Flodbølger fra Åknes. - matematikk i praktisk bruk. Sylfest Glimsdal, NGI. Geiranger Definition:
|
|
- Hjørdis Holt
- 7 år siden
- Visninger:
Transkript
1 Flodbølger fra Åknes - matematikk i praktisk bruk Sylfest Glimsdal, NGI Geiranger What is a tsunami? Definition: Unusually large wave in a harbour (Japanese) Wave generated by huge and sudden displacement of water (e.g. earthquakes, slides, volcanoes, asteroids) Characteristics: Wave period: minutes Initial wave height: Submarine slides, earthquakes O(1-10 m) Rockslides O( m) Run up heights span from Run-up heights span from centimetres to hundreds of meters
2 Tsunami studiesa multidisciplinary task Triggers constitute great spans from: Asteroids to Earthquakes From deep sea submarine slides to high h mountain rock slides From Krueger & Ohrnberger (2005) Wave propagation speeds Type: Light, Speed: km/s Sound(air) Sound(water) Seismic waves Ocean waves 340 m/s 500 m/s m/s < 315 m/s
3 A rough classification of different ocean waves Max height (m) Wave length Period Wind waves (m) s Swell (km) s Tsunami (km) 1-15 min Storm surge (km) 6-12 hours Tidal wave (km) hours Inundation profiles and definitions Maximum wave Maximum inundation height Flow height Run-upup height Equilibrium water depth Inundation length Typical feature for long wave Run-up up < Maximum inundation Friction reduces the flow height
4 Characteristic waveform during tsunami generation from an earthquake in a subduction zone dip slip dominant in wave generation The 2004 Idi Indian Ocean tsunami M=9.3; t=20 t=80 t=40 t=120 t=60 t=100 min
5 Characteristic wave pattern generated by a submarine slide dipole The observer will first see a withdrawal of the sea surface The tsunami from the 8200 BP Storegga slide, Western Norway Fig. 1 Volume: 2400 km3 Max speed: 35 m/s Run-out distance: 150 km > 10 m > 20 m Storegga Slide 9-10 m 3-5 m m 6-7 m 3-6 m Storegga tsunami deposits Run-up of tsunami deposits
6 Animasjon av Storegga Tsunami deposits 14 C dated to 7312±35 yr BP = cal yr BP Courtesy: Stein Bondevik, UiT
7 Storegga slide tsunami, Numerical model and field data correspond remarkably well Location Observed(m) Calculated* (m) Fig. 1 Gurskøy/Bergsøy Ålesund/Sula l Bjugn Scotland 3-6 a 4 Faeroe Islands >15-25 ~20 b > 10 m > 20 m Storegga Slide 6-7 m m 9-10 m 3-5 m 3-6 m *Not corrected for retrogressive effects a) Numerous sites b) Analytical estimate of fjord amplification (Greens law) Observational data from Bondevik et al. (2004) Storegga tsunami deposits Run-up of tsunami deposits Earthquakes and landslides different spreading effects in three dimensions Landslide generated waves Earthquake generated waves
8 Rockslides in fjords Tsunamis become shorter and higher when moving from the open sea into shallower waters Wave propagation speed c = (gh) 1/2 c a h u
9 Amplifisering mot grunnere vann Effekt av ikke-lineariteter og dispersjon Ikke-lineariteter: brattere front ved grunnere vann, kan lede til brytning til slutt Dispersjon: bølgene propagerer med hastighet avhengig ggav bølgelengde. g Lengste bølger beveger seg raskest.
10 Ikke lineær effekt: brattere front Dispersjon Courtesy: Geir Pedersen, UiO
11 Dispersjon (2) Tsunami damage Banda Aceh, Sumatra, 2004 Courtesy - USGS Erosion, Nam Kem, Thailand 2004 Cikembulan, Java 2006 Cipatuja, Java 2006
12 Tsunami transport and sedimentation Boat, Nam Kem Thailand 2004 Boulders and corals, Bulak Benda, Java 2006 Sediments and salt, Java 2006 Japan 10. mars 2011
13 Japan 10. mars 2011 sammenligning med observasjoner Japan 2011
14 Japan 2011 Filmer
15 Examples of historical events in Europe (courtesy, S. Tinti, Univ. of Bologna) NE Atlantic: Assessment of potential sources 30 ky BP Hinlopen slide Lyngen (Norway) Jan Mayen Western Norway North Sea Fan Portuguese fault Grand banks Carribean Cape Verde Canaries
16 Åknes is located in a fjord area where large rock slides are a normal process Figure from NGU Flodbølger etter potensielle skred fra Åknes NGI-prosjekt , ÅTB oppdragsgiver Maksimalt volum ~80 Mm til ca. 900 m.o.h. Størst bevegelse i øvre vestre del 1 km
17 7-20 cm / year 3-4 cm / year Storfjorden Trangt fjordsystem med bratte fjellsider Mki Maksimaltdyp mer enn 700 m Fjordbunnene i de indre delene er de mest kritiske lokasjonene Sterkest amplifisering av bølgene Storparten av innbyggerene i området bor her Om sommeren besøker tusenvis av turister området hver dag Ankomsttider for bølger fra Åknes Hellesylt, 4-5 min Geiranger, 10 min Tafjord, 12 min
18 Scenarier 18 Mm3 dimensjonerende (årlig sannsynlighet ~1/1000) 54 Mm3 evakuering (< 1/1000) EWS based on the fact that large rock slides give many pre-failure signals Rod extensometers, GPS, instrumented boreholes, laser technology, radars, seismic network of geophones, automated total station with 30 prisms, weather station, web cameras Courtesy, K. Jogerud, Åknes Tafjord Beredskap
19 The early-warning is based on the fact that large rockslides give many pre-failure signals 600 Di splacem ment [mm m] Randa, Sveits Movements Point 2 Point 3 Point 1 Failure 0 26-avr avr avr-91 2-mai-91 4-mai-91 6-mai-91 8-mai mai-91 Date Courtesy, K. Jogerud, Åknes Tafjord Beredskap Åknes: Preliminary threshold values for alert levels els Green Low Blue increased Yellow Warning Orange High Red Alarm Courtesy, K. Jogerud, Åknes Tafjord Beredskap
20 Utvalgte historiske skred/bølge hendelser i Norge Tjelle 1756 (15 Mm3; største historiske fjellskred i Norge) Skafjell 1731 (3,5-4 Mm3) Tafjord 1934 (2-3 Mm3) Loen 1905 (0,35 Mm3) og 1937 (1Mm3) Tafjord mill. m 3 Maks. oppskylling 62 m 41 døde
21 Oppskylling M. Kaldhol Tafjord, 1934 Fjøra før og etter
22 Ramnefjell Loen, 1905: 34 killed 1936: 73 killed Modeling approach Laboratory experiments 2D and 3D (scale 1:500) Input and verification of numerical tsunami models Slide modeling Box shaped (idealized) slides (not necessarily less realistic) Numerical slide models Tsunami modeling Input from laboratory experiments Sensitivity tests find parameter dependencies (shape of slide, run-out dist., impact velocity etc.) Numerical modeling of the run-up Calibration of model against historical events Hazard and risk mapping
23 Modellering av skred Blokk (med antatte dimensjoner) Utløpsdistanse estimeres fra avsetninger av tidligere skred relasjoner mellom volum og høyde/utløpslengde til kjente skred (statistikk) Hastighetsforløp fra Analytiske beregninger Energibetraktninger Skredmodeller, 2D Skredmodeller, 3D Likninger som beskriver bølger Basert på likninger som beskriver bevegelsen: Lineært hydrostatisk ti Ikke lineære og dispersive
24 Fra likninger til numeriske beregninger (1) Fra likninger til numeriske beregninger (2) Fra kontinuerlig partiell derivert til diskret differanser u u H t u H t i i t i t i 2 1/ 2 1/, 1, Fra kontinuerlig partiell derivert, til diskret differanser x t x t
25 Flodbølgemodeller ved NGI Propagering (bølger i åpent farvann/fjord) Forskjellige modeller for 2D eller 3D beregninger Genereringen: input fra skredmodeller ev. jordskjelv etc. Avanserte modeller som tar hensyn til bølgeeffekter som a. Dispersjon (bølgene beveger seg i en hastighet avhengig av bølgelengde) b. Ikke-linearitet ea (bølgene e blir steilere e e inn mot grunnere gu ee vann) Oppskylling Tar bølgen inn fra propageringsmodellen og beregner hvordan vannet beveger seg innover land
26 Maksimal overflatehevning 54Mm3 NB: Overflatehevning ute på fjorden, ikke oppskyllingshøyder
27 Faresonering Hellesylt 2B, 18Mm3 mest sannsynlig, dimensjonerende 1C, 54Mm3, evakuering Geiranger
28 Stranda Øye (Norangsdalen)
29 Ankomst tider Beregnede oppskyllingshøyder y (m) Åknes: 1C=54Mm3 2B=18Mm3 Hegguraksla: H2=2.0Mm3 H3=3.5Mm3 Location Scenarios Name no 1C 2B H2 H3 Dyrkorn Eidsdal Fjøra Geiranger Gravaneset Hellesylt Hundeidvik Linge Magerholm Norddal Oaldsbygda Ramstadvika Raudbergvika Skardbøen Stordal Stranda Sykkylvsfjorden Tafjord Vaksvik Valldal Vegsundet Vika Ørskog
30 Andre NGI-prosjekt i Storfjorden Sula kommune (opptil 2 m), ca. 50 km, ankomst 20 min Hareid kommune (1-4 m, inkludert havnivåstign.) )ca 80 km, ankomst 25 min. Ørsta kommune (pågår nå, 1-2 m maks 3-5 5m) Validering av modellene Etterberegning av kjente historiske hendelser Tafjord, Skafjell, Tjellefonna m.m. Sammenligning med laboratorieforsøk 2D (UiO) 3D (SINTEF) Bencmark testing også mot kjente analytiske g g j y løsninger
31 Laboratorieforsøk 2D Universitetet i Oslo Testing av beregningsmodeller (numeriske modeller) Grunnlag for instrumentering I 3D lab ved SINTEF Laboratorieforsøk 3D Hellesylt Kyst og Havne Laboratoriet ved SINTEF, Trondheim Skala 1:500 Stort forskningsprosjekt NFR pågår nå (NGI/UiO/SINTEF)
32
Mulige flodbølger fra Åkerneset
Mulige flodbølger fra Åkerneset Carl B. Harbitz, NGI Med bidrag fra S. Glimsdal, V. Kveldsvik, F. Løvholt, NGI G. Pedersen, A. Jensen, UiO Åkneskonferansen, Geiranger, 26. august 2015 Flodbølger - tverrfaglig
DetaljerÅKNES. Åknes Rapport 05.2011. Scenario og prognoser for fjellskred og flodbølger fra Åknes og Hegguraksla
Åknes Rapport 05.2011 Scenario og prognoser for fjellskred og flodbølger fra Åknes og Hegguraksla Revidert og utvida utgave av Åknes Rapport 01.2010 Foto Richard Nordland ÅKNES/TAFJORD BEREDSKAP IKS, ØDEGÅRDSVEGEN
DetaljerÅKNES. Åknes Rapport Scenario og prognoser for fjellskred og flodbølger fra Åknes og Hegguraksla
Åknes Rapport 01.2010 Scenario og prognoser for fjellskred og flodbølger fra Åknes og Hegguraksla /TAFJORD BEREDSKAP IKS, ØDEGÅRDSVEGEN 176, N-6200 STRANDA LARS HARALD BLIKRA ORG.NR.: NO 893 276 882 MVA
DetaljerÅknes. Yngres nettverk 12.05.2011. nasjonalt senter for fjellskredovervåkning. Åknes/Tafjord Beredskap IKS
Åknes Åknes/Tafjord Beredskap IKS nasjonalt senter for fjellskredovervåkning Yngres nettverk 12.05.2011 o overvåkning av fjellskred og hvorfor? o beredskapssenteret o våre objekter o Bølgemodellering og
DetaljerGeofarer i Norge i dagens og fremtidens klima. Christian Jaedicke Norges Geotekniske Institutt
Geofarer i Norge i dagens og fremtidens klima Christian Jaedicke Norges Geotekniske Institutt Undersøker sammenheng mellom vær og skredhendelser Situasjonen i dagens og fremtidens klima Studerer hele landet
DetaljerFylkesmannen i Møre og Romsdal. Excursion to Åkeneset August 30th Head of section Ketil Matvik Foldal
Excursion to Åkeneset August 30th 2012. Head of section Ketil Matvik Foldal Møre og Romsdal County Population: 260.000 36 municipalities Møre og Romsdal County Population: 260.000 36 municipalities 3 ethnic
DetaljerAP 1: Utvikle ny Oslofjordmodell
AP 2: Oljedrift AP 1: Utvikle ny Oslofjordmodell AP 3: Havneutvikling Litt orientering Status på arbeidspakkene AP1: Utvikle ny Oslofjordmodell AP2: Oljedrift AP3: Moss havn Fremdriftsplan Oppsummering
DetaljerArne Bjørlykke Seminar 5 okt.- 06 Geologi for Samfunnet Geohazard ekspertise i Norge og internasjonalt utfordringer
Arne Bjørlykke Seminar 5 okt.- 06 Geologi for Samfunnet Geohazard ekspertise i Norge og internasjonalt utfordringer Oddvar Kjekstad Geohazards, hva legger vi i det? Hendelser forårsaket av geologiske forhold
DetaljerFarlege fjell eller troll som kan temjast?
Farlege fjell eller troll som kan temjast? - risiko - scenario - beredskap - utfordringar Samfunnstryggleikskonferansen i Stavanger, 12. januar 2009 Ved fylkesberedskapssjef Ketil Matvik Foldal Søraust-Asia,
DetaljerNGU Rapport 2006.039. Åknes/Tafjord prosjektet: Sannsynlighet og risiko knyttet til fjellskred og flodbølger fra Åknes og Hegguraksla
NGU Rapport 2006.039 Åknes/Tafjord prosjektet: Sannsynlighet og risiko knyttet til fjellskred og flodbølger fra Åknes og Hegguraksla Norges geologiske undersøkelse 7491 TRONDHEIM Tlf. 73 90 40 00 Telefaks
DetaljerMarsh Loss and Tidal Habitat Degradation
Marsh Loss and Tidal Habitat Degradation Alternative 2: New Ocean Inlet Data: PWA Alternative 3: Highway 1 Sill Data: PWA Alternative 4: Parsons Slough Data: PWA Alternative 2 Detailed Cost Subtotal: $69,600,000
DetaljerFjellskred i Møre og Romsdal risiko og utfordringar
Brukaren: Fjellskred i Møre og Romsdal risiko og utfordringar Einar Anda, Kommunal- og beredskapsavdelinga, Møre og Romsdal fylke Brukaren:? Fjellskred i Møre og Romsdal risiko og utfordringar Einar Anda,
DetaljerPresisjonsseismologi: Nøyaktig lokalisering av Nord-Koreas prøvesprengninger
NGFs 100-års Jubileumssymposium, Geilo, 20. 22. september 2017 Presisjonsseismologi: Nøyaktig lokalisering av Nord-Koreas prøvesprengninger Tormod Kværna Steven Gibbons NGFs 100-års Jubileumssymposium,
DetaljerSubsea-Muligheter for virksomhet i den maritime klyngen. Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø
Subsea-Muligheter for virksomhet i den maritime klyngen Utbygging og vedlikehold av subsea anlegg Prosjektleder : Torstein Vinterstø Utbygging og vedlikehold av subsea anlegg Hensikt: Gi et lite innblikk
DetaljerNeural Network. Sensors Sorter
CSC 302 1.5 Neural Networks Simple Neural Nets for Pattern Recognition 1 Apple-Banana Sorter Neural Network Sensors Sorter Apples Bananas 2 Prototype Vectors Measurement vector p = [shape, texture, weight]
DetaljerStrategy for the Northern Areas Development of R&D and Forecasting
Strategy for the Northern Areas Development of R&D and Forecasting Helge Tangen, Regional Director Vervarslinga for Nord-Norge 19.juni 2014 Forecasting for Ocean & Atmosphere in the Arctic What are we
DetaljerModellering av lyd fra seismikk i forhold til havbunnstopografi
Fisk & Seismikk 211 Modellering av lyd fra seismikk i forhold til havbunnstopografi og sesong variasjoner Jens M. Hovem og Tron Vedul Tronstad SINTEF IKT /Akustikk Trondheim 1 Akustisk biologisk modell
DetaljerFYSMEK1110 Eksamensverksted 23. Mai :15-18:00 Oppgave 1 (maks. 45 minutt)
FYSMEK1110 Eksamensverksted 23. Mai 2018 14:15-18:00 Oppgave 1 (maks. 45 minutt) Page 1 of 9 Svar, eksempler, diskusjon og gode råd fra studenter (30 min) Hva får dere poeng for? Gode råd fra forelesere
DetaljerThe Proactima way PREPARED. Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap
The Proactima way Hvordan bruke oljedriftsimuleringer til å forbedre planlegging av brønner og optimalisere oljevernberedskap Tekna Beredskapsdagene 2014 Espen Hoell og Jared Eckroth PREPARED. Proactima
DetaljerRISIKOKOMMUNIKASJON. Forhindre at potensielle og nære framtidige truslar skjer Risiko = sannsyn x konsekvens. Oppfattar vi likt?
1 RISIKOKOMMUNIKASJON Forhindre at potensielle og nære framtidige truslar skjer Risiko = sannsyn x konsekvens. Oppfattar vi likt? 2 3 INNHALD Risikooppfatning PhD arbeidet Restitusjon etter -og førebuing
DetaljerData Sheet for Joysticks
Available with Potentiometers or Hall sensors Several handle options Small size at low installation depth The 812 series is available with several different handle options. These small joysticks are recommended
DetaljerSlope-Intercept Formula
LESSON 7 Slope Intercept Formula LESSON 7 Slope-Intercept Formula Here are two new words that describe lines slope and intercept. The slope is given by m (a mountain has slope and starts with m), and intercept
DetaljerSatellite Stereo Imagery. Synthetic Aperture Radar. Johnson et al., Geosphere (2014)
Satellite Stereo Imagery Synthetic Aperture Radar Johnson et al., Geosphere (2014) Non-regular sampling Missing data due to lack of correlation, shadows, water, Potentially 3D as opposed to purely 2D (i.e.
DetaljerData Sheet for Joysticks
Available with Potentiometers or Hall sensors Several handle options Small size at low installation depth The 812 series is available with several different handle options. These small joysticks are recommended
DetaljerLevel Set methods. Sandra Allaart-Bruin. Level Set methods p.1/24
Level Set methods Sandra Allaart-Bruin sbruin@win.tue.nl Level Set methods p.1/24 Overview Introduction Level Set methods p.2/24 Overview Introduction Boundary Value Formulation Level Set methods p.2/24
DetaljerThe regulation requires that everyone at NTNU shall have fire drills and fire prevention courses.
1 The law The regulation requires that everyone at NTNU shall have fire drills and fire prevention courses. 2. 3 Make your self familiar with: Evacuation routes Manual fire alarms Location of fire extinguishers
DetaljerFjellskredovervåkinga
Fjellskredovervåkinga Seksjon for fjellskred Skred og vassdragsavdelingen 17 personer (Stranda, Kåfjord, Trondheim, Molde) Geologer, Teknisk/Ingeniører/IT, Adm./Økonomi Overvåkingssenter i Stranda og Kåfjord
DetaljerKalibrering. Hvordan sikrer Norsonic sporbarhet av måleresultatene. Ole-Herman Bjor
Kalibrering Hvordan sikrer Norsonic sporbarhet av måleresultatene Ole-Herman Bjor Norsonic kalibreringslaboratorium Norsonic kalibreringslaboratorium etablert i 1993. Akkreditert av Norsk akkreditering
DetaljerUSTABILE FJELLPARTIER I ROGALAND:
USTABILE FJELLPARTIER I ROGALAND: Systematisk kartlegging og risikoklassifisering M. Böhme R. Hermanns, I. Penna, P. Nicolet Definisjon av begreper USTABILE FJELLPARTI (unstable rock slope) FJELLSKRED
DetaljerØrskog kommune flodbølge ved Sjøholt Beregninger og tiltak for områder utenfor Sjøholt sentrum
Ørskog kommune flodbølge ved Sjøholt Beregninger og tiltak for områder utenfor Sjøholt sentrum 20130150-02-R 22. april 2014 Prosjekt Prosjekt: Dokumentnr.: Dokumenttittel: Dato: 22. april 2014 0 Oppdragsgiver
DetaljerTsunamier Mekanismer og vitenskapelige utfordringer.
Intro Comp. Waves Quakes Slides Tsunamier Mekanismer og vitenskapelige utfordringer. Pedersen G. Bidrag fra: H. Fritz, C. Harbitz, F. Løvholt, S. Glimsdal, L.H. Blikra, A. Jensen, M. Brown, P. Gauer, G.
DetaljerPéter Bakonyi VITUKI
Péter Bakonyi VITUKI Outline EU vs. Hungarian requirements Hungarian approach Preliminary flood hazard maps Flood hazard mapping Large rivers Small rivers Excess water What s next? 16-11-2009 Meeting of
DetaljerFjellskredovervåking. GeoForum Hedmark og Oppland Øyer 7. februar, Einar Anda Norges vassdrags- og energidirektorat (NVE)
Fjellskredovervåking GeoForum Hedmark og Oppland Øyer 7. februar, 2018 Einar Anda Norges vassdrags- og energidirektorat (NVE) Min bakgrunn: Utdanning: - Univ. i Bergen, 1980: geolog Arbeid: - Univ. i Bergen
Detaljer1 - Integrert miljøovervåking Statoil forsknings og utviklingsprosjekt Lars Petter Myhre
1 - Integrert miljøovervåking Statoil forsknings og utviklingsprosjekt Lars Petter Myhre Dagens miljøovervåkingsregime Øyeblikksbilder av utvalgte fysiske/kjemiske og biologiske parametere. Sedimenter
DetaljerAlternativer til teststrekk med høye laster
Alternativer til teststrekk med høye laster Riggflytt i praksis, Kristiansund 09.05.2012 Ole Gunnar Helgøy, Global Maritime Sébastien Rességuier, DNV Agenda Bakgrunn Digin Polyester Sesonganalyse Bakgrunn
DetaljerExercise 1: Phase Splitter DC Operation
Exercise 1: DC Operation When you have completed this exercise, you will be able to measure dc operating voltages and currents by using a typical transistor phase splitter circuit. You will verify your
DetaljerInstitutt for biovitenskap
Institutt for biovitenskap Oppslag for alle avtrekksskap: Alle avtrekksskap skal ha forklaring på alarmsystem på det enkelte skap. Dette varier fra skap til skap. e.g. på IBV finnes det minst 3 ulike typer.
DetaljerIPCC, From emissions to climate change
IPCC, 2007 From emissions to climate change Increased greenhouse effect Global temperature change Warming during the period 1880-2012 is 0.85 C The first decade this century is the warmest in the period
DetaljerModellering av hydrologiske prosesser med høy oppløsning i tid og rom. Stein Beldring Norges vassdrags- og energidirektorat
Modellering av hydrologiske prosesser med høy oppløsning i tid og rom Stein Beldring Hvorfor høy oppløsning i tid og rom? Modellens skala må gi en realistisk beskrivelse av prosessenes variasjon i tid
DetaljerTriCOM XL / L. Energy. Endurance. Performance.
TriCOM XL / L Energy. Endurance. Performance. L and XL - the new generation Sample charging station with chargers TriCOM L / XL Innovative charging technology The new TriCOM L - XL chargers are controlled
DetaljerSiS GO ELECTROLYTE POWDERS
VOSS BERGEN-VOSS Energibehov til Bergen-Voss er et regnestykke. For å gjøre opplevelsen best mulig, må kroppen opprettholde væskebalansen og få energitilskudd for å unngå kramper og holde kraften oppe.
DetaljerSENSORS. HAIN An Integrated Acoustic Positioning and Inertial Navigation System
SENSORS HAIN An Integrated Acoustic Positioning and Inertial Navigation System Hans Petter Jacobsen and Jan Erik Faugstadmo Session Chair Steve Browne, Thales Geo Solutions September 16-17, 2003 Houston,
DetaljerKjell Arne Mork, Francisco Rey, Henrik Søiland
Argo data in the Norwegian Sea Kjell Arne Mork, Francisco Rey, Henrik Søiland Institute of Marine Research, Norway Euro-Argo User Workshop, Paris June 21 Outline Institute Marine Research s monitoring
DetaljerSprak i TBM-tunneler
Øyvind Dammyr Sprak i TBM-tunneler Informasjon i denne presentasjonen er utarbeidet i forbindelse med PhD arbeid utført av undertegnede ved NTNU/Technische Universität München Foto (Sweco): Ø3.5m TBM tunnel
DetaljerFremtidens naturkatastrofer overvåkes og varsles
Fremtidens naturkatastrofer overvåkes og varsles Dag Inge Danielsen Av tenkelige, framtidige naturkatastrofer i Nord-Norge er skred fra Nordnesfjellet med flodbølge i Lyngen et av de scenariene som er
DetaljerNO X -chemistry modeling for coal/biomass CFD
NO X -chemistry modeling for coal/biomass CFD Jesper Møller Pedersen 1, Larry Baxter 2, Søren Knudsen Kær 3, Peter Glarborg 4, Søren Lovmand Hvid 1 1 DONG Energy, Denmark 2 BYU, USA 3 AAU, Denmark 4 DTU,
DetaljerFjellskredrisiko i Norge, fra kartlegging til beredskap
Fjellskredrisiko i Norge, fra kartlegging til beredskap Einar Anda Norges vassdrags- og energidirektorat (NVE) Rogaland/Sand 23. mai, 2017 Romsdalen/Trollveggen, september, 1998: Romsdalen/Trollveggen,
DetaljerEngaging Stakeholders in Sediment Management Examples from the United States
Engaging Stakeholders in Sediment Management Examples from the United States Steven Wolf US Army Corps of Engineers, New England District Igor Linkov, John T. Vogel US Army Corps of Engineers Engineer
DetaljerTor Haakon Bakken. SINTEF Energi og NTNU
Tor Haakon Bakken SINTEF Energi og NTNU Plan for lynforedrag Energi-indikatorer Vannforbruk Sammenligning stort, smått og vind Multi-kriterieanalyse Sammenligning mellom prosjekter og teknologier Verktøy
DetaljerFlodbølge fra Åkneset - påvirkning på fiskeoppdrettsanlegg i Urke, Ørsta kommune november 2008 Rev. 0
Flodbølge fra Åkneset - påvirkning på fiskeoppdrettsanlegg i Urke, Ørsta kommune 20081633-1 17. november 2008 Rev. 0 Prosjekt Prosjekt: Flodbølge fra Åkneset - påvirkning på fiskeoppdrettsanlegg i Urke,
DetaljerTFY4170 Fysikk 2 Justin Wells
TFY4170 Fysikk 2 Justin Wells Forelesning 5: Wave Physics Interference, Diffraction, Young s double slit, many slits. Mansfield & O Sullivan: 12.6, 12.7, 19.4,19.5 Waves! Wave phenomena! Wave equation
DetaljerHONSEL process monitoring
6 DMSD has stood for process monitoring in fastening technology for more than 25 years. HONSEL re- rivet processing back in 990. DMSD 2G has been continuously improved and optimised since this time. All
Detaljer«Changingplaces and spaces in the kindergarden»
Childrens sosial participation and creativ transformation in «Changingplaces and spaces in the kindergarden» Aview intooneofthe projectsof«unused areas» Observationsfrom guidedstudentprojectin leadingart
DetaljerHvor finner vi flått på vårbeiter? - og betydning av gjengroing for flåttangrep på lam på vårbeite
Hvor finner vi flått på vårbeiter? - og betydning av gjengroing for flåttangrep på lam på vårbeite Lucy Gilbert, Lise Grove, Unni Støbet Lande, Ingeborg Klingen, Kirstyn Brunker Gjenngroing På verdensbasis
DetaljerCLASSIFICATION OF AQUACULTURE LOCATIONS IN NORWAY WITH RESPECT TO WIND WAVE EXPOSURE. Pål Lader Dep. of Aquaculture Technology SINTEF Ocean
CLASSIFICATION OF AQUACULTURE LOCATIONS IN NORWAY WITH RESPECT TO WIND WAVE EXPOSURE Pål Lader Dep. of Aquaculture Technology SINTEF Ocean Norwegian salmon sites Number of sites Owners Sites > 50 3 304
DetaljerSAS FANS NYTT & NYTTIG FRA VERKTØYKASSA TIL SAS 4. MARS 2014, MIKKEL SØRHEIM
SAS FANS NYTT & NYTTIG FRA VERKTØYKASSA TIL SAS 4. MARS 2014, MIKKEL SØRHEIM 2 TEMA 1 MULTIPROSESSERING MED DATASTEGET Multiprosessering har lenge vært et tema i SAS Stadig ny funksjonalitet er med på
DetaljerHva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det
Hva skal vi dimensjonere rør og flomveier for i fremtiden og hvordan gjør vi det Tone M. Muthanna Associate Professor Department of Hydraulic and Environmental Engineering NTNU 20% 10% (Lindholm, 2012)
DetaljerPSi Apollo. Technical Presentation
PSi Apollo Spreader Control & Mapping System Technical Presentation Part 1 System Architecture PSi Apollo System Architecture PSi Customer label On/Off switch Integral SD card reader/writer MENU key Typical
DetaljerHavrommet. 70 % av jordens overflate er hav. Ocean Space Centre. Møre Ocean lab Det Digitale Havrom. Norwegian University of Science and Technology
Havrommet Ocean Space Centre Møre Ocean lab Det Digitale Havrom 70 % av jordens overflate er hav Ocean Space Centre Ocean Space Centre 2 Student lab Basin I - Width=40m, Length=180m, Depth=6m Testing of
DetaljerPARABOLSPEIL. Still deg bak krysset
PARABOLSPEIL Stå foran krysset på gulvet og se inn i parabolen. Hvordan ser du ut? Still deg bak krysset på gulvet. Hva skjer? Hva skjer når du stiller deg på krysset? Still deg bak krysset Det krumme
DetaljerSoftware applications developed for the maritime service at the Danish Meteorological Institute
Software applications developed for the maritime service at the Danish Meteorological Institute Anne Marie Munk Jørgensen (ammj@dmi.dk), Ove Kjær, Knud E. Christensen & Morten L. Mortensen Danish Meteorological
DetaljerModellering av tarebiomasseproduksjon
SIG Seaweed dyrkingsteknologi, 28. mai 2015 Modellering av tarebiomasseproduksjon Ole Jacob Broch, S. Forbord, A. Handå, J. Skjermo, K.B. Steinhovden, I.H.Ellingsen SINTEF Fiskeri og havbruk AS 1 Hvorfor
DetaljerEKSAMENSOPPGAVE (BOKMAL)
EKSAMENSOPPGAVE (BOKMAL) Eksamen i : GEO-2003 Kvartaergeologi Dato : 9. desember 2005 Tid : 0900-1300 Sted : Aud. max, Administrasjonsbygget Tillatte hjelpemidler : Ingen Oppgavesettet er ph 3 sider inkl.
DetaljerLagringssikkerhet Seleksjonskriterier for lager
Lagringssikkerhet Seleksjonskriterier for lager Erik Lindeberg SINTEF Petroleumsforsking NTNU/TEKNA kursdagene 7.-8. januar 2010 CO 2 -håndtering-post København Trondheim 8. januar 2010 SINTEF Petroleumsforskning
DetaljerESTABLISHING A EUROPEAN HIGH POWER CHARGING NETWORK JAN HAUGEN IHLE, REGIONSDIREKTØR NORTHERN EUROPE, IONITY. IONITY Präsentation October 2018
BIDRAR NETTSELSKAPENE TIL REGJERINGENS MÅL OM KUN SALG AV UTSLIPPSFRIE BILER I 2025? ESTABLISHING A EUROPEAN HIGH POWER CHARGING NETWORK JAN HAUGEN IHLE, REGIONSDIREKTØR NORTHERN EUROPE, IONITY IONITY
DetaljerNORWEGIAN UNIVERSITY OF LIFE SCIENCES. EXFLOOD EXFLOOD (Bioforsk, UMB, NVE, Minnesota, KTH, Insurance companies, 3 municipalities)
1 EXFLOOD EXFLOOD (Bioforsk, UMB, NVE, Minnesota, KTH, Insurance companies, 3 municipalities) The major objective of the ExFlood project is to define and analyze measures to combat negative impact of extreme
DetaljerForskerseminar Havet og kysten PROOFNY & OLF. Toril Røe Utvik Einar Lystad
Forskerseminar Havet og kysten PROOFNY & OLF Toril Røe Utvik Einar Lystad Rapportering av utslipp Rapporteringsfrist 1. mars Felles tall for Klif, OD og OLF Viser statistikk for: Produsert olje, kondensat
DetaljerSlope Run-out: Hvor stopper kvikkleira?
Slope Run-out: Hvor stopper kvikkleira? Vikas Thakur Professor (geoteknikk), Institutt for bygg og Miljøteknikk, NTNU (Bidrag fra Anders Rosenquist, Suzanne Lacasse og Jihwan Kim) Kvikkleireskred Løsneområde:
DetaljerVLSI Design for Yield on Chip Level
IBM Systems and Technology Group Markus Bühler Jeanne Bickford Jason Hibbeler Jürgen Koehl DATE 2006 Outline Catastrophic Failures Defect Mechanisms State of the Art Novel Techniques Conclusion 2 Catastrophic
DetaljerA NEW REALITY. DNV GL Industry Outlook for 2016. Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016,
OIL & GAS A NEW REALITY DNV GL Industry Outlook for 2016 Kjell Eriksson, Regional Manager Oil & Gas, Norway 02 Februar - Offshore Strategi Konferansen 2016, 1 2013 SAFER, SMARTER, GREENER 3 februar 2016
DetaljerFjellskred. Ustabil fjellhammer med en stor sprekk i Tafjord. Fjellblokka har et areal på størrelse med en fotballbane og er på over 1 million m 3.
Fjellskred Store fjellskred har ført til noen av de verste naturkatastrofene vi kjenner til i Norge. På nordlige deler av Vestlandet viser historisk dokumentasjon at det har vært 2-3 store katastrofer
DetaljerHavbunnsseismikk En praktisk gjennomgang av utstyr og operasjoner
Havbunnsseismikk En praktisk gjennomgang av utstyr og operasjoner Eivind Frømyr, PGS Geophysical Bodø 17. Ferbruar 2005 fisk og seismikk 2005 Innhold Inntroduksjon Hvorforgjør industrien OBC undersøkelser
DetaljerBRANDANGERSUNDET BRO. Entreprenørens utfordringer ved bygging av broa Presentasjon på Brodagen 10.november 2009 Ved Torbjørn Kjoberg, Skanska
BRANDANGERSUNDET BRO Entreprenørens utfordringer ved bygging av broa Presentasjon på Brodagen 10.november 2009 Ved Torbjørn Kjoberg, Skanska Brandangersundet network arch bridge Free span: 220 meter Skanska
DetaljerMiljøkonsekvenser av raske vannstandsendringer (effektkjøring)
Miljøkonsekvenser av raske vannstandsendringer (effektkjøring) Atle Harby, SINTEF Energi Jo Vegar Arnekleiv (LFI), Torbjørn Forseth (NINA), Jan Heggenes (LFI), Svein Jakob Saltveit (LFI), Stefan Schmutz
DetaljerSeaWalk No 1 i Skjolden
SeaWalk No 1 i Skjolden August 2011 Luster Kommune Marked I løpet av de neste 10 år er verdens cruisemarked ventet å doble seg. Veksten forventes større i Europa enn i Kariben og USA. Markedet vil lete
DetaljerRevegetering av steintipper i høgfjellet
Prosjektet er et samarbeid med Rune Halvorsen, UiO, og Arvid Odland, HiT. Det er finansiert av EnergiNorge, Høgskulen i Sogn og Fjordane og NVE. Revegetering av steintipper i høgfjellet Knut Rydgren, Høgskulen
DetaljerMÅLING OG VURDERING AV TEKSTUR I VEGOVERFLATER OG KOPLING TIL STØY
MÅLING OG VURDERING AV TEKSTUR I VEGOVERFLATER OG KOPLING TIL STØY Av Svein Å. Storeheier Miljøvennlige vegdekker, 2006-09-14 1 TEXTURE what can be measured The road surface is scanned by a laser system,
DetaljerSammensatte Forsterkningsskjemaer
Sammensatte Forsterkningsskjemaer Erik Arntzen HiOA V-2015 1 Sammensatte forsterkningsskjemaer Disse kan arrangeres: Suksessivt eller simultant Med eller uten diskriminative stimuli Som forsterkningskontingens
DetaljerNORGES TEKNISK-NATURVITENSKAPELIGE UNIVERSITET Side 1 av 5 INSTITUTT FOR ENERGI- OG PROSESSTEKNIKK
NORGES TEKNISK-NATURVITENSKAPEIGE UNIVERSITET Side 1 av 5 INSTITUTT FOR ENERGI- OG PROSESSTEKNIKK Faglig kontakt under eksamen: Reidar Kristoffersen, tlf.: 73 59 35 67 EKSAMEN I TEP 4110 FUIDMEKANIKK Bokmål/Nnorsk/English
DetaljerImplementering av korreksjonsfaktorer for temperatur og trykkeffekter i ultralyd gassmålere Løypemelding fra OD-prosjekt
Implementering av korreksjonsfaktorer for temperatur og trykkeffekter i ultralyd gassmålere Løypemelding fra OD-prosjekt NFOGM Temadag 22.03.2012 Forfatter: Reidar Sakariassen, MetroPartner AS - Bakgrunn
DetaljerHvor, når og hvorfor går det skred?
Hvor, når og hvorfor går det skred? Litt historikk Hvor løsner det skred og hvor langt kan de nå ut i dalbunnen? Under hvilke værforhold går det skred? Skredstatistikk i Norge Totalt ca. 2000 omkomne siste
DetaljerConfidence-based Data Management for Personal Area Sensor Nets
Confidence-based Data Management for Personal Area Sensor Nets Nesime Tatbul, Stan Zdonik Brown University Mark Buller, Reed Hoyt, Steve Mullen USARIEM Talk Outline Warfighter Physiologic Status Monitoring
DetaljerStatskrafts vindkraftssatsning i Midt-norge Endelige konsesjoner i Midt- Norge OED statfestet 26. august 2013 NVEs konsesjonsvedtak: 8 vindkraftverk, > 1300 MW Strøm til 180 000 husstander 3 ganger årlig
DetaljerResistivitetsmålinger, muligheter og begrensninger.
Resistivitetsmålinger, muligheter og begrensninger. by Jan S. Rønning Dalsegg, E., Ganerød, G.V., Reiser, F. & Solberg, I-L Geological Survey of Norway SVV Teknologidagene 2010, Tunnel, betong og geologi.
DetaljerStatoils erfaringer fra CO 2 -lagring
Statoils erfaringer fra CO 2 -lagring Presentert av Ola Eiken Tekna kursdager 7. januar 2011 Offshore Sleipner Onshore In Salah Sub-sea Snøhvit 1 - Classification: External 2011-01-07 Snøhvit Sleipner
Detaljer230V 110V 25% (230V) 110V 110V 230V
MMA Inverter range Choose your Perfect MMA Inverter Ranging from 140-400 Amps Parweld offers a range of lightweight MMA inverter machines ideal for everyday maintenance to heavy applications Enclosure
DetaljerØkonomisk analyse av ITS-baserte trafikksikkerhetsteknologier: en eksplorerende studie
Økonomisk analyse av ITS-baserte trafikksikkerhetsteknologier: en eksplorerende studie Basert på EU-prosjektet IN-SAFETY ITS-fagdag, Oslo 12. april 2010 Jeg skal si litt om følgende: Det finnes foreløpig
DetaljerSamfunnsøkonomiske konsekvenser NGI, CICERO
Samfunnsøkonomiske konsekvenser Christian Jaedicke, Asbjørn Aaheim Christian Jaedicke, Asbjørn Aaheim NGI, CICERO Geofarer: e involverte prosesser Vær Terreng Skred Konsekvens Infrastruktur Konsekvensens
DetaljerDuke Energy Seminar September 3 5, 2008 Concord, NC
Duke Energy Seminar September 3 5, 2008 Concord, NC Ron Richard Senior Consultant RE Consulting -1- Ball Mills -2- Limestone Fineness Some of the FGD vendors have stated that one of the biggest causes
Detaljer5 E Lesson: Solving Monohybrid Punnett Squares with Coding
5 E Lesson: Solving Monohybrid Punnett Squares with Coding Genetics Fill in the Brown colour Blank Options Hair texture A field of biology that studies heredity, or the passing of traits from parents to
DetaljerPumpeturbiner og Tekniske Utfordringer
Maskinteknisk Forum 20 Juni 2008 Pumpeturbiner og Tekniske Utfordringer Presentasjon ved Bjørn Åril Norsk teknologi for ren energi Hovedinnhold: Dinorwig og systemkrav Noen tekniske utfordringer ved pumpeturbiner
DetaljerFremtidsrettede prosjekter ved SMS
Fremtidsrettede prosjekter ved SMS Arctic Emergency Operations Arctic Marine Operations Bård E. Bjørnsen Projects & Business Development Ship Manoeuvring Simulator Centre AS Bakgrunn for nordområdeprosjektene
DetaljerRecycling technology for fish in cold water vs model trout farms and cage farming
Recycling technology for fish in cold water vs model trout farms and cage farming Presented by: Steinar Skybakmoen steinar@oppdrettsteknologi.no Mobil +47 4804 7204 Some definitions Water flow-through
DetaljerEtt rent hav vår framtid
Ett rent hav vår framtid Marint affald - trusler, udfordringer og løsninger Midtvejskonference Ren Kustlinje Frederikshavn 12-13 september 2017 Spredningen af plast i havet, globale og lokale spredningsveje
Detaljermelting ECMI Modelling week 2008 Modelling and simulation of ice/snow melting Sabrina Wandl - University of Linz Tuomo Mäki-Marttunen - Tampere UT
and and ECMI week 2008 Outline and Problem Description find model for processes consideration of effects caused by presence of salt point and numerical solution and and heat equations liquid phase: T L
DetaljerSmart High-Side Power Switch BTS730
PG-DSO20 RoHS compliant (green product) AEC qualified 1 Ω Ω µ Data Sheet 1 V1.0, 2007-12-17 Data Sheet 2 V1.0, 2007-12-17 Ω µ µ Data Sheet 3 V1.0, 2007-12-17 µ µ Data Sheet 4 V1.0, 2007-12-17 Data Sheet
DetaljerPå alerten mot naturfare. Sverre Kjetil Rød, Ph.D Statens vegvesen/høgskulen i Volda
På alerten mot naturfare Sverre Kjetil Rød, Ph.D Statens vegvesen/høgskulen i Volda Risikokommunikasjon i samband med skred og flodbølge frå Åkneset Risiko = sannsyn x konsekvens "Det er eit årleg sannsyn
DetaljerPåregnelige verdier av vind, ekstremnedbør og høy vannstand i Flora kommune fram mot år 2100
Vervarslinga på Vestlandet Allégt. 70 5007 BERGEN 19. mai 006 Flora kommune ved Øyvind Bang-Olsen Strandgata 30 6900 Florø Påregnelige verdier av vind, ekstremnedbør og høy vannstand i Flora kommune fram
DetaljerSteinsprangområde over Holmen i Kåfjorddalen
Steinsprangområde over Holmen i Kåfjorddalen Geofaglig rapport fra Seksjon for fjellskred (SVF), 15. september 2015 Oppsummering Et fjellparti ovenfor Holmen i Kåfjorddalen er i stor bevegelse og vil høyst
DetaljerDepth mld. to main deck. Displacement at maximum draft. Side thruster aft about Side thruster forward, retractable and about
IST WIND AS - IST Mermaid- May 2016 A trimaran vessel with a bow fender suited to access the turbines, a speed of 20 knots and a passenger capacity of twelve persons. Length o.a. Breath moulded Depth mld.
Detaljer