendelse av ITIL rammeverket Haakon Faanes, CIA,CISA, CISM Internrevisjonen NAV NAVs ITIL-tilnærming - SMILI NAV, 18.04.2012 Side 2 Styring av tjenestenivå Prosessen omfatter

Detaljer

Software applications developed for the maritime service at the Danish Meteorological Institute

Software applications developed for the maritime service at the Danish Meteorological Institute Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological

Detaljer

Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt. Wenche Koldingsnes

Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt. Wenche Koldingsnes Tips for bruk av BVAS og VDI i oppfølging av pasienter med vaskulitt Wenche Koldingsnes Skåring av sykdomsaktivitet og skade I oppfølging av pasienter med vaskulitt er vurdering og konklusjon vedr. sykdomsaktivitet

Detaljer

Erfaringer fra en Prosjektleder som fikk «overflow»

Erfaringer fra en Prosjektleder som fikk «overflow» Erfaringer fra en Prosjektleder som fikk «overflow» Per Franzén, Project Manager August 30 th, 2017 ERFARINGER FRA EN PROSJEKTLEDER SOM FIKK «OVERFLOW» AV GDPR BEGREPER OG INSTRUKSER Purpose limitation

Detaljer

What's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid

What's in IT for me? Sted CAMPUS HELGELAND, MO I RANA Tid Pris kr. 490,- Påmelding til Tone på tj@kph.no Frist: 10. januar 2019 DET ER UTFORDRENDE Å FÅ AVGRENSET OG SATT MÅL FOR DIGITALISERINGSPROSJEKTER SOM GIR VERDI FOR VIRKSOMHETEN. SINTEF HELGELAND OG ARCTIC

Detaljer

5 E Lesson: Solving Monohybrid Punnett Squares with Coding

5 E Lesson: Solving Monohybrid Punnett Squares with Coding 5 E Lesson: Solving Monohybrid Punnett Squares with Coding Genetics Fill in the Brown colour Blank Options Hair texture A field of biology that studies heredity, or the passing of traits from parents to

Detaljer

FAMILY MEMBERS EXPERIENCES WITH IN-HOSPITAL CARE AFTER SEVERE TRAUMATIC BRAIN INJURY

FAMILY MEMBERS EXPERIENCES WITH IN-HOSPITAL CARE AFTER SEVERE TRAUMATIC BRAIN INJURY FAMILY MEMBERS EXPERIENCES WITH IN-HOSPITAL CARE AFTER SEVERE TRAUMATIC BRAIN INJURY Audny Anke and Unn Sollid Manskow Trondheim 4. Mai 2017 Unn Sollid Manskow, RN, MPH, PhD Audny Anke, MD, professor Department

Detaljer

Midler til innovativ utdanning

Midler til innovativ utdanning Midler til innovativ utdanning Hva ser jeg etter når jeg vurderer et prosjekt? Utdanningsseminar Onsdag 10 Januari 2018 Reidar Lyng Førsteamanuensis Institutt for pedagogikk og livslang læring, NTNU/ Leder

Detaljer

Exercise 1: Phase Splitter DC Operation

Exercise 1: Phase Splitter DC Operation Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your

Detaljer

Notat. Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne. Dato:

Notat. Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne. Dato: Notat Emne: Midtveisevalueringen av SFI - Tilbakemeldinger fra brukerpartnerne Dato: 23.3.2011 Som en del av grunnlagsmaterialet for Midtveisevalueringen har brukerpartnere i de 14 sentrene som ble evaluert,

Detaljer

Agenda Registration/Refreshments Sponsor Slot Mark Reeve, Chalcroft Construction

Agenda Registration/Refreshments Sponsor Slot Mark Reeve, Chalcroft Construction Sponsored by: Agenda 10.00 Registration/Refreshments 10.30 Sponsor Slot Mark Reeve, Chalcroft Construction 10.35 Host Slot, Stephenson Harwood 10.40 Economic Review James Walton, IGD 11.10 Brexit Adrian

Detaljer

WORLD CLASS INTEGRITY SOLUTIONS. Børge Gjeldvik Axess

WORLD CLASS INTEGRITY SOLUTIONS. Børge Gjeldvik Axess WORLD CLASS INTEGRITY SOLUTIONS Børge Gjeldvik Axess Slik ser vi ut i juli 2014 Employees: 357 Revenues: 100 mill USD 2014 Per June 2014: 30% of revenues and 40% of EBIT from international offices World

Detaljer

Revision of hydropower licenses - prioritisation of rivers for environmental improvement Nordic WFD Conference Reykjavik 27.

Revision of hydropower licenses - prioritisation of rivers for environmental improvement Nordic WFD Conference Reykjavik 27. Revision of hydropower licenses - prioritisation of rivers for environmental improvement Nordic WFD Conference Reykjavik 27. September 2012 Jan Sørensen, Senior Engineer (NVE) Revision of licenses 420

Detaljer

SAMMENDRAG.

SAMMENDRAG. SAMMENDRAG Om undersøkelsen KS ønsker å bidra til økt kunnskap og bevissthet rundt kommunesektorens bruk av sosiale medier 1 gjennom en grundig kartlegging av dagens bruk og erfaringer, samt en vurdering

Detaljer

Er IO målene nådd innen Drift og Vedlikehold? Ivar Sløveren, rådgiver teknologi

Er IO målene nådd innen Drift og Vedlikehold? Ivar Sløveren, rådgiver teknologi Er IO målene nådd innen Drift og Vedlikehold? Ivar Sløveren, rådgiver teknologi Petoro undersøkelse fra 2007 viser betydelig fremgang i operatørenes satsing på IO Business as Usual Value Delivery Building

Detaljer

Internationalization in Praxis INTERPRAX

Internationalization in Praxis INTERPRAX Internationalization in Praxis The way forward internationalization (vt) : to make international; also: to place under international control praxis (n) : action, practice: as exercise or practice of an

Detaljer

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3

Unit Relational Algebra 1 1. Relational Algebra 1. Unit 3.3 Relational Algebra 1 Unit 3.3 Unit 3.3 - Relational Algebra 1 1 Relational Algebra Relational Algebra is : the formal description of how a relational database operates the mathematics which underpin SQL

Detaljer

MØTEPROTOKOLL. Forfall: Navn Funksjon Representerer Håvard Olsen MEDL STU Tina Reppe MEDL STU. Andre: Navn Funksjon Representerer

MØTEPROTOKOLL. Forfall: Navn Funksjon Representerer Håvard Olsen MEDL STU Tina Reppe MEDL STU. Andre: Navn Funksjon Representerer MØTEPROTOKOLL Utvalg: Fakultetsstyret ved Fakultet for biovitenskap og akvakultur Møte nr: 03/12 Møtested: Møterom 3003, Hovedbygget Dato: 06.06.2012 Tidspunkt: 09:00 15:15 Til stede: Navn Funksjon Representerer

Detaljer

Innovasjon og kommersialisering på IFE

Innovasjon og kommersialisering på IFE Innovasjon og kommersialisering på IFE Østfold Nyskapingsnettverk, september 2014 Presentert av Terje Johnsen Avdelingssjef Programvareteknologi Institutt for energiteknikk IFEs Innovasjonsprosess Innovasjon

Detaljer

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no

Public roadmap for information management, governance and exchange. 2015-09-15 SINTEF david.norheim@brreg.no Public roadmap for information management, governance and exchange 2015-09-15 SINTEF david.norheim@brreg.no Skate Skate (governance and coordination of services in egovernment) is a strategic cooperation

Detaljer

GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS

GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS GOE-IP AS- GlobalOrganicEnergy-Intelligent Property AS Projects: 1. Microbial Selective Plugging MSP (Sandstone - reservoirs) 2. Particle Fracture Blocking PFB (Karbonat - reservoirs) 3. Upscaling/Meso

Detaljer

HONSEL process monitoring

HONSEL process monitoring 6 DMSD has stood for process monitoring in fastening technology for more than 25 years. HONSEL re- rivet processing back in 990. DMSD 2G has been continuously improved and optimised since this time. All

Detaljer

SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP)

SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP) SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP) Subsea dag - Sogn og Fjordane - 15.09.2016 Jørn Loug Hansen Subsea Manager, Snorre Expansion Project 1 Classification: Open 4 august 2016 Statoil ASA Snorre-area

Detaljer

Hybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS)

Hybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS) Hybrid Cloud and Datacenter Monitoring with Operations Management Suite (OMS) Varighet: 5 Days Kurskode: M10996 Version: A Opplæringsmetoder: Virtuell opplæring Beskrivelse: This five-day course will provide

Detaljer

Erfaringer med smidige metoder på store prosjekter i Telenor. Kristoffer Kvam, Strategic Project Manager, Portfolio & Projects, Telenor Norway

Erfaringer med smidige metoder på store prosjekter i Telenor. Kristoffer Kvam, Strategic Project Manager, Portfolio & Projects, Telenor Norway Erfaringer med smidige metoder på store prosjekter i Telenor Kristoffer Kvam, Strategic Project Manager, Portfolio & Projects, Telenor Norway Smidig metodikk brukt riktig kan gi store effekter. Her >30%

Detaljer

Lang lønnsom levetid på norsk sokkel. ODV 2013, Bergen Grethe Moen, adm.dir. Petoro AS

Lang lønnsom levetid på norsk sokkel. ODV 2013, Bergen Grethe Moen, adm.dir. Petoro AS Lang lønnsom levetid på norsk sokkel ODV 2013, Bergen Grethe Moen, adm.dir. Petoro AS Stor aktivitet NKS: Leting, utbygging, drift 2 Kilde: Oljedirektoratet Høy aktivitet et gode og en utfordring Ti prosent

Detaljer

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016

PETROLEUMSPRISRÅDET. NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER 2016 1 PETROLEUMSPRISRÅDET Deres ref Vår ref Dato OED 16/716 22.06.2016 To the Licensees (Unofficial translation) NORM PRICE FOR ALVHEIM AND NORNE CRUDE OIL PRODUCED ON THE NORWEGIAN CONTINENTAL SHELF 1st QUARTER

Detaljer

Infrastructure investments on NCS

Infrastructure investments on NCS Infrastructure investments on NCS Kurt Georgsen, CEO, Silex Gas Norway AS Oslo, 21 January 2014 Today s topics Gassled Role of infrastructure companies on the NCS Governance model Framework conditions

Detaljer

HMS og IKT-sikkerhet i integrerte operasjoner

HMS og IKT-sikkerhet i integrerte operasjoner HMS og IKT-sikkerhet i integrerte operasjoner Uønskede hendelser, oppfølging mot indikatorer og planer videre Randi Røisli CISO (Statoil) Leder arbeidsgruppe informasjonssikkerhet (OLF IO) 2 Eller historien

Detaljer

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS

2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS 2A September 23, 2005 SPECIAL SECTION TO IN BUSINESS LAS VEGAS SPECIAL SECTION TO IN BUSINESS LAS VEGAS 3A September 23, 2005 SEE, PAGE 8A Businesses seek flexibility. It helps them compete in a fast-paced,

Detaljer

Forecast Methodology September LightCounting Market Research Notes

Forecast Methodology September LightCounting Market Research Notes Forecast Methodology September 2015 LightCounting Market Research Notes Vladimir Market Kozlov Forecast Methodology, September, September, 2015 2015 1 Summary In summary, the key assump=on of our forecast

Detaljer

Marsh Loss and Tidal Habitat Degradation

Marsh Loss and Tidal Habitat Degradation Marsh Loss and Tidal Habitat Degradation Alternative 2: New Ocean Inlet Data: PWA Alternative 3: Highway 1 Sill Data: PWA Alternative 4: Parsons Slough Data: PWA Alternative 2 Detailed Cost Subtotal: $69,600,000

Detaljer

COUNTRY REPORT- NORWAY

COUNTRY REPORT- NORWAY COUNTRY REPORT- NORWAY EUFRIN BOARD - NOV. 2015 Mekjell Meland Nibio Ullensvang JULY 1, 2015 2 23.11.2015 NIBIO KNOWLEDGE FOR LIFE Our future well-being depends on sustainable use of our natural resources.

Detaljer

Model Description. Portfolio Performance

Model Description. Portfolio Performance Model Description Market timing results from 2000 to 2019 are based on our Market Allocation Algorithm holding the top two (2) ranked assets each month. Risk control is added to keep asset(s) in cash if

Detaljer

Issues and challenges in compilation of activity accounts

Issues and challenges in compilation of activity accounts 1 Issues and challenges in compilation of activity accounts London Group on environmental accounting 21st meeting 2-4 November 2015 Statistics Netherlands The Hague Kristine E. Kolshus kre@ssb.no Statistics

Detaljer

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET.

WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. INNOVATIVE LAV- OG NULLUTSLIPPSLØSNINGER OG UTFORDRINGER MED Å FÅ DISSE INN I MARKEDET. WÄRTSILÄ MARINE SOLUTION POWER CONVERSION INGVE SØRFONN 1 THE FUTURE IS NOW! 2 FROM PRODUCT TO ECOSYSTEM 3 READY

Detaljer

Sarepta Energi AS Projects and Ambitions

Sarepta Energi AS Projects and Ambitions Sarepta Energi AS Projects and Ambitions A major windpower region under developement Potential:1885MW installed capasity - 5205 TWh production Sarepta s vision The vision Is to generate values from Mid

Detaljer

Programseminar for Olje og Gass i Norges forskningsråd Integrert produksjonsstyring; utstyrsbehov og teknologiske nyvinninger

Programseminar for Olje og Gass i Norges forskningsråd Integrert produksjonsstyring; utstyrsbehov og teknologiske nyvinninger Integrert produksjonsstyring: Integrert styring fra reservoar til marked (E-Felt) - OG21 beskrivelse: Et viktig grunnlag for optimale beslutninger er å integrere dynamiske reservoar-, utstyr- og forretningsmodeller.

Detaljer

Bærekraftig FM til tiden/ Bærekraftig FM på tid

Bærekraftig FM til tiden/ Bærekraftig FM på tid Downloaded from orbit.dtu.dk on: Sep 28, 2019 Bærekraftig FM til tiden/ Bærekraftig FM på tid Nielsen, Susanne Balslev Publication date: 2015 Document Version Peer reviewed version Link back to DTU Orbit

Detaljer

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning

ISO 41001:2018 «Den nye læreboka for FM» Pro-FM. Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 «Den nye læreboka for FM» Norsk tittel: Fasilitetsstyring (FM) - Ledelsessystemer - Krav og brukerveiledning ISO 41001:2018 Kvalitetsverktøy i utvikling og forandring Krav - kapittel 4 til

Detaljer

Risikofokus - også på de områdene du er ekspert

Risikofokus - også på de områdene du er ekspert Risikofokus - også på de områdene du er ekspert - hvordan kan dette se ut i praksis? - Ingen er for gammel til å begå nye dumheter Nytt i ISO 9001:2015 Vokabular Kontekst Dokumentasjonskrav Lederskap Stategi-politikk-mål

Detaljer

Integritetsstyring Et verktøy for økt ytelse

Integritetsstyring Et verktøy for økt ytelse Integritetsstyring Et verktøy for økt ytelse Stig Brudeseth, MsC. Manager, Inspection Management Mye kontroll og lite ytelse? Vi utfører utstrakt kontroll av tilstand på utstyret vårt Kan vi få en merverdi

Detaljer

Aker Drilling ASA. Ordinær generalforsamling Oslo, 16. mars The preferred partner. part of the Aker group

Aker Drilling ASA. Ordinær generalforsamling Oslo, 16. mars The preferred partner. part of the Aker group Aker Drilling ASA Ordinær generalforsamling Oslo, 16. mars 2006 Dagsorden 1. Åpning og konstituering 2. Ordinære saker 2.1 Orientering om virksomheten 2.2 Godkjennelse av regnskap og årsberetning 2.3 Fastsettelse

Detaljer

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo,

Den europeiske byggenæringen blir digital. hva skjer i Europa? Steen Sunesen Oslo, Den europeiske byggenæringen blir digital hva skjer i Europa? Steen Sunesen Oslo, 30.04.2019 Agenda 1. 2. CEN-veileder til ISO 19650 del 1 og 2 3. EFCA Guide Oppdragsgivers krav til BIMleveranser og prosess.

Detaljer

EMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post:

EMPIC MEDICAL. Etterutdanningskurs flyleger 21. april Lars (Lasse) Holm Prosjektleder Telefon: E-post: EMPIC MEDICAL Etterutdanningskurs flyleger 21. april 2017 Lars (Lasse) Holm Prosjektleder Telefon: +47 976 90 799 E-post: Lrh@caa.no it-vakt@caa.no Luftfartstilsynet T: +47 75 58 50 00 F: +47 75 58 50

Detaljer

Tor Haakon Bakken. SINTEF Energi og NTNU

Tor Haakon Bakken. SINTEF Energi og NTNU Tor Haakon Bakken SINTEF Energi og NTNU Plan for lynforedrag Energi-indikatorer Vannforbruk Sammenligning stort, smått og vind Multi-kriterieanalyse Sammenligning mellom prosjekter og teknologier Verktøy

Detaljer

Green Corridors - EUs arbeid for bærekraftig godstransport

Green Corridors - EUs arbeid for bærekraftig godstransport Green Corridors - EUs arbeid for bærekraftig godstransport Hva er det og hvilke muligheter og utfordringer gir det for Norge? Transport- og Logistikkdagen 2010 Bergen, 20. september 2010 Atle Minsaas,

Detaljer

York Central Hospital. Vascular Camp 2007

York Central Hospital. Vascular Camp 2007 York Central Hospital Vascular Camp 2007 Our Hemodialysis Program Regional Dialysis Program 40 stations at YCH 25 stations main unit 15 stations in CCC unit 18 stations at Oak Ridges Satellite Unit Southlake/SLED

Detaljer

Implementation of Integrated Operations in Hydro. SPE Bergen 18.04.07 2006-12-14

Implementation of Integrated Operations in Hydro. SPE Bergen 18.04.07 2006-12-14 Implementation of Integrated Operations in Hydro SPE Bergen 18.04.07 20061214 Integrated Operations in Hydro focus and approach Dato: 20061214 Side: 2 IO is advanced technologies and increasing data volumes,

Detaljer

Kontinuerlig og effektiv boreoperasjon for flere selskaper

Kontinuerlig og effektiv boreoperasjon for flere selskaper Kontinuerlig og effektiv boreoperasjon for flere selskaper Sjur Talstad, EVP Norge og Russland Kontinuerlig og effektiv boreoperasjon for flere selskaper Introduksjon AGR Riggmarkedet norsk sokkel Operatørmarkedet

Detaljer

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING

TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING E-postmaler til bruk ved utsendelse av fremdriftsrapportering ph.d.- kandidater og veiledere TEKSTER PH.D.-KANDIDATER FREMDRIFTSRAPPORTERING DISTRIBUSJONS-E-POST TIL ALLE KANDIDATER: Kjære

Detaljer

Utvikling av skills for å møte fremtidens behov. Janicke Rasmussen, PhD Dean Master Tel

Utvikling av skills for å møte fremtidens behov. Janicke Rasmussen, PhD Dean Master Tel Utvikling av skills for å møte fremtidens behov Janicke Rasmussen, PhD Dean Master janicke.rasmussen@bi.no Tel 46410433 Skills project results Background for the project: A clear candidate profile is defined

Detaljer

Klimatiltaket, Elkem Solar. Ressurseffektiv produksjon av solcellemetall ENOVA- støtte til økt ressursutnyttelse

Klimatiltaket, Elkem Solar. Ressurseffektiv produksjon av solcellemetall ENOVA- støtte til økt ressursutnyttelse Klimatiltaket, Elkem Solar Ressurseffektiv produksjon av solcellemetall ENOVA- støtte til økt ressursutnyttelse Hvorfor Solar? Per i dag er solenergi en av få løsninger som allerede fra nå kan betydelig

Detaljer

Exploration Challenges forward. Sissel H Eriksen Director Exploration

Exploration Challenges forward. Sissel H Eriksen Director Exploration Exploration Challenges forward Sissel H Eriksen Director Exploration Exploration challenges Exploration history Acreage - awards and opening of new areas Seismic acquisition and coexistence 09.03. 2 Area

Detaljer

Statoils erfaringer fra CO 2 -lagring

Statoils erfaringer fra CO 2 -lagring Statoils erfaringer fra CO 2 -lagring Presentert av Ola Eiken Tekna kursdager 7. januar 2011 Offshore Sleipner Onshore In Salah Sub-sea Snøhvit 1 - Classification: External 2011-01-07 Snøhvit Sleipner

Detaljer

Status Aker Verdal Mai 2010

Status Aker Verdal Mai 2010 part of Aker Status Aker Verdal Mai 2010 Verdal Formannskap 6. mai 2010 Nina Udnes Tronstad President, Aker Solutions, Verdal 2010 Aker Solutions Financials AKSO total - Q1/2010 ED&S Subsea P&T P&C Revenue

Detaljer

The North-South Corridor - showing progress

The North-South Corridor - showing progress The North-South Corridor - showing progress Euro-Asian Transport Links Expert Group meeting Tashkent, Uzbekistan November 1-3.2010 Stig Nerdal, Senior Adviser, UIC The initial founders of The International

Detaljer

LEAN PLANNING I PROSJEKTBASERT INDUSTRI. NIMA SCM Gabriele Hofinger Jünge

LEAN PLANNING I PROSJEKTBASERT INDUSTRI. NIMA SCM Gabriele Hofinger Jünge LEAN PLANNING I PROSJEKTBASERT INDUSTRI NIMA SCM Gabriele Hofinger Jünge 26.11.2015 I LØPET AV DE NESTE 20 MINUTTENE SKAL JEG FORTELLE OM Livet som forsker Forskningsprosjektet VALUE TANK LEAN planning

Detaljer

- En essensiell katalysator i næringsklyngene? Forskningsrådets miniseminar 12. april Mer bioteknologi i næringslivet hvordan?

- En essensiell katalysator i næringsklyngene? Forskningsrådets miniseminar 12. april Mer bioteknologi i næringslivet hvordan? Instituttsektoren - En essensiell katalysator i næringsklyngene? Forskningsrådets miniseminar 12. april 2011 Mer bioteknologi i næringslivet hvordan? Torstein Haarberg Konserndirektør SINTEF Materialer

Detaljer

Er du nysgjerrig på om det er mulig...

Er du nysgjerrig på om det er mulig... BIMMER: Hvorfor ta steget over til Novapoint DCM og Quadri DCM? SOLVEIG FISKAA OG HEIDI BERG, VIANOVA SYSTEMS Er du nysgjerrig på om det er mulig......å dele alle infrastruktur data i en intelligent modell,

Detaljer

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016,

A NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, OIL & GAS A NEW REALITY DNV GL Industry Outlook for 2016 Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, 1 2013 SAFER, SMARTER, GREENER 3 februar 2016

Detaljer

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau.

CAMES. Technical. Skills. Overskrift 27pt i to eller flere linjer teksten vokser opad. Brødtekst 22pt skrives her. Andet niveau. CAMES Overskrift 27pt i to eller flere linjer Technical Skills Leizl Joy Nayahangan, RN, MHCM Leizl.joy.nayahangan@regionh.dk IMPORTANCE Challenges Brødtekst 22pt of patient skrives her care Increasing

Detaljer

Vedlikeholdsstyring og IO i Valhall REDevelopment. Steinar Bjugn BPN

Vedlikeholdsstyring og IO i Valhall REDevelopment. Steinar Bjugn BPN Vedlikeholdsstyring og IO i Valhall REDevelopment Steinar Bjugn BPN Valhall Re-Development Prosjekt bakgrunn 5,8m innsynkning siden 1982 (per August 2007) Design Life 25 yrs. (1982-2007) 2 Valhall Re-Development

Detaljer

Nettverkene for kommunal og regional planlegging 12. nov Øyvind Aarvig Miljøverndepartementet

Nettverkene for kommunal og regional planlegging 12. nov Øyvind Aarvig Miljøverndepartementet Nettverkene for kommunal og regional planlegging 12. nov 2010 Øyvind Aarvig Miljøverndepartementet Framtidens byer 2008-2014 Hovedmål er å redusere samlet klimagassutslipp fra vegtransport, energibruk

Detaljer

Organizational Project Management Maturity Model (OPM3)

Organizational Project Management Maturity Model (OPM3) Organizational Project Management Maturity Model (OPM3) Håvard O. Skaldebø, PMP, CCE, (haa-skal@online.no) Styreleder, PMI Norway Oslo Chapter (www.pmi-no.org) Prosjekt 2005, 12.oktober 2005, Hotel Rainbow,

Detaljer

SFI-Norman presents Lean Product Development (LPD) adapted to Norwegian companies in a model consisting of six main components.

SFI-Norman presents Lean Product Development (LPD) adapted to Norwegian companies in a model consisting of six main components. Hovedoppgave Masteroppgave ved ved IMM Høsten 2013 Lean Product Development Stability Drivers. Identifying Environmental Factors that Affect Performance. SFI-Norman presents Lean Product Development (LPD)

Detaljer

Interaction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction

Interaction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction Interaction between GPs and hospitals: The effect of cooperation initiatives on GPs satisfaction Ass Professor Lars Erik Kjekshus and Post doc Trond Tjerbo Department of Health Management and Health Economics

Detaljer

Hans Tømmervik, NINA Nikolai K. Winge, NMBU Inge E. Danielsen, Gåebrien Sijte, Røros

Hans Tømmervik, NINA Nikolai K. Winge, NMBU Inge E. Danielsen, Gåebrien Sijte, Røros Project information Project title Environmental Impact Analyses (EIA) for reindeer herding. An evaluation. Year 2013-2016 Project leader Jan Åge Riseth Participants Hans Tømmervik, NINA Nikolai K. Winge,

Detaljer

Implementeringen av ROP retningslinjen; er GAP analyser et

Implementeringen av ROP retningslinjen; er GAP analyser et Implementeringen av ROP retningslinjen; er GAP analyser et effek/vt redskap? Lars Lien, leder Nasjonal kompetansetjeneste for sam

Detaljer

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities

Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Prosjektet Digital kontaktinformasjon og fullmakter for virksomheter Digital contact information and mandates for entities Nordisk Adressemøte / Nordic Address Forum, Stockholm 9-10 May 2017 Elin Strandheim,

Detaljer

Universitet på dypt vann?

Universitet på dypt vann? Universitet på dypt vann? Professor Arnfinn Nergaard Masterstudiet i Offshoreteknologi Institutt for Konstruksjonsteknikk og Materialteknologi Marin- og undervannsteknikk Universitetet i Stavanger UiS

Detaljer

The Research Council of Norway, grants and levels of research

The Research Council of Norway, grants and levels of research 1 The Research Council of Norway, grants and levels of research Thomas Stang - Special adviser Department for Regional Innovation and Development, The Research Council of Norway Eye Care for the Future

Detaljer

CONCURRENT DESIGN Effek0v prosjektering basert på BIM BUILDING SMART NORGE

CONCURRENT DESIGN Effek0v prosjektering basert på BIM BUILDING SMART NORGE CONCURRENT DESIGN Effek0v prosjektering basert på BIM BUILDING SMART NORGE - 25.11.15 Agenda: Kort om Epsis Concurrent Design hva er det og hvor kommer det fra? Prosjekteksempler Sesjonsplanlgging, roller

Detaljer

Kommentar til endringer

Kommentar til endringer VEDLEGG 3 Oversikt over forskjellene mellom standard samarbeidsavtale og forslag til standard unitavtale: Tekst som står i [klamme] er ment å skulle være valgfri. Artikkel i forslag til unitavtale Nye

Detaljer

Subsea-Muligheter for virksomhet i den maritime klyngen. Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø

Subsea-Muligheter for virksomhet i den maritime klyngen. Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø Subsea-Muligheter for virksomhet i den maritime klyngen Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø Utbygging og vedlikehold av subsea anlegg Hensikt: Gi et lite innblikk

Detaljer

Gjenopprettingsplan DNBs erfaringer. Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017

Gjenopprettingsplan DNBs erfaringer. Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017 Gjenopprettingsplan DNBs erfaringer Roar Hoff Leder av Konsern-ICAAP og Gjenopprettingsplan Oslo, 7. desember 2017 Lik konkurranse krever full harmonisering av systemet Like definisjoner Konsistent bruk

Detaljer

INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011)

INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) INSTRUKS FOR VALGKOMITEEN I AKASTOR ASA (Fastsatt på generalforsamling i Akastor ASA (tidligere Aker Solutions ASA) 6. mai 2011) 1 Oppgaver Valgkomiteens oppgaver er å avgi innstilling til - generalforsamlingen

Detaljer

TriCOM XL / L. Energy. Endurance. Performance.

TriCOM XL / L. Energy. Endurance. Performance. TriCOM XL / L Energy. Endurance. Performance. L and XL - the new generation Sample charging station with chargers TriCOM L / XL Innovative charging technology The new TriCOM L - XL chargers are controlled

Detaljer

TOTAL - VEKST I VEST. 13. november 2014 DM

TOTAL - VEKST I VEST. 13. november 2014 DM TOTAL - VEKST I VEST 13. november 2014 DM1030943 AGENDA TOTAL s portefølje Status aktiviteter Garantiana og Tannat Erfaringer med Saga Fjordbase A competitive position in Norway TOTAL E&P NORGE AS 2013

Detaljer

Organisering og prosess for innovasjon og designstyring. Motsetning eller nødvendighet?

Organisering og prosess for innovasjon og designstyring. Motsetning eller nødvendighet? Organisering og prosess for innovasjon og designstyring. Motsetning eller nødvendighet? Hilde Britt S.Mellbye Konserndirektør HÅG Noen innledende spørsmål: Kan man analysere deg frem til banebrytende ideer?

Detaljer

The CRM Accelerator. USUS February 2017

The CRM Accelerator. USUS February 2017 The CRM Accelerator USUS February 2017 The CRM Accelerator n To start conversations about CRM n To stimulate experiments with aspects of CRM n To share ideas n To learn and pass on experiences and knowledge

Detaljer

ROS analyse for samfunnskritiske IKT systemer. Utfordringer og muligheter 24/11-05

ROS analyse for samfunnskritiske IKT systemer. Utfordringer og muligheter 24/11-05 ROS analyse for samfunnskritiske IKT systemer Utfordringer og muligheter 24/11-05 Hermann Steen Wiencke Proactima/Universitetet i Stavanger 1 Et samarbeid mellom Universitetet i Stavanger og Rogalandsforskning

Detaljer

Andrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen

Andrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen Andrew Gendreau, Olga Rosenbaum, Anthony Taylor, Kenneth Wong, Karl Dusen The Process Goal Definition Data Collection Data Preprocessing EDA Choice of Variables Choice of Method(s) Performance Evaluation

Detaljer

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION

REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION 2011-2014 FORD EXPLORER PARTS LIST Qty Part Description Qty Part Description 1 Bull Bar 2 12mm x 35mm Bolt Plates 1 Passenger/Right Mounting Bracket 2 12mm Nut Plate 1 Driver/Left Mounting Bracket 2 12mm

Detaljer

Strategi med kunden i fokus

Strategi med kunden i fokus Strategi med kunden i fokus 4. November 2016 Trond Winther, Head of Department SAFER, SMARTER, GREENER Innhold 1 Bakgrunn og utfordring 2 Strategi 3 Læringer 2 Our vision: global impact for a safe and

Detaljer

Uke 5. Magnus Li INF /

Uke 5. Magnus Li INF / Uke 5 Magnus Li magl@ifi.uio.no INF3290 26/27.09.2017 Repetisjon av begreper Diskusjonsoppgaver I første innlevering ønsker vi et brukerperspektiv i et informasjonssystem - Hva kan inngå i et slikt informasjonssystem?

Detaljer