1 SUBSEA LØSNING FOR SNORRE EXPANSION PROJECT (SEP) Subsea dag - Sogn og Fjordane Jørn Loug Hansen Subsea Manager, Snorre Expansion Project 1 Classification: Open 4 august 2016 Statoil ASA

2 Snorre-area and infrastructure Rettighetshavere: * Core Energy ikke rettighetshaver i Tordis og Vigdis 2 Classification: Open 4 august 2016 Statoil ASA

3 Background 3 Classification: Open 4 august 2016 Statoil ASA

4 Snorre Expansion Project (SEP) Snorre B Snorre A Drainage strategy : Water alternating Gas injection (WAG) Max production : bbls/day Total recoverable volumes : approx. 30 MSm³ (180 mill bbls) Start-up : off four-slot subsea templates tied back to Snorre A Topside Modifications on Snorre A Drilling of 22 wells - Production and Water/Gas injection Gas Import pipeline Snorre A Gullfaks A Oil Export to Gullfaks and later Mongstad 4 Classification: Open 4 august 2016 Statoil ASA

5 SUBSEA KONSEPT FOR SNORRE EXPANSION «MER ENN SUBSEA» Topside mod. Boring og brønn Subsea 5 Classification: Open 4 august 2016 Statoil ASA

6 Dagens SEP Subsea layout 6 Classification: Open 4 august 2016 Statoil ASA

7 FORDELING - SUBSEA DISIPLINENE Subsea Produksjons System Rørledninger, Stigerør og Umbilicals Marine Operasjoner Subsea Produksjons System: 6 stk 4-slots templates 6 stk subsea manifolder (Prod/WAG) 22 stk juletresystem Subsea Kontroll System Oppkoblingssystemer (Tie-in) Rørledninger, Stigerør, Umbilicals Statiske umbilicals 2 dynamiske umbilicals Produksjon, gass og vanninjekson flowlines 5 fleksible risere / riserbasestrukturer Y og T-er på rørledninger 4 rørledningsisolasjonsventiler (SSIVs) Gass import rørledning fra SNA til Gullfaks 7 Classification: Open 4 august 2016 Statoil ASA

8 Typical four slot integrated template structure 8 Classification: Open 4 august 2016 Statoil ASA

9 Standardisering og forenkling 9 Classification: Open 4 august 2016 Statoil ASA

10 W3.2 Next level standardisation & industrialisation Building blocks of Statoil s standardisation and industrialisation strategy Setting the standardisation and industrialisation ambition and direction for Statoil (CEC) standardisation & industrialisation Setting the standardisation and industrialisation ambition and direction per category D&W Facilities & Subsea OPS Involving the full set of relevant parties Peers Statoil assets Statoil projects Statoil disciplines Contractor & suppliers 2 Requirements 4 Re-use at all Applying the levels end-to-end 1 Int. and 3 toolbox Design to 5 Inquiry ind. standards cost 6 Contract models 7 Execution model 10 Classification: Open 4 august 2016 Statoil ASA

11 Standardized and configurable System is configured to field spesific requirements Building blocks are standard but configured as required to meet field requirements, i.e reservoir conditions, seabed conditions and host platform characteristics System configurations Oil production Oil production w/gas lift Gas production Gas injection Water injection Combinations of above Building blocks 4 slot templates Single slot templates (satellites) Wellhead Tubing Hanger Xmas Tree Choke Module Manifold Production Control System Tie-in tool (normally rented) 11 Classification: Open 4 august 2016 Statoil ASA

12 Example - Standard ITS (Integrated Template Structure) Manifold configuratons X-Mas tree configuratons 12 Classification: Open 4 august 2016 Statoil ASA

13 INDUSTRISAMMARBEID Standardisering & forenkling Noen eksempler 13 Classification: Open 4 august 2016 Statoil ASA

14 OPPSUMMERING : Oppsummering : De vanskelige fatene gjennstår å få produsert. Snorre Expansion Project vil bidra med betydelige ekstra volumer og aktivitet i bransjen hvis realisert Subsealøsning «mer enn subsea» Prosjektøkoniomien enda en utfordring. Forenkling, standardisering, industralisering og sammarbeid på tvers i bransjen viktig for å få til en nødvendig varig endring i kostnadsnivå.